| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$15,000.00 |
$20,112.79 |
$38,000.00 |
$28,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$2.50 |
$3.24 |
$1.76 |
$2.10 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$12.00 |
$6.11 |
$6.60 |
$8.25 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 2,000 | SY |
$2.10 |
$5.13 |
$2.20 |
$3.00 |
| 5 | 307(B) 4210 |
CEMENT KILN DUST | 363 | TON |
$50.00 |
$113.74 |
$83.00 |
$230.00 |
| 6 | 310(B) 0149 |
SUBGRADE, METHOD B | 8,414 | SY |
$1.10 |
$1.20 |
$2.37 |
$6.85 |
| 7 | 317 4270 |
CEMENT TREATED BASE | 8,216 | SY |
$14.50 |
$18.29 |
$14.00 |
$19.00 |
| 8 | 408 5774 |
PRIME COAT | 1,791 | GAL |
$4.00 |
$7.80 |
$9.90 |
$6.00 |
| 9 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,187 | SY |
$15.00 |
$25.70 |
$19.00 |
$17.65 |
| 10 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 6,606 | SY |
$19.00 |
$21.12 |
$26.00 |
$37.00 |
| 11 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 2,367 | CY |
$105.00 |
$113.24 |
$105.00 |
$165.00 |
| 12 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 951 | LF |
$5.00 |
$11.64 |
$7.20 |
$11.25 |
| 13 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 107 | SY |
$55.00 |
$65.96 |
$58.00 |
$90.00 |
| 14 | 610(C) 5824 |
DECORATIVE MEDIAN CONCRETE | 126 | SY |
$115.00 |
$64.09 |
$73.00 |
$155.00 |
| 15 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 171 | SY |
$10.00 |
$12.39 |
$10.80 |
$12.50 |
| 16 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 7,826 | SY |
$6.00 |
$4.25 |
$7.80 |
$2.50 |
| 17 | 619(C) 0924 |
SAWING PAVEMENT | 661 | LF |
$3.50 |
$3.71 |
$4.20 |
$8.00 |
| 18 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.58 | CY |
$750.00 |
$2,488.74 |
$1,070.00 |
$2,500.00 |
| 19 | 804(B) 2916 |
REINFORCING STEEL | 33.4 | LB |
$3.50 |
$4.15 |
$2.75 |
$4.10 |
| 20 | 805(B) 8732 |
(PL)RESET OF LIGHT POLE | 1 | EA |
$500.00 |
$3,370.16 |
$4,200.00 |
$4,000.00 |
| 21 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$200.00 |
$186.65 |
$198.00 |
$375.00 |
| 22 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 112.82 | SF |
$16.00 |
$23.85 |
$25.30 |
$23.50 |
| 23 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 179.5 | LF |
$10.00 |
$9.33 |
$10.80 |
$9.25 |
| 24 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,550 | LF |
$0.7500 |
$0.4300 |
$0.4900 |
$0.5000 |
| 25 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 140 | LF |
$18.00 |
$9.33 |
$10.80 |
$9.25 |
| 26 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 12 | EA |
$150.00 |
$207.39 |
$240.00 |
$205.00 |
| 27 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$40.00 |
$23.44 |
$27.00 |
$25.00 |
| 28 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$10.00 |
$1.04 |
$1.20 |
$1.25 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$13,000.00 |
$17,820.40 |
$20,600.00 |
$20,000.00 |
| 30 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$13,688.06 |
$9,000.00 |
$10,500.00 |
| 31 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$19,382.08 |
$52,000.00 |
$65,000.00 |