| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$4,750.00 |
$5,000.00 |
$6,250.00 |
$5,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$15,000.00 |
$42,500.00 |
$35,000.00 |
$34,750.00 |
$25,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 800 | LF |
$3.00 |
$2.95 |
$3.00 |
$3.00 |
$5.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$7.00 |
$9.00 |
$6.00 |
$10.75 |
$10.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 2,700 | SY |
$2.00 |
$2.95 |
$3.00 |
$2.70 |
$4.00 |
| 6 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 500 | TON |
$100.00 |
$135.00 |
$120.00 |
$128.58 |
$120.00 |
| 7 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 300 | TON |
$100.00 |
$150.00 |
$150.00 |
$153.06 |
$140.00 |
| 8 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 180 | TON |
$35.00 |
$36.50 |
$35.00 |
$44.17 |
$50.00 |
| 9 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 300 | LF |
$75.00 |
$66.50 |
$85.00 |
$143.10 |
$100.00 |
| 10 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 3,600 | LF |
$1.00 |
$1.15 |
$1.25 |
$1.20 |
$1.50 |
| 11 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$10.00 |
$15.00 |
$12.00 |
$11.00 |
$10.00 |
| 12 | 501(G) 6309 |
CLSM BACKFILL | 66 | CY |
$125.00 |
$150.00 |
$150.00 |
$172.50 |
$150.00 |
| 13 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 164 | LF |
$175.00 |
$225.00 |
$200.00 |
$220.00 |
$225.00 |
| 14 | 504(B) 1305 |
SAW-CUT GROOVING | 142.2 | SY |
$7.00 |
$15.00 |
$18.00 |
$15.61 |
$20.00 |
| 15 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 165.6 | LF |
$70.00 |
$65.00 |
$75.00 |
$83.00 |
$100.00 |
| 16 | 506(A) 1322 |
STRUCTURAL STEEL | 280 | LB |
$3.00 |
$3.75 |
$3.00 |
$4.25 |
$10.00 |
| 17 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$750.00 |
$750.00 |
$500.00 |
$1,200.00 |
$500.00 |
| 18 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$750.00 |
$750.00 |
$500.00 |
$1,200.00 |
$500.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 45 | CY |
$500.00 |
$575.00 |
$650.00 |
$570.00 |
$550.00 |
| 20 | 509(B) 1328 |
CLASS A CONCRETE | 56.8 | CY |
$450.00 |
$575.00 |
$600.00 |
$580.00 |
$800.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 19,160 | LB |
$1.00 |
$1.13 |
$1.00 |
$0.9700 |
$1.00 |
| 22 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 192 | LF |
$25.00 |
$35.00 |
$40.00 |
$31.50 |
$30.00 |
| 23 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 450 | LF |
$35.00 |
$40.00 |
$50.00 |
$38.68 |
$35.00 |
| 24 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 192 | LF |
$10.00 |
$8.00 |
$10.00 |
$13.50 |
$30.00 |
| 25 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 450 | LF |
$10.00 |
$8.00 |
$10.00 |
$16.58 |
$30.00 |
| 26 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 330 | TON |
$35.00 |
$36.50 |
$40.00 |
$41.71 |
$60.00 |
| 27 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 250 | SY |
$4.00 |
$3.25 |
$35.00 |
$11.10 |
$5.00 |
| 28 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$20.00 |
$20.00 |
$40.50 |
$15.00 |
| 29 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$15.00 |
$20.00 |
$25.00 |
$38.50 |
$15.00 |
| 30 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$5,000.00 |
$6,250.00 |
$15,000.00 |
| 31 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,500.00 |
$2,450.00 |
$2,500.00 |
$2,394.00 |
$2,250.00 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$3,200.00 |
$5,500.00 |
$3,240.00 |
$8,000.00 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$4,750.00 |
$4,000.00 |
$7,200.00 |
$15,000.00 |
| 34 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$13,775.00 |
$15,000.00 |
$25,000.00 |
$25,000.00 |