| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$10,400.00 |
$8,500.00 |
$3,600.00 |
$40,000.00 |
$8,500.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$10,000.00 |
$22,500.00 |
$15,000.00 |
$31,500.00 |
$40,000.00 |
$20,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 400 | LF |
$4.00 |
$3.00 |
$5.00 |
$4.79 |
$3.70 |
$5.00 |
$3.70 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 50 | LF |
$10.00 |
$6.00 |
$15.00 |
$11.00 |
$9.40 |
$10.00 |
$9.50 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 600 | SY |
$3.00 |
$6.00 |
$5.00 |
$3.00 |
$3.70 |
$4.00 |
$3.70 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.4 | AC |
$2,000.00 |
$300.00 |
$500.00 |
$1,100.00 |
$1,050.00 |
$2,000.00 |
$1,050.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 230 | CY |
$40.00 |
$60.00 |
$67.50 |
$60.00 |
$50.00 |
$50.00 |
$62.00 |
| 8 | 408 5774 |
PRIME COAT | 454 | GAL |
$4.50 |
$5.00 |
$6.00 |
$3.89 |
$4.70 |
$10.00 |
$5.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 165 | TON |
$100.00 |
$150.00 |
$163.00 |
$150.00 |
$138.00 |
$140.00 |
$140.00 |
| 10 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 100 | TON |
$35.00 |
$50.00 |
$49.00 |
$75.00 |
$72.00 |
$60.00 |
$85.00 |
| 11 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 100 | SY |
$5.00 |
$3.00 |
$10.00 |
$6.00 |
$33.50 |
$5.00 |
$20.00 |
| 12 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 26 | LF |
$60.00 |
$40.00 |
$42.00 |
$55.00 |
$78.00 |
$50.00 |
$100.00 |
| 13 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,500.00 |
$400.00 |
$425.00 |
$250.00 |
$500.00 |
$500.00 |
$500.00 |
| 14 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 458 | LF |
$2.00 |
$4.00 |
$1.50 |
$3.50 |
$1.02 |
$2.00 |
$1.00 |
| 15 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 35.72 | CY |
$35.00 |
$30.00 |
$28.75 |
$75.00 |
$51.00 |
$100.00 |
$40.00 |
| 16 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 129 | LF |
$60.00 |
$90.00 |
$95.00 |
$115.00 |
$78.00 |
$125.00 |
$250.00 |
| 17 | 509(A) 1326 |
CLASS AA CONCRETE | 149.81 | CY |
$450.00 |
$500.00 |
$468.00 |
$500.00 |
$410.00 |
$600.00 |
$1,100.00 |
| 18 | 511(A) 1332 |
REINFORCING STEEL | 26,147 | LB |
$1.00 |
$1.00 |
$0.9700 |
$1.34 |
$1.20 |
$1.00 |
$1.50 |
| 19 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$6,450.00 |
$7,500.00 |
$10,200.00 |
$15,000.00 |
$19,000.00 |
| 20 | 623(F) 6034 |
GUARDRAIL ANCHOR UNIT (TYPE III) | 4 | EA |
$2,000.00 |
$2,000.00 |
$2,561.50 |
$2,200.00 |
$2,080.00 |
$2,500.00 |
$2,400.00 |
| 21 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$4,000.00 |
$2,326.50 |
$4,000.00 |
$2,080.00 |
$5,000.00 |
$6,000.00 |
| 22 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$4,500.00 |
$7,800.00 |
$6,300.00 |
$7,500.00 |
$3,000.00 |
| 23 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$23,000.00 |
$13,000.00 |
$34,000.00 |
$15,000.00 |
$40,000.00 |