Bid tab 120148

Let Mar 15, 2012 · · Leflore Sign up free

‹ Mar 2012 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-477): OVER TRIBUTARY OF POTEAU RIVER 2.8 MILES SOUTH AND 0.5 MILES WEST OF US -271/SH-9 JCT. PROJECT LENGTH = 0.071 MILES

Let date
Thursday, March 15, 2012
Contract
120148
J/P numbers
26904(04)
District
County
Leflore
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-477): OVER TRIBUTARY OF POTEAU RIVER 2.8 MILES SOUTH AND 0.5 MILES WEST OF US -271/SH-9 JCT. PROJECT LENGTH = 0.071 MILES
Project number
BRO-140D(189)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$262,471
1 HUB Construction, Inc. Low bidder $214,246 -18.4%
2 K & R BUILDERS, INC. $247,801 -5.6% +15.7%
3 GLOVER & ASSOCIATES, INC. $248,711 -5.2% +16.1%
4 SCHIRALLI CONSTRUCTION CORP. $255,721 -2.6% +19.4%
5 EARTH BUILDERS, L.P. $322,786 +23.0% +50.7%
6 SCR CONSTRUCTION CO., INC. $402,573 +53.4% +87.9%

Bid tab: unit prices 23 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HUB Constructio…#2 K & R BUILDERS,…#3 GLOVER & ASSOCI…#4 SCHIRALLI CONST…#5 EARTH BUILDERS,…#6 SCR CONSTRUCTIO…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $5,000.00 $10,400.00 $8,500.00 $3,600.00 $40,000.00 $8,500.00
2202(H) 0185 EARTHWORK1LSUM $40,000.00 $10,000.00 $22,500.00 $15,000.00 $31,500.00 $40,000.00 $20,000.00
3221(C) 2801 TEMPORARY SILT FENCE400LF $4.00 $3.00 $5.00 $4.79 $3.70 $5.00 $3.70
4221(F) 0100 TEMPORARY SILT DIKE50LF $10.00 $6.00 $15.00 $11.00 $9.40 $10.00 $9.50
5230(A) 2806 SOLID SLAB SODDING600SY $3.00 $6.00 $5.00 $3.00 $3.70 $4.00 $3.70
6233(A) 2817 VEGETATIVE MULCHING0.4AC $2,000.00 $300.00 $500.00 $1,100.00 $1,050.00 $2,000.00 $1,050.00
7303(A) 2100 AGGREGATE BASE TYPE A230CY $40.00 $60.00 $67.50 $60.00 $50.00 $50.00 $62.00
8408 5774 PRIME COAT454GAL $4.50 $5.00 $6.00 $3.89 $4.70 $10.00 $5.00
9411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)165TON $100.00 $150.00 $163.00 $150.00 $138.00 $140.00 $140.00
10601(B) 0536 TYPE I-A PLAIN RIPRAP100TON $35.00 $50.00 $49.00 $75.00 $72.00 $60.00 $85.00
11601(I) 6312 FILTER FABRIC (RIPRAP)100SY $5.00 $3.00 $10.00 $6.00 $33.50 $5.00 $20.00
12613(B) 4529 35" X 24" CORR. GALV. STEEL PIPE ARCH26LF $60.00 $40.00 $42.00 $55.00 $78.00 $50.00 $100.00
13613(L) 4522 35" X 24" PREFAB. CULVERT END SECTION, ARCH2EA $1,500.00 $400.00 $425.00 $250.00 $500.00 $500.00 $500.00
14855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)458LF $2.00 $4.00 $1.50 $3.50 $1.02 $2.00 $1.00
15501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED35.72CY $35.00 $30.00 $28.75 $75.00 $51.00 $100.00 $40.00
16504(D) 6239 CONCRETE RAIL (TR3)129LF $60.00 $90.00 $95.00 $115.00 $78.00 $125.00 $250.00
17509(A) 1326 CLASS AA CONCRETE149.81CY $450.00 $500.00 $468.00 $500.00 $410.00 $600.00 $1,100.00
18511(A) 1332 REINFORCING STEEL26,147LB $1.00 $1.00 $0.9700 $1.34 $1.20 $1.00 $1.50
19619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $5,000.00 $6,450.00 $7,500.00 $10,200.00 $15,000.00 $19,000.00
20623(F) 6034 GUARDRAIL ANCHOR UNIT (TYPE III)4EA $2,000.00 $2,000.00 $2,561.50 $2,200.00 $2,080.00 $2,500.00 $2,400.00
21880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $10,000.00 $4,000.00 $2,326.50 $4,000.00 $2,080.00 $5,000.00 $6,000.00
22642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $10,000.00 $3,500.00 $4,500.00 $7,800.00 $6,300.00 $7,500.00 $3,000.00
23641 1399 MOBILIZATION1LSUM $25,000.00 $10,000.00 $23,000.00 $13,000.00 $34,000.00 $15,000.00 $40,000.00