| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 400 | CY |
$9.75 |
$16.50 |
$7.65 |
| 2 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 260 | CY |
$45.00 |
$60.00 |
$35.70 |
| 3 | 325 5271 |
SEPARATOR FABRIC | 1,965 | SY |
$1.58 |
$1.50 |
$3.06 |
| 4 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,660 | TON |
$20.00 |
$21.00 |
$24.31 |
| 5 | 404(G) 4845 |
ULTRA-THIN BONDED WEARING COURSE, TYPE C | 18,098 | TON |
$98.21 |
$93.30 |
$98.97 |
| 6 | 407(C) 0300 |
POLYMER MODIFIED CATIONIC RAPID SET - 1 | 37,207 | GAL |
$3.00 |
$3.05 |
$3.75 |
| 7 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 14,962 | TON |
$68.88 |
$71.10 |
$78.03 |
| 8 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,156 | TON |
$64.91 |
$66.80 |
$71.30 |
| 9 | 412 5267 |
COLD MILLING PAVEMENT | 16,720 | SY |
$1.32 |
$2.10 |
$2.34 |
| 10 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 85,878 | LF |
$0.0700 |
$0.1100 |
$0.1600 |
| 11 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 412 | SY |
$20.42 |
$67.00 |
$127.50 |
| 12 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 2,900 | SY |
$50.00 |
$95.00 |
$63.24 |
| 13 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 697 | CY |
$94.07 |
$120.00 |
$127.50 |
| 14 | 414(I) 5266 |
TYPE 3 TERMINAL JOINT | 2 | EA |
$10,178.57 |
$7,000.00 |
$48,450.00 |
| 15 | 414(J) 5263 |
TERMINAL JOINT SLEEPER SLAB | 125 | SY |
$79.30 |
$150.00 |
$168.30 |
| 16 | 415 6300 |
CONCRETE JOINT SEALING | 800 | LF |
$5.00 |
$4.00 |
$5.10 |
| 17 | 504(A) 1304 |
APPROACH SLAB | 280 | SY |
$80.00 |
$160.00 |
$142.80 |
| 18 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,000 | LF |
$5.00 |
$6.50 |
$7.65 |
| 19 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 500 | LF |
$5.00 |
$4.75 |
$7.65 |
| 20 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$514.79 |
$980.00 |
$510.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$1,620.00 |
$5,100.00 |
| 22 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 1,115 | SY |
$3.02 |
$30.00 |
$10.20 |
| 23 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 3 | EA |
$404.60 |
$500.00 |
$510.00 |
| 24 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 88,200 | LF |
$0.4500 |
$0.4400 |
$0.4500 |
| 25 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 14,800 | LF |
$0.6600 |
$0.6600 |
$0.6700 |
| 26 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 3,000 | LF |
$1.21 |
$0.8800 |
$0.9000 |
| 27 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$44,800.00 |
$20,600.00 |
$35,409.59 |
| 28 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$165,000.00 |
$132,390.81 |