| 1 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 120 | SD |
$15.00 |
$5.00 |
$2.00 |
$46.50 |
| 2 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 120 | SD |
$5.00 |
$5.00 |
$1.00 |
$6.25 |
| 3 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,720 | SD |
$0.2000 |
$0.0100 |
$0.0200 |
$0.6500 |
| 4 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,880 | SD |
$0.5000 |
$0.0100 |
$0.0200 |
$2.00 |
| 5 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,640 | SD |
$0.7500 |
$3.00 |
$1.00 |
$2.85 |
| 6 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$0.3500 |
$0.0100 |
$0.0200 |
$1.15 |
| 7 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$0.8000 |
$2.00 |
$0.0200 |
$1.20 |
| 8 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,920 | SD |
$0.1000 |
$0.0100 |
$0.0200 |
$0.3500 |
| 9 | 880(F) 8878 |
DRUMS | 3,600 | SD |
$0.1000 |
$0.0100 |
$0.0200 |
$0.8500 |
| 10 | 880(G) 8890 |
CHANNELIZER CONES | 30,000 | SD |
$0.1000 |
$0.0100 |
$0.4500 |
$0.1500 |
| 11 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 200 | HOUR |
$50.00 |
$60.00 |
$50.00 |
$67.50 |
| 12 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$9.50 |
$5.00 |
$2.00 |
$18.00 |
| 13 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,805 | CY |
$3.50 |
$5.00 |
$5.60 |
$18.25 |
| 14 | 202(D) 0184 |
UNCLASSIFIED BORROW | 795 | CY |
$5.00 |
$10.00 |
$20.00 |
$6.85 |
| 15 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,150 | LF |
$1.75 |
$0.3000 |
$0.5000 |
$1.75 |
| 16 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 14 | EA |
$120.00 |
$50.00 |
$100.00 |
$85.00 |
| 17 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,120 | LF |
$6.50 |
$3.00 |
$7.00 |
$6.85 |
| 18 | 230(A) 2806 |
SOLID SLAB SODDING | 56,734 | SY |
$1.25 |
$1.30 |
$1.10 |
$1.20 |
| 19 | 241 2832 |
MOWING | 29 | AC |
$50.00 |
$50.00 |
$55.00 |
$35.00 |
| 20 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,481 | TON |
$15.00 |
$22.00 |
$23.00 |
$27.00 |
| 21 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 30,000 | LF |
$0.0500 |
$0.2000 |
$0.1700 |
$0.1000 |
| 22 | 413(D) 4869 |
RUMBLE STRIP METHOD PCC-CYC | 45,200 | LF |
$0.2500 |
$0.4000 |
$0.2400 |
$0.3000 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 274 | CY |
$300.00 |
$200.00 |
$90.00 |
$205.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 25 | CY |
$215.00 |
$200.00 |
$100.00 |
$305.00 |
| 25 | 612(C) 0645 |
INLET ADJUST TO GRADE | 12 | EA |
$1,500.00 |
$1,400.00 |
$1,550.00 |
$1,445.00 |
| 26 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 1,422 | LF |
$5.00 |
$10.00 |
$2.50 |
$28.50 |
| 27 | 619(C) 0924 |
SAWING PAVEMENT | 500 | LF |
$1.75 |
$1.00 |
$2.00 |
$2.25 |
| 28 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 17,997 | LF |
$9.25 |
$9.00 |
$8.10 |
$10.45 |
| 29 | 628(C) 5110 |
END ANCHORS | 24 | EA |
$1,750.00 |
$1,000.00 |
$4,000.00 |
$990.00 |
| 30 | 628(E) 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$1,750.00 |
$2,000.00 |
$3,000.00 |
$4,150.00 |
| 31 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 36,100 | LF |
$0.3500 |
$0.4500 |
$0.2400 |
$0.4000 |
| 32 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 4,600 | LF |
$0.6000 |
$0.6000 |
$0.3900 |
$0.6500 |
| 33 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 40,400 | LF |
$0.1000 |
$0.1700 |
$0.0900 |
$0.2000 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$3,125.00 |
$3,450.00 |
$5,400.00 |
| 35 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$30,000.00 |
$52,835.00 |
$59,500.00 |