| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$7.50 |
$12.00 |
$8.00 |
$25.00 |
$18.00 |
| 2 | 230(A) 2806 |
SOLID SLAB SODDING | 1,500 | SY |
$3.00 |
$4.00 |
$2.00 |
$2.30 |
$2.25 |
| 3 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,050 | TON |
$18.00 |
$18.50 |
$18.00 |
$22.00 |
$21.00 |
| 4 | 407(B) 0250 |
TACK COAT | 5,410 | GAL |
$2.00 |
$2.80 |
$2.00 |
$3.30 |
$2.50 |
| 5 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 9,600 | TON |
$73.00 |
$65.49 |
$76.00 |
$74.00 |
$91.00 |
| 6 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 130 | CY |
$425.00 |
$550.00 |
$500.00 |
$725.00 |
$710.00 |
| 7 | 511(A) 0332 |
REINFORCING STEEL | 9,770 | LB |
$1.30 |
$1.50 |
$0.7000 |
$1.30 |
$1.25 |
| 8 | 619(B) 0291 |
REMOVAL OF HEADWALL | 18 | EA |
$400.00 |
$550.00 |
$187.56 |
$700.00 |
$680.00 |
| 9 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 96,500 | LF |
$0.4000 |
$0.4000 |
$0.4500 |
$0.4600 |
$0.4000 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$35,000.00 |
$31,500.00 |
$8,685.00 |
| 11 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$7.50 |
$12.00 |
$8.00 |
$25.00 |
$18.00 |
| 12 | 230(A) 2806 |
SOLID SLAB SODDING | 1,300 | SY |
$3.00 |
$4.00 |
$2.00 |
$2.30 |
$2.25 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,400 | TON |
$30.00 |
$18.50 |
$18.00 |
$22.00 |
$21.00 |
| 14 | 407(B) 0250 |
TACK COAT | 3,250 | GAL |
$3.50 |
$2.80 |
$2.00 |
$3.30 |
$2.50 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,100 | TON |
$68.00 |
$65.49 |
$66.55 |
$74.00 |
$83.00 |
| 16 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 90 | CY |
$425.00 |
$550.00 |
$500.00 |
$725.00 |
$710.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 7,000 | LB |
$1.25 |
$1.50 |
$0.7000 |
$1.30 |
$1.25 |
| 18 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 14 | LF |
$120.00 |
$135.00 |
$161.72 |
$85.00 |
$100.00 |
| 19 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$960.00 |
$985.00 |
$2,154.76 |
$700.00 |
$1,000.00 |
| 20 | 619(B) 0291 |
REMOVAL OF HEADWALL | 14 | EA |
$400.00 |
$550.00 |
$241.15 |
$700.00 |
$680.00 |
| 21 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,420 | LF |
$2.00 |
$1.50 |
$1.00 |
$1.55 |
$1.50 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 900 | LF |
$12.00 |
$19.00 |
$19.95 |
$19.50 |
$19.00 |
| 23 | 623(C) 5202 |
BEAM GUARDRAIL THRIE-BEAM SINGLE | 190 | LF |
$15.00 |
$18.00 |
$15.75 |
$15.50 |
$15.00 |
| 24 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 16 | EA |
$1,100.00 |
$600.00 |
$525.00 |
$510.00 |
$500.00 |
| 25 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 1 | EA |
$1,000.00 |
$1,500.00 |
$1,417.50 |
$1,380.00 |
$1,350.00 |
| 26 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 16 | EA |
$1,100.00 |
$2,000.00 |
$2,021.25 |
$2,000.00 |
$1,925.00 |
| 27 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 104 | EA |
$30.00 |
$18.00 |
$21.00 |
$20.50 |
$18.00 |
| 28 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 60,100 | LF |
$0.5000 |
$0.4000 |
$0.4700 |
$0.4600 |
$0.4000 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$4,500.00 |
$35,000.00 |
$14,500.00 |
$7,465.00 |