| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,000.00 |
$4,750.00 |
$2,500.00 |
$15,750.00 |
$9,680.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,660 | CY |
$7.00 |
$6.50 |
$8.00 |
$5.25 |
$7.98 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$8.00 |
$16.50 |
$10.50 |
$6.30 |
$9.08 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$1,500.00 |
$4,750.00 |
$3,500.00 |
$8,400.00 |
$3,410.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 1,965 | LF |
$2.75 |
$0.5000 |
$1.05 |
$2.35 |
$1.17 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$6.00 |
$1.00 |
$6.00 |
$10.45 |
$8.84 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,000 | SY |
$2.00 |
$1.80 |
$1.80 |
$1.88 |
$1.87 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2 | AC |
$500.00 |
$100.00 |
$350.00 |
$300.00 |
$550.00 |
| 9 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,500 | TON |
$28.00 |
$19.25 |
$15.00 |
$21.00 |
$21.64 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$200.00 |
$350.00 |
$185.00 |
$440.00 |
| 11 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 825 | TON |
$30.00 |
$22.00 |
$22.50 |
$25.00 |
$30.78 |
| 12 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 60 | LF |
$35.00 |
$39.60 |
$26.00 |
$25.00 |
$28.66 |
| 13 | 613(D) 0698 |
72" CORR. GALV. STEEL PIPE | 30 | LF |
$100.00 |
$69.00 |
$70.00 |
$81.00 |
$92.71 |
| 14 | 613(D) 4819 |
96" CORR. GALV. STEEL PIPE | 60 | LF |
$170.00 |
$136.00 |
$125.00 |
$145.00 |
$110.09 |
| 15 | 613(G) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$300.00 |
$230.00 |
$350.00 |
$285.00 |
$274.75 |
| 16 | 613(G) 0769 |
72" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$1,500.00 |
$1,750.00 |
$2,000.00 |
$2,350.00 |
$2,195.19 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 60 | CY |
$15.00 |
$15.00 |
$35.00 |
$21.00 |
$13.20 |
| 18 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 40 | CY |
$15.00 |
$20.00 |
$65.00 |
$27.00 |
$13.20 |
| 19 | 503(B) 6144 |
PRESTRESSED CONCRETE DOUBLE TEE | 436 | LF |
$205.00 |
$224.00 |
$235.00 |
$213.00 |
$244.44 |
| 20 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 265 | LF |
$60.00 |
$65.00 |
$55.00 |
$37.00 |
$60.50 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 85 | CY |
$400.00 |
$400.00 |
$435.00 |
$510.00 |
$412.50 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 65 | CY |
$400.00 |
$400.00 |
$435.00 |
$510.00 |
$407.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 22,220 | LB |
$0.8000 |
$1.10 |
$0.8500 |
$1.00 |
$0.8900 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 450 | LF |
$30.00 |
$33.00 |
$26.75 |
$25.00 |
$31.15 |
| 25 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 450 | LF |
$15.00 |
$14.00 |
$12.00 |
$16.00 |
$13.20 |
| 26 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 48 | LF |
$500.00 |
$563.50 |
$675.00 |
$665.00 |
$484.37 |
| 27 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 1,080 | TON |
$30.00 |
$22.00 |
$22.50 |
$25.00 |
$26.38 |
| 28 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 202 | TON |
$20.00 |
$22.00 |
$18.50 |
$23.50 |
$24.39 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,000.00 |
$3,500.00 |
$1,500.00 |
$5,250.00 |
$5,500.00 |
| 30 | 623(F) 6033 |
GUARD RAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,300.00 |
$2,350.00 |
$2,025.00 |
$2,125.00 |
$2,227.50 |
| 31 | 623(F) 6034 |
GUARD RAIL ANCHOR UNIT (TYPE III) | 1 | EA |
$2,500.00 |
$2,250.00 |
$1,900.00 |
$2,000.00 |
$2,090.00 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$6,300.00 |
$4,000.00 |
$6,500.00 |
$4,400.00 |
| 33 | 642 0098 |
STAKING | 1 | LSUM |
$4,000.00 |
$4,750.00 |
$7,700.00 |
$7,250.00 |
$7,590.00 |
| 34 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$800.00 |
$4,000.00 |
$2,500.00 |
$2,750.00 |
| 35 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$24,000.00 |
$25,000.00 |
$16,000.00 |
$25,068.87 |