| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$8,800.00 |
$10,000.00 |
$15,729.13 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 20,704 | CY |
$5.00 |
$3.25 |
$7.50 |
$5.19 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 5,000 | CY |
$8.00 |
$11.25 |
$7.50 |
$9.18 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$19,450.00 |
$10,000.00 |
$85,335.29 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 48,585 | LF |
$3.00 |
$1.52 |
$1.60 |
$1.48 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 310 | LF |
$7.00 |
$7.36 |
$9.80 |
$7.14 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 76,966 | SY |
$2.50 |
$1.79 |
$1.55 |
$1.73 |
| 8 | 230(F) 2812 |
WATERING | 3,080 | MGAL |
$40.00 |
$10.52 |
$11.00 |
$18.85 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 15.9 | AC |
$500.00 |
$473.20 |
$200.00 |
$459.00 |
| 10 | 241 2832 |
MOWING | 15.9 | AC |
$125.00 |
$52.58 |
$100.00 |
$51.00 |
| 11 | 327(A) 4200 |
(SP)FLY ASH | 8,819 | TON |
$65.00 |
$75.00 |
$77.00 |
$67.18 |
| 12 | 327(D) 4230 |
(SP)LIME | 869 | TON |
$130.00 |
$150.00 |
$178.00 |
$174.03 |
| 13 | 327(E) 4240 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE | 164,112 | SY |
$5.00 |
$1.35 |
$2.50 |
$1.95 |
| 14 | 327(G) 4260 |
(SP)LIME PRETREATMENT | 48,009 | SY |
$4.00 |
$0.4000 |
$1.25 |
$1.44 |
| 15 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,691 | TON |
$35.00 |
$47.32 |
$35.00 |
$30.84 |
| 16 | 407 0250 |
TACK COAT | 30,925 | GAL |
$2.50 |
$2.53 |
$2.15 |
$3.01 |
| 17 | 408 5774 |
PRIME COAT | 27,001 | GAL |
$2.50 |
$4.06 |
$4.25 |
$3.83 |
| 18 | 411(S3) 5935 |
(SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) | 18,623 | TON |
$60.00 |
$62.60 |
$67.00 |
$72.04 |
| 19 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 93,531 | TON |
$54.00 |
$54.85 |
$54.00 |
$60.70 |
| 20 | 411(S4) 5950 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) | 12,098 | TON |
$67.00 |
$72.60 |
$77.00 |
$82.31 |
| 21 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 3,733 | TON |
$61.00 |
$58.75 |
$58.00 |
$64.33 |
| 22 | 413(A) 4861 |
RUMBLE STRIP-METHOD AC-CON | 55,800 | LF |
$0.5000 |
$0.1100 |
$0.0500 |
$0.2000 |
| 23 | 417 4267 |
COLD MILLING BITUMINOUS PAVEMENT | 32,900 | SY |
$5.00 |
$3.26 |
$4.50 |
$1.60 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$290.00 |
$304.95 |
$320.00 |
$410.98 |
| 25 | 609(B) 1514 |
1'-8" COMB. CURB & GUTTER (8" BARRIER) | 3,400 | LF |
$20.00 |
$21.03 |
$25.00 |
$15.12 |
| 26 | 613(CC) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$1,340.00 |
$1,577.34 |
$2,800.00 |
$2,739.67 |
| 27 | 613(D) 0692 |
36" CORR. GALV. STEEL PIPE | 86 | LF |
$56.00 |
$58.89 |
$50.00 |
$35.01 |
| 28 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$8,496.28 |
$7,500.00 |
$5,681.97 |
| 29 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,084 | SY |
$4.25 |
$3.26 |
$4.50 |
$4.59 |
| 30 | 619(C) 0924 |
SAWING PAVEMENT | 900 | LF |
$5.00 |
$4.21 |
$4.50 |
$2.78 |
| 31 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 180 | SF |
$13.00 |
$11.68 |
$15.00 |
$15.51 |
| 32 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 120 | LF |
$7.50 |
$21.24 |
$10.00 |
$10.34 |
| 33 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 144,099 | LF |
$0.5000 |
$0.6900 |
$0.3300 |
$0.3600 |
| 34 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 74 | EA |
$100.00 |
$90.29 |
$114.00 |
$117.86 |
| 35 | 856(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 71,600 | LF |
$0.5000 |
$0.5300 |
$0.7000 |
$0.7200 |
| 36 | 856(G) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 14,320 | EA |
$0.5000 |
$0.5300 |
$0.5000 |
$0.5200 |
| 37 | 880(A) 8815 |
ARROW DISPLAY(TYPE C) | 2 | EA |
$5,000.00 |
$4,248.72 |
$3,000.00 |
$3,101.68 |
| 38 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,780 | SD |
$0.5000 |
$0.2700 |
$0.2500 |
$0.2600 |
| 39 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,920 | SD |
$0.6000 |
$2.12 |
$0.7500 |
$0.7800 |
| 40 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,595 | SD |
$1.60 |
$2.12 |
$1.50 |
$1.55 |
| 41 | 880(C) 8842 |
BARRICADES(TYPE III) | 2,205 | SD |
$1.15 |
$2.12 |
$1.00 |
$1.03 |
| 42 | 880(C) 8848 |
WING BARRICADES | 1,960 | SD |
$0.3500 |
$0.2700 |
$1.00 |
$1.03 |
| 43 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,410 | SD |
$0.2000 |
$0.5300 |
$0.2000 |
$0.2100 |
| 44 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 45,325 | SD |
$0.0500 |
$0.1600 |
$0.0800 |
$0.0800 |
| 45 | 880(F) 8878 |
DRUMS | 45,325 | SD |
$0.2000 |
$0.1600 |
$0.2000 |
$0.2100 |
| 46 | 880(G) 8890 |
CHANNELIZER CONES | 45,325 | SD |
$0.1500 |
$0.1600 |
$0.1500 |
$0.1600 |
| 47 | 882(A) 8303 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$20,000.00 |
$16,145.14 |
$15,000.00 |
$15,508.38 |
| 48 | 642 0098 |
STAKING | 1 | LSUM |
$25,000.00 |
$95,000.00 |
$31,450.00 |
$39,942.03 |
| 49 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$3,500.00 |
$6,000.00 |
$8,907.10 |
| 50 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$510,000.00 |
$200,000.00 |
$320,000.00 |
$345,000.00 |
| 51 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$42,500.00 |
$40,000.00 |
$60,000.00 |
$35,000.00 |