IDOT Jobs

All dates · 4,218 jobs · $20,005,846,000
★ My Jobs

4,218 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
— 4-00129-0104 4001290104 District 4 US-34 Maintenance - Pavements Ramp Repair, Shoulder Reconstruction, Underdrains Intchgs at US 150 (Henderson St) & Seminary St In Galesburg $4,000,000 Planned Nov 25 New
— 4-00132-0200 4001320200 District 4 IL-9 Rehabilitation - Pavement Designed Overlay Prairie Creek to McLean Co Line $15,000,000 Planned Nov 25 New
— 4-00151-0300 4001510300 District 4 IL-18 Reconstruction - Bridges Bridge Replacement Illinois River Bridge at Henry $108,000,000 Planned Nov 25 New
— 4-00151-0305 4001510305 District 4 IL-18 Reconstruction - Bridges Utility Adjustment Illinois River Bridge at Henry $1,000,000 Planned Nov 25 New
— 4-00158-0300 4001580300 District 4 IL-135 Reconstruction - Bridges Bridge Replacement David's Creek 0.5 Mi S of Little York $1,200,000 Planned Nov 25 New
— 4-00170-0300 4001700300 District 4 IL-8 Reconstruction - Bridges Bridge Replacement At Kickapoo Creek Trib 1.5 Mi E of Edwards $2,000,000 Planned Nov 25 New
— 4-00177-0000 4001770000 District 4 IL-9 Reconstruction - Bridges Bridge Replacement Spoon River 1 Mi S of Blyton $19,800,000 Planned Nov 25 New
— 4-00222-0000 4002220000 District 4 IL-116IL-117 Rehabilitation - Pavement Designed Overlay N 7th St in Roanoke to ILL 116 (E) $7,500,000 Planned Nov 25 New
— 4-00222-0200 4002220200 District 4 IL-117US-150 Rehabilitation - Pavement Designed Overlay US 150: I-74 to ILL 117; ILL 117: N of Raymond St to US 150 $5,000,000 Planned Nov 25 New
— 4-00222-0600 4002220600 District 4 US-24 Rehabilitation - Pavement Designed Overlay CH 7 to CR 2600E at El Paso WCL $7,200,000 Planned Nov 25 New
— 4-00222-0800 4002220800 District 4 IL-251 Rehabilitation - Pavement Designed Overlay ILL 116 (W) to El Paso NCL $6,000,000 Planned Nov 25 New
— 4-00222-1000 4002221000 District 4 IL-251US-24 Rehabilitation - Pavement Designed Overlay, ADA Improvements US 24: CR 2600E to McLean Co Line; ILL 251: NCL to SCL of El Paso $15,000,000 Planned Nov 25 New
— 4-00222-1400 4002221400 District 4 US-24 Rehabilitation - Pavement Designed Overlay, ADA Improvements 0.3 mi E of US 24 BUS to Eureka ECL $15,000,000 Planned Nov 25 New
— 4-00328-0200 4003280200 District 4 IL-9 Reconstruction - Bridges Bridge Replacement Lost Grove Creek 4 mi W of Fiatt $3,500,000 Planned Nov 25 New
— 4-00331-0100 4003310100 District 4 IL-122 Reconstruction - Bridges Bridge Replacement over IC RR Spur in Delavan $4,000,000 Planned Nov 25 New
— 4-00332-0000 4003320000 District 4 US-150 Reconstruction - Bridges Bridge Replacement At Spoon River 0.7 mi e of CH 11 $13,300,000 Planned Nov 25 New
— 4-00332-0400 4003320400 District 4 IL-6 Rehabilitation - Bridges Bridge Superstructure Replace Over Charter Oak Rd in Peoria $3,000,000 Planned Nov 25 New
— 4-00485-0100 4004850100 District 4 CH-2Sherrard Rd Rehabilitation - Pavement Designed Overlay, Cold In-Place Recycling US 67 to 5th Ave in Sherrard $4,200,000 Planned Nov 25 New
— 4-00495-0800 4004950800 District 4 IL-110US-34US-67 Safety Intersection Improvement At Main St in Monmouth $1,500,000 Planned Nov 25 New
— 4-00551-0500 4005510500 District 4 IL-41 Rehabilitation - Pavement Designed Overlay ILL 116 to Avon SCL $23,000,000 Planned Nov 25 New
— 4-01024-0100 4010240100 District 4 IL-94Old Us 34 Reconstruction - Bridges Bridge Replacement Old US 34: at Old Tom Creek 0.6 Mi E of Church St; ILL 94: at Honey Creek 1.3 Mi N of CR 400N & at Henderson Overflow 0.3 Mi S of TR 29 $5,280,000 Planned Nov 25 New
— 4-01024-0200 4010240200 District 4 IL-17IL-29IL-40 Reconstruction - Bridges Bridge Replacement ILL 29: at Trib Illinois River 0.6 Mi S of Hopewell Dr; ILL 40: at Camp Creek 0.1 Mi N of ILL 17(E); TR 101A: at W Branch Panther Creek W of ILL 116/117 $2,220,000 Planned Nov 25 New
— 4-01081-0000 4010810000 District 4 1500n Reconstruction - Bridges Bridge Replacement S Henderson Creek 0.3 Mi E of ILL 94 $5,000,000 Planned Nov 25 New
— 4-02024-2700 4020242700 District 4 IL-29 Preservation - Pavements Crack & Joint Sealing Senachwine Creek to N of Truitt Ave in Chillicothe $75,000 Planned Nov 25 New
— 4-02024-2701 4020242701 District 4 IL-17IL-180 Rehabilitation - Pavement Standard Overlay 6th St in Galva to 0.1 mi S of ILL 17(E) $4,500,000 Planned Nov 25 New
— 4-02024-2707 4020242707 District 4 IL-116US-150US-24 Preservation - Pavements Crack & Joint Sealing N of I-74 to S of Highview Rd $110,000 Planned Nov 25 New
— 4-02024-2708 4020242708 District 4 I-74 Preservation - Pavements Crack & Joint Sealing W of Kickapoo / Edwards Rd to 0.7 mi E of I-474 $300,000 Planned Nov 25 New
— 4-02024-2709 4020242709 District 4 IL-100US-24 Preservation - Pavements Crack & Joint Sealing Ave F in Lewistown to N of Rut Rd $110,000 Planned Nov 25 New
— 4-02024-2710 4020242710 District 4 IL-116 Preservation - Pavements Crack & Joint Sealing TR 154 (115th St) to Knox Co Line $160,000 Planned Nov 25 New
— 4-02024-2711 4020242711 District 4 I-39US-51 Preservation - Pavements Crack & Joint Sealing 3.1 Mi S to 1 Mi N of ILL 116 $300,000 Planned Nov 25 New
— 4-02024-2712 4020242712 District 4 I-39US-51 Preservation - Pavements Crack & Joint Sealing 0.2 mi N of US 24 to 3.1 mi S of ILL 116 $230,000 Planned Nov 25 New
— 4-02024-2802 4020242802 District 4 IL-26 Preservation - Pavements Smart Overlay Spring Bay NCL to ILL 116 $3,460,000 Planned Nov 25 New
— 4-02024-2804 4020242804 District 4 Keithsburg Rd Preservation - Pavements Smart Overlay ILL 17 to Main St in Keithsburg $2,980,000 Planned Nov 25 New
— 4-02024-2903 4020242903 District 4 US-67 Preservation - Pavements Smart Overlay Ridge Rd to Viola NCL $2,295,000 Planned Nov 25 New
— 4-02025-2601 4020252601 District 4 IL-110US-34 Preservation - Pavements Microsurfacing 1 Pass 0.3 mi W of Cameron Rd to 0.5 mi E of W Main St in Galesburg $1,500,000 Planned Nov 25 New
— 4-02205-0150 4022050150 District 4 Main StUS-67 Rehabilitation - Pavement Designed Overlay US 136 (E) to Grindstone Creek At Industry NCL $36,500,000 Planned Nov 25 New
— 4-02205-0152 4022050152 District 4 Main StUS-67 Rehabilitation - Pavement Utility Adjustment US 136 (E) to Grindstone Creek At Industry NCL $1,000,000 Planned Nov 25 New
— 4-02919-0100 4029190100 District 4 US-24 Rehabilitation - Bridges Bridge New Deck Duck Creek 5.5 Mi SW of Banner $2,000,000 Planned Nov 25 New
— 4-02922-0000 4029220000 District 4 IL-100IL-78US-136 Rehabilitation - Pavement Designed Overlay US 24 to Illinois River $5,600,000 Planned Nov 25 New
— 4-02922-0200 4029220200 District 4 IL-9 Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement Ave F to Ave A in Canton $9,000,000 Planned Nov 25 New
— 4-02922-0300 4029220300 District 4 IL-78 Rehabilitation - Pavement Designed Overlay Big Creek Park to ILL 9 (Locust St) in Canton $5,000,000 Planned Nov 25 New
— 4-02924-0000 4029240000 District 4 IL-78IL-9 Rehabilitation - Pavement Designed Overlay E of 1st Ave to 5th Ave in Canton $800,000 Planned Nov 25 New
— 4-02925-0000 4029250000 District 4 US-24 Rehabilitation - Pavement Designed Overlay Hendrick Rd to Astoria WCL & Astoria ECL to 0.2 mi W of Bucher Rd $10,000,000 Planned Nov 25 New
— 4-02925-0100 4029250100 District 4 IL-116 Rehabilitation - Pavement Designed Overlay, ADA Improvements Farmington WCL to JCT ILL 78 (S) $4,000,000 Planned Nov 25 New
— 4-02926-0000 4029260000 District 4 IL-78 Rehabilitation - Pavement Standard Overlay ILL 78: N of Alder St to S of Big Creek Park in Canton; Old ILL 78: ILL 78 (N) to ILL 78 (S) in Canton $3,750,000 Planned Nov 25 New
— 4-03024-2540 4030242540 District 4 IL-91 Preservation - Bridges Bridge Repair, Bridge Deck Overlay At North Creek, Prince Run Trib, Mud Run Creek & Camp Run Creek $1,900,000 Planned Nov 25 New
— 4-03024-2550 4030242550 District 4 IL-26 Preservation - Bridges Bridge Deck Overlay Crow Creek Overflow, Crow Creek, Strawn Creek, Strawn Run Creek & Pigeon Creek $2,600,000 Planned Nov 25 New
— 4-03024-2560 4030242560 District 4 IL-29IL-98 Preservation - Bridges Bridge Repair, Bridge Deck Overlay ILL 98 at Lick Creek & Lick Creek Trib; ILL 29 at Little Lick Creek $1,900,000 Planned Nov 25 New
— 4-03050-0100 4030500100 District 4 IL-41IL-9 Rehabilitation - Pavement Designed Overlay, Curb And Gutter, Storm Sewer (New) NCL to SCL of Bushnell $5,200,000 Planned Nov 25 New
— 4-03622-0000 4036220000 District 4 IL-94 Rehabilitation - Pavement Designed Overlay Henderson Creek Overflow to Old US 34 in Biggsville $15,000,000 Planned Nov 25 New
— 4-03622-0600 4036220600 District 4 IL-94 Rehabilitation - Pavement Designed Overlay 1500E to Hancock Co Line $8,000,000 Planned Nov 25 New
— 4-03622-0800 4036220800 District 4 IL-94 Rehabilitation - Pavement Designed Overlay JCT ILL 135 (S) to Henderson Creek Overflow $10,400,000 Planned Nov 25 New
— 4-03623-0000 4036230000 District 4 US-34 Initial Construction - Pa New Construction 0.9 Mi W of Carman Rd to 1350 E Rd (TR 111) $155,000,000 Planned Nov 25 New
— 4-03623-0050 4036230050 District 4 US-34 Initial Construction - Pa Utility Adjustment 0.9 Mi W of Carman Rd to 1350 E Rd (TR 111) $500,000 Planned Nov 25 New
— 4-04250-0150 4042500150 District 4 IL-17 Rehabilitation - Pavement Standard Overlay US 67 in Viola to US 150 $8,700,000 Planned Nov 25 New
— 4-04510-0100 4045100100 District 4 IL-9US-24 Initial Construction - Pa Additional Lanes Banner to E of Romine Rd $49,000,000 Planned Nov 25 New
— 4-04510-0102 4045100102 District 4 IL-9US-24 Initial Construction - Pa Utility Adjustment Banner to E of Romine Rd $700,000 Planned Nov 25 New
— 4-04510-0150 4045100150 District 4 IL-9US-24 Miscellaneous Improvement Bridge Replacement Banner to E of Romine Rd (Various Structures) $5,600,000 Planned Nov 25 New
— 4-04510-0203 4045100203 District 4 IL-9US-24 Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines $700,000 Planned Nov 25 New
— 4-04510-0400 4045100400 District 4 IL-9US-24 Initial Construction - Pa Additional Lanes E of Romine Rd to Kingston Mines $62,000,000 Planned Nov 25 New
— 4-04510-0403 4045100403 District 4 IL-9US-24 Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines $600,000 Planned Nov 25 New
— 4-04510-0450 4045100450 District 4 IL-9US-24 Reconstruction - Bridges Bridge Replacement 0.4 Mi E of Trivoli Rd & 0.1 Mi E of Glasford Rd $2,150,000 Planned Nov 25 New
— 4-04817-0200 4048170200 District 4 US-34 Rehabilitation - Pavement Designed Overlay Knox Rd 900E to Oneida ECL $5,750,000 Planned Nov 25 New
— 4-04817-1500 4048171500 District 4 IL-41 Rehabilitation - Bridges Bridge New Deck, Bridge Superstructure Rehab Over BSNF RR 0.5 mi N of St. Augustine $3,300,000 Planned Nov 25 New
— 4-04819-0000 4048190000 District 4 US-150 Reconstruction - Pavement Reconstruction Main St: Allens Ave to Grand Ave & Grand Ave: Main St to CH 32 in Galesburg $30,000,000 Planned Nov 25 New
— 4-04819-0100 4048190100 District 4 IL-110US-34 Reconstruction - Bridges Bridge Replacement Lincoln Park Dr & Farnham St in Galesburg $12,500,000 Planned Nov 25 New
— 4-04819-0600 4048190600 District 4 IL-97 Rehabilitation - Pavement Designed Overlay S of Littlers Creek to ILL 116 $12,600,000 Planned Nov 25 New
— 4-04819-0650 4048190650 District 4 IL-97 Rehabilitation - Pavement Utility Adjustment S of Littlers Creek to ILL 116 $500,000 Planned Nov 25 New
— 4-04819-0700 4048190700 District 4 IL-110US-34 Reconstruction - Bridges Bridge Replacement Seminary St in Galesburg $12,650,000 Planned Nov 25 New
— 4-04822-0400 4048220400 District 4 IL-8 Rehabilitation - Pavement Designed Overlay ILL 97 to ILL 78 (S) $9,500,000 Planned Nov 25 New
— 4-04823-0100 4048230100 District 4 IL-116 Rehabilitation - Bridges Bridge New Deck, Bridge Repair Cedar Creek 0.1 mi e of Warren Co line 2 mi w of ILL 41 $3,800,000 Planned Nov 25 New
— 4-04824-0100 4048240100 District 4 CH-17 Rehabilitation - Bridges Bridge New Deck, Bridge Painting, Bridge Superstructure Rehab At Spoon River 0.5 Mi E of 1700E Rd $2,000,000 Planned Nov 25 New
— 4-04825-0200 4048250200 District 4 US-34 Rehabilitation - Pavement Designed Overlay Oneida ECL to JCT ILL 17 (W) $10,500,000 Planned Nov 25 New
— 4-04825-0400 4048250400 District 4 IL-110US-34 Reconstruction - Pavement Reconstruction 0.4 Mi W to 1.2 Mi E of I-74 $35,000,000 Planned Nov 25 New
— 4-05517-0100 4055170100 District 4 US-67 Reconstruction - Bridges Bridge Replacement Troublesome Creek 1.7 mi S of US 136 & Camp Creek 5.5 mi S of US 136 $7,000,000 Planned Nov 25 New
— 4-05517-0600 4055170600 District 4 IL-41US-136 Rehabilitation - Pavement Designed Overlay Bushnell SCL to N of TR 199 $9,000,000 Planned Nov 25 New
— 4-06217-0200 4062170200 District 4 IL-17IL-251 Rehabilitation - Pavement Designed Overlay, ADA Improvements ILL 251: Wenona NCL to ILL 17 (W); Westmont St: ILL 251 to S of CR 800N $12,000,000 Planned Nov 25 New
— 4-06217-0500 4062170500 District 4 IL-17IL-40 Rehabilitation - Bridges Bridge New Deck, Bridge Painting, Bridge Repair Over UP RR at Camp Grove $3,200,000 Planned Nov 25 New
— 4-06220-0000 4062200000 District 4 IL-117 Rehabilitation - Pavement Designed Overlay N of LaRose Rd to ILL 116(E) $11,119,000 Planned Nov 25 New
— 4-06220-0200 4062200200 District 4 IL-17 Rehabilitation - Pavement Designed Overlay, Drainage, ADA Improvements Illinois River to Lacon ECL $8,300,000 Planned Nov 25 New
— 4-06222-0000 4062220000 District 4 IL-17 Rehabilitation - Pavement Designed Overlay ILL 40 to Illinois River $12,500,000 Planned Nov 25 New
— 4-06222-0600 4062220600 District 4 IL-26 Rehabilitation - Pavement Designed Overlay, ADA Improvements NCL to SCL of Lacon $10,000,000 Planned Nov 25 New
— 4-06622-0000 4066220000 District 4 IL-17IL-94 Rehabilitation - Pavement Standard Overlay 11th Ave to E of ILL 94 (N) in Aledo $3,500,000 Planned Nov 25 New
— 4-07010-0300 4070100300 District 4 (eastbound)I-74 Rehabilitation - Pavement Standard Overlay, Resurfacing (Int-3rd) E of ILL 97 to Spoon River $13,000,000 Planned Nov 25 New
— 4-07217-0500 4072170500 District 4 IL-78 Reconstruction - Bridges Bridge Replacement Spoon River 3 mi N of Laura $11,400,000 Planned Nov 25 New
— 4-07217-0600 4072170600 District 4 IL-8 Rehabilitation - Pavement Designed Overlay ILL 78 to Texas Rd $8,700,000 Planned Nov 25 New
— 4-07217-2700 4072172700 District 4 IL-6 Rehabilitation - Bridges Bridge New Deck, Bridge Repair At ILL 40 $10,000,000 Planned Nov 25 New
— 4-07217-3100 4072173100 District 4 US-150 Rehabilitation - Bridges Bridge Substructure Rehab over UP RR 1.3 mi E of ILL 6 $1,080,000 Planned Nov 25 New
— 4-07218-0300 4072180300 District 4 IL-6 Rehabilitation - Bridges Bridge New Deck, Bridge Rehabilitation 0.3 Mi E of ILL 91 in Peoria $7,000,000 Planned Nov 25 New
— 4-07219-0700 4072190700 District 4 IL-9US-24 Reconstruction - Bridges Bridge New Deck KJRY RR 1 Mi E of Mapleton $15,000,000 Planned Nov 25 New
— 4-07219-0800 4072190800 District 4 IL-29IL-6 Rehabilitation - Pavement Designed Overlay 0.2 mi N of ILL 6 to 0.2 mi N of Gardner Ln in Peoria $14,500,000 Planned Nov 25 New
— 4-07219-1600 4072191600 District 4 US-150 Reconstruction - Pavement Reconstruction 0.1 Mi W of Frostwood Pkwy to 0.1 Mi W of Int Sterling Ave / Glen Ave in Peoria $45,000,000 Planned Nov 25 New
— 4-07219-1650 4072191650 District 4 US-150 Rehabilitation - Pavement Utility Adjustment 0.2 mi W of Orange Prairie Rd to 0.1 mi W of Int Sterling Ave / Glen Ave in Peoria $700,000 Planned Nov 25 New
— 4-07219-1900 4072191900 District 4 US-150 Rehabilitation - Pavement Designed Overlay, Shoulder Reconstruction, Curb And Gutter 0.2 Mi W of Orange Prairie Rd to 0.1 Mi W of Int Frostwood Pkwy $15,000,000 Planned Nov 25 New
— 4-07220-0200 4072200200 District 4 IL-116IL-116 BIL-8 Reconstruction - Pavement Reconstruction Washington St to Griswold St in Peoria $36,400,000 Planned Nov 25 New
— 4-07220-0250 4072200250 District 4 IL-116IL-116 BIL-8 Reconstruction - Pavement Utility Adjustment Washington St to Griswold St in Peoria $500,000 Planned Nov 25 New
— 4-07220-0600 4072200600 District 4 Dr M L King Jr Dr Rehabilitation - Pavement Designed Overlay, ADA Improvements ILL 116 (Harmon Hwy) to Western Ave in West Peoria $3,373,000 Planned Nov 25 New
— 4-07220-2000 4072202000 District 4 Farmington RdIL-8 Rehabilitation - Pavement Designed Overlay, Widening & Resurfacing, Bikeway E of Kickapoo Creek in West Peoria to N of Main St in Peoria $25,000,000 Planned Nov 25 New
— 4-07222-0800 4072220800 District 4 US-150 Rehabilitation - Pavement Designed Overlay, ADA Improvements E of Prospect Rd to W of Adams St in Peoria $3,500,000 Planned Nov 25 New
— 4-07222-1200 4072221200 District 4 IL-40 Rehabilitation - Pavement Designed Overlay, ADA Improvements N of Pioneer Pkwy to S of Prospect Rd in Peoria $8,000,000 Planned Nov 25 New
2,801–2,900 of 4,218‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.