IDOT Jobs

All dates · 4,218 jobs · $20,005,846,000
★ My Jobs

4,218 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
— 1-79925-0000 1799250000 District 1 55th St Rehabilitation - Pavement Standard Overlay, ADA Improvements East Ave to Joliet Rd $711,000 Planned Nov 25 New
— 1-79944-0000 1799440000 District 1 26th St Rehabilitation - Pavement Standard Overlay, ADA Improvements Des Plaines Ave to 49th Ave $6,250,000 Planned Nov 25 New
— 1-79967-2000 1799672000 District 1 Jefferson StUS-52 Rehabilitation - Bridges Culvert Extension River Rd to Houbolt Rd $30,400,000 Planned Nov 25 New
— 1-79967-2001 1799672001 District 1 Jefferson StUS-52 Initial Construction - Pa Additional Lanes River Rd to Houbolt Rd $45,600,000 Planned Nov 25 New
— 1-79967-2600 1799672600 District 1 Jefferson StUS-52 Initial Construction - Pa Utility Adjustment River Rd to Houbolt Rd $4,000,000 Planned Nov 25 New
— 1-79967-2800 1799672800 District 1 Jefferson StUS-52 Rehabilitation - Bridges Miscellaneous River Rd to Houbolt Rd $500,000 Planned Nov 25 New
— 1-79976-0000 1799760000 District 1 Washington Blvd Reconstruction - Bridges Bridge Replacement Ill 171 (First Ave) to Thatcher Ave $5,000,000 Planned Nov 25 New
— 1-79987-0000 1799870000 District 1 Devon Ave Reconstruction - Bridges Bridge Replacement at Des Plaines River $3,000,000 Planned Nov 25 New
— 1-79992-1000 1799921000 District 1 Highland Ave Maintenance - Bridges Bridge Repair Under Ill 56 $5,000,000 Planned Nov 25 New
— 1-79998-0000 1799980000 District 1 Bishop Ford ExpwyI-94 Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay W of Martin Luther King Dr to Little Calumet River $85,000,000 Planned Nov 25 New
— 1-80004-0000 1800040000 District 1 Ida B Wells Dr Rehabilitation - Bridges Bridge New Deck, Bridge Superstructure Replace at Old Post Office & at S Branch Chicago River $23,100,000 Planned Nov 25 New
— 1-80009-0000 1800090000 District 1 Eisenhower ExpwyI-290 Reconstruction - Bridges Bridge Replacement at Independence Blvd (Overhead) $40,000,000 Planned Nov 25 New
— 1-80013-0000 1800130000 District 1 US-20 Safety Intersection Reconstn, Traf Signal Replacement at Big Timber Rd $5,540,000 Planned Nov 25 New
— 1-80085-0000 1800850000 District 1 Greenwood Rd Rehabilitation - Pavement Standard Overlay, ADA Improvements Linneman St to Ill 58 (Golf Rd) $1,200,000 Planned Nov 25 New
— 1-80098-0000 1800980000 District 1 Golf RdIL-58 Rehabilitation - Pavement Standard Overlay, ADA Improvements Ill 59 (Sutton Rd) to Windsong Dr $2,300,000 Planned Nov 25 New
— 1-80130-0000 1801300000 District 1 Batavia AveIL-31 Maintenance - Pavements Drainage, ADA Improvements S of Fargo Blvd $500,000 Planned Nov 25 New
— 1-80145-0000 1801450000 District 1 115th St Rehabilitation - Pavement Standard Overlay, ADA Improvements Springfield Ave to Western Ave $3,000,000 Planned Nov 25 New
— 1-80146-0000 1801460000 District 1 119th St Rehabilitation - Pavement Standard Overlay, New Shoulders, Drainage US 45 (LaGrange Rd) to Cal Sag Rd $2,100,000 Planned Nov 25 New
— 1-80183-0000 1801830000 District 1 IL-31 Rehabilitation - Pavement Standard Overlay, ADA Improvements S of Wildrose Spring Rd to S of Third St $2,500,000 Planned Nov 25 New
— 1-80188-0000 1801880000 District 1 IL-72Oak Knoll Dr Rehabilitation - Pavement Designed Overlay, Milled Rumble Strip, New Shoulders DeKalb Co Line to Aurora Dr $2,500,000 Planned Nov 25 New
— 1-80197-0000 1801970000 District 1 (eastbound)I-80 Reconstruction - Bridges Bridge Replacement At I-294 (Tri-State Tollway) (NB) $52,000,000 Planned Nov 25 New
— 1-80237-0000 1802370000 District 1 IL-176 Miscellaneous Improvement Left Turn Lanes At Buhl Rd & At Bay View Beach Rd $2,500,000 Planned Nov 25 New
— 1-80242-0000 1802420000 District 1 US-14 Safety Intersection Reconstn At Hartland Rd / Hughes Rd $5,000,000 Planned Nov 25 New
— 1-80247-0000 1802470000 District 1 IL-64North Ave Safety Channelization, Widening Existing Pavement Renaux Blvd to Bonnie Dr & At Brown Rd $4,900,000 Planned Nov 25 New
— 1-80267-0000 1802670000 District 1 IL-176Liberty St Reconstruction - Bridges Culvert Replacement At Bangs Lake Outlet $1,000,000 Planned Nov 25 New
— 1-80288-0000 1802880000 District 1 Palatine Rd Reconstruction - Bridges Culvert Replacement E of Williams Dr to E of Salt Creek & At Salt Creek 0.2 Mi W of Winston Dr W of Ill 53 $1,700,000 Planned Nov 25 New
— 1-80293-0000 1802930000 District 1 I-90I-94Kennedy Expwy Reconstruction - Bridges Bridge Replacement At Fulton St (Overhead) $20,000,000 Planned Nov 25 New
— 1-80294-0000 1802940000 District 1 Forest Way Dr Reconstruction - Bridges Culvert Replacement At Ditch N of Willow Rd $1,200,000 Planned Nov 25 New
— 1-80319-0000 1803190000 District 1 IL-53Independence Blvd Safety Intersection Improvement At Normantown Rd / Devonwood Ave $2,545,000 Planned Nov 25 New
— 1-80322-0000 1803220000 District 1 Oakton St Miscellaneous Improvement Traf Signal Modernization, Turning Lanes, Pavement Marking At Busse Hwy, Dee Rd & Northwest Hwy $3,000,000 Planned Nov 25 New
— 1-80323-0000 1803230000 District 1 Morgan StPark Ave Miscellaneous Improvement Standard Overlay, Traf Signal Modernization, Pavement Marking 1) Morgan St/Park Ave - 149th St to 167th St, 2) Ill 1 at 144th St $4,060,000 Planned Nov 25 New
— 1-80327-0000 1803270000 District 1 Harlem AveIL-43 Reconstruction - Pavement Bridge Repair 46th/47th St to 53rd St $8,000,000 Planned Nov 25 New
— 1-80344-0000 1803440000 District 1 Various Safety Milled Rumble Strip Various Locations $210,000 Planned Nov 25 New
— 1-80348-0000 1803480000 District 1 Ogden Ave Miscellaneous Improvement Turning Lanes, Channelization, Traf Signal Modernization At Oak Park Ave, East Ave & Ridgeland Ave $2,210,000 Planned Nov 25 New
— 1-80361-0000 1803610000 District 1 Belvidere StIL-120 Reconstruction - Bridges Culvert Replacement, Intersection Improvement at Ditch 0.4 mi W of ILL 131 and At Knight/Ruth Wilcox Ave $500,000 Planned Nov 25 New
— 1-80370-0000 1803700000 District 1 Front StIL-53 Rehabilitation - Pavement Designed Overlay, ADA Improvements, New Shoulders Water Street to Grundy Co Line $5,500,000 Planned Nov 25 New
— 1-80376-0000 1803760000 District 1 IL-31 Safety Intersection Reconstn, Drainage at Ringwood Rd $4,000,000 Planned Nov 25 New
— 1-80439-0000 1804390000 District 1 Washington Blvd Rehabilitation - Pavement Standard Overlay Ill 43 (Harlem Ave) to Austin Blvd $1,900,000 Planned Nov 25 New
— 1-80440-0000 1804400000 District 1 Central Ave Rehabilitation - Pavement Designed Overlay, ADA Improvements 53rd St to 63rd St $1,012,000 Planned Nov 25 New
— 1-80441-0000 1804410000 District 1 Dundee Rd Rehabilitation - Pavement Standard Overlay, ADA Improvements I-94 (Edens Expwy) to Forest Way Dr $800,000 Planned Nov 25 New
— 1-80453-0000 1804530000 District 1 Touhy Ave Miscellaneous Improvement Traf Signal Installation, ADA Improvements At Chestnut St $500,000 Planned Nov 25 New
— 1-80552-0000 1805520000 District 1 I-57 Initial Construction - Pa Interchange (New) at Eagle Lake Rd $150,000,000 Planned Nov 25 New
— 1-80552-0400 1805520400 District 1 I-57 Initial Construction - Pa Utility Adjustment at Eagle Lake Rd $2,000,000 Planned Nov 25 New
— 1-80552-0500 1805520500 District 1 I-57 Initial Construction - Pa RR Crossing Construction at Eagle Lake Rd $2,000,000 Planned Nov 25 New
— 1-80553-0000 1805530000 District 1 Half Day RdIL-22 Safety Intersection Improvement, ADA Improvements At ILL 83 $5,000,000 Planned Nov 25 New
— 1-80558-0000 1805580000 District 1 Belvidere RdIL-120 Initial Construction - Pa Additional Lanes Ashford Ln to US 45 $13,410,000 Planned Nov 25 New
— 1-80558-0010 1805580010 District 1 Belvidere RdIL-120 Reconstruction - Pavement Reconstruction, ADA Improvements Ashford Ln to US 45 $8,940,000 Planned Nov 25 New
— 1-80558-0400 1805580400 District 1 Belvidere RdIL-120 Initial Construction - Pa Utility Adjustment Ashford Ln to US 45 $500,000 Planned Nov 25 New
— 1-80567-0000 1805670000 District 1 Montrose Ave Rehabilitation - Pavement Standard Overlay Central Ave to Elston Ave $2,250,000 Planned Nov 25 New
— 1-80578-0000 1805780000 District 1 Ridge Blvd Miscellaneous Improvement Miscellaneous Howard St to S of Pratt Blvd (Pedestrian Improvements) $2,000,000 Planned Nov 25 New
— 1-80590-0000 1805900000 District 1 25th Ave Reconstruction - Bridges Bridge Replacement at Salt Creek 0.3 Mi S of Cermak Rd $5,500,000 Planned Nov 25 New
— 1-80592-0000 1805920000 District 1 Eisenhower ExpwyI-290 Reconstruction - Bridges Bridge Replacement at Ogden Ave (Overhead) $17,740,000 Planned Nov 25 New
— 1-80592-1000 1805921000 District 1 Ogden Ave Safety Intersection Improvement, Traf Signal Modernization, Traf Signal Installation Over I-290 (Eisenhower Expwy) $26,301,000 Planned Nov 25 New
— 1-80608-0000 1806080000 District 1 US-30 Preservation - Pavements Standard Overlay Harvey Rd to 143rd St $9,250,000 Planned Nov 25 New
— 1-80652-0000 1806520000 District 1 E Butterfield Frtg Rehabilitation - Pavement Designed Overlay DEAD END TO FAIRFIELD AVE $146,000 Planned Nov 25 New
— 1-80791-0000 1807910000 District 1 Cicero AveIL-50IL-83 Reconstruction - Bridges Bridge Replacement At Cal Sag Channel $20,000,000 Planned Nov 25 New
— 1-80798-0000 1807980000 District 1 Dixie HwyIL-1 Safety Intersection Reconstn At County Line Rd $7,000,000 Planned Nov 25 New
— 1-80803-0000 1808030000 District 1 Governors HwyIL-50 Miscellaneous Improvement Traf Signal Installation, Safety Improvements, Pavement Marking Wilmington-Peotone Rd to County Line Rd $2,500,000 Planned Nov 25 New
— 1-80814-0000 1808140000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement At Western Ave (Overhead) $30,300,000 Planned Nov 25 New
— 1-80818-0000 1808180000 District 1 Eisenhower ExpwyI-290IL-110 Rehabilitation - Bridges Bridge Substructure Rehab, Bridge Superstructure Rehab At Pulaski Rd (Overhead) $8,930,000 Planned Nov 25 New
— 1-80821-0000 1808210000 District 1 Eisenhower ExpwyI-290IL-110 Rehabilitation - Bridges Bridge Substructure Rehab, Bridge Superstructure Rehab At Kostner Ave (Overhead) $8,610,000 Planned Nov 25 New
— 1-80832-0000 1808320000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement At Circle Ave $94,000,000 Planned Nov 25 New
— 1-80833-0000 1808330000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement At Des Plaines Ave $9,300,000 Planned Nov 25 New
— 1-80834-0000 1808340000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement At Des Plaines River $32,000,000 Planned Nov 25 New
— 1-80835-0000 1808350000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Pavement Interchange Reconstruction At Ill 171 (1st Ave) & at 5th Ave $150,000,000 Planned Nov 25 New
— 1-80835-0001 1808350001 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Pavement Bridge Rehabilitation At Ill 171 (1st Ave) & at 5th Ave $37,000,000 Planned Nov 25 New
— 1-80835-1000 1808351000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Pavement Water Main, Storm Sewer (New) 22nd St to Des Plaines River $15,000,000 Planned Nov 25 New
— 1-80837-0000 1808370000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement At 9th Ave (Overhead) $9,550,000 Planned Nov 25 New
— 1-80838-0000 1808380000 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement At 17th Ave (Overhead) $9,680,000 Planned Nov 25 New
— 1-80846-0000 1808460000 District 1 Troy RdUS-52 Safety Intersection Reconstn At County Line Rd $7,000,000 Planned Nov 25 New
— 1-80847-0000 1808470000 District 1 IL-47Main St Preservation - Pavements Ultra-Thin Bnd Wr Course Ware Rd to Ill 173 $2,500,000 Planned Nov 25 New
— 1-80872-0000 1808720000 District 1 IL-60IL-83 Preservation - Pavements Smart Overlay NW of Diamond Lake Rd to Des Plaines River Rd $5,850,000 Planned Nov 25 New
— 1-80876-0000 1808760000 District 1 Antioch RdIL-137 Preservation - Pavements Smart Overlay US 45 (Lake St) to E of Ill 21 (Milwaukee Ave) $2,221,000 Planned Nov 25 New
— 1-80877-0000 1808770000 District 1 Grand AveIL-132 Preservation - Pavements Smart Overlay Central Ave to W of Sheehan Dr $760,000 Planned Nov 25 New
— 1-80880-0000 1808800000 District 1 IL-21Milwaukee AveUS-45 Preservation - Pavements Smart Overlay Church St to Chevy Chase Dr $16,600,000 Planned Nov 25 New
— 1-80887-0000 1808870000 District 1 Lake StUS-20 Preservation - Pavements Smart Overlay, Standard Overlay Ramp to I-390 (Elgin-O'Hare Expwy) to E of Greenbrook Blvd & W of Arlington Dr/Bartels Rd to E of Springfield Dr $4,400,000 Planned Nov 25 New
— 1-80890-0000 1808900000 District 1 Eisenhower ExpwyI-290US-20 Maintenance - Bridges Bridge Repair, Bridge Joint Replace/Repair Addison Rd to I-88 $3,000,000 Planned Nov 25 New
— 1-80890-0010 1808900010 District 1 Eisenhower ExpwyI-290US-20 Rehabilitation - Pavement Standard Overlay, Patching Addison Rd to I-88 $5,000,000 Planned Nov 25 New
— 1-80891-0000 1808910000 District 1 I-80 Rehabilitation - Bridges Bridge New Deck, Bridge Repair At Ill 43 (Harlem Ave) (Overhead) $4,000,000 Planned Nov 25 New
— 1-80893-0000 1808930000 District 1 Service Road Miscellaneous Improvement Bridge Removal/Demolition (West Elevated) Over 26th St Connection $300,000 Planned Nov 25 New
— 1-80894-0000 1808940000 District 1 I-55 Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Caton Farm Rd (Overhead) 3 Mi N of US 52 $1,000,000 Planned Nov 25 New
— 1-80896-0000 1808960000 District 1 Dundee RdIL-68 Safety Intersection Improvement, ADA Improvements At Wille Ave/Milwaukee Pl $665,000 Planned Nov 25 New
— 1-80903-0000 1809030000 District 1 IL-64North Ave Preservation - Pavements Smart Overlay Central Park Ave to Damen Ave $1,060,000 Planned Nov 25 New
— 1-80925-0000 1809250000 District 1 111th St Rehabilitation - Pavement Designed Overlay Pulaski Rd to Sacramento Ave $800,000 Planned Nov 25 New
— 1-80949-0000 1809490000 District 1 Lincoln Ave Safety Safety Improvements, Pavement Marking, ADA Improvements Niles Center Rd to Howard St $530,000 Planned Nov 25 New
— 1-80952-0000 1809520000 District 1 Governors Hwy Safety Intersection Reconstn At University Pkwy $9,000,000 Planned Nov 25 New
— 1-80954-0000 1809540000 District 1 Ogden AveUS-34 Reconstruction - Bridges Culvert Replacement, Scour Mitigation At Cress Creek W of Benedetti Dr $550,000 Planned Nov 25 New
— 1-80955-0000 1809550000 District 1 IL-1Route 1 Cutoff Reconstruction - Bridges Culvert Replacement Thorn Creek Trib 0.6 Mi N of US 30 $1,500,000 Planned Nov 25 New
— 1-80956-0000 1809560000 District 1 IL-47 Reconstruction - Bridges Culvert Replacement Over Pingree Creek (3.6 Mi S of US 20/ILL 72) $300,000 Planned Nov 25 New
— 1-80958-1000 1809581000 District 1 IL-53 Reconstruction - Pavement Reconstruction Hoff Rd to N of River Rd $35,000,000 Planned Nov 25 New
— 1-80959-0000 1809590000 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (EB) $15,800,000 Planned Nov 25 New
— 1-80959-1000 1809591000 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (WB) $15,800,000 Planned Nov 25 New
— 1-80972-1000 1809721000 District 1 Coal City RdIL-113 Maintenance - Pavements Shoulder Reconstruction, Drainage I-55 to ILL 53 (Front St) $500,000 Planned Nov 25 New
— 1-80975-0000 1809750000 District 1 Western Ave Preservation - Pavements Smart Overlay 115th St to S of 135th Pl $6,000,000 Planned Nov 25 New
— 1-80976-0000 1809760000 District 1 IL-83Ivanhoe Rd Preservation - Pavements Smart Overlay, Standard Overlay N of Peterson Rd to Winchester Rd $1,000,000 Planned Nov 25 New
— 1-81016-0000 1810160000 District 1 US-41US-41 /Skokie Hwy Preservation - Pavements Smart Overlay Lake-Cook Rd to I-94 (Edens Expwy) $1,535,000 Planned Nov 25 New
— 1-81017-0000 1810170000 District 1 IL-83Sibley Blvd Preservation - Pavements Smart Overlay Oakley Ave to Ill 83 (Torrence Ave) $12,250,000 Planned Nov 25 New
— 1-81030-0000 1810300000 District 1 Lake StUS-20 Preservation - Pavements Crack & Joint Sealing Glen Ellyn Rd to I-355 (Veterans Memorial Tollway) $225,000 Planned Nov 25 New
— 1-81049-0000 1810490000 District 1 159th StUS-6 Preservation - Pavements Crack & Joint Sealing 94th Ave to Western Ave $830,000 Planned Nov 25 New
— 1-81116-0000 1811160000 District 1 I-90I-94Kennedy Expwy Maintenance - Bridges Bridge Deck Overlay At Ogden Ave (SB) (Overhead) $4,500,000 Planned Nov 25 New
2,001–2,100 of 4,218‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.