IDOT Jobs

All dates · 103 jobs · $685,298,000 Sign up free
★ My Jobs

Filtered by: Highway: IL-9 Clear all

103 jobs · $685,298,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
— 2-04901-0000 2049010000 District 2 IL-92 Preservation - Bridges Bridge Repair, Bridge Joint Replace/Repair, Bridge Deck Overlay Mississippi River $3,000,000 Planned Nov 25 New
— 2-07660-0100 2076600100 District 2 IL-92 Reconstruction - Pavement Reconstruction, Widening Existing Pavement, Culvert Replacement 0.2 mi N of ILL 192 to 0.4 Mi N of Brights Ct W of Andalusia $9,645,000 Planned Nov 25 New
— 2-07660-0101 2076600101 District 2 IL-92 Reconstruction - Pavement Utility Adjustment 0.2 mi N of ILL 192 to 0.4 Mi N of Brights Ct W of Andalusia $50,000 Planned Nov 25 New
— 2-17500-0100 2175000100 District 2 IL-92 Reconstruction - Bridges Bridge Replacement Fancy Creek 0.5 Mi E of Andalusia $1,654,000 Planned Nov 25 New
— 2-20436-0100 2204360100 District 2 IL-92 Miscellaneous Improvement Culvert Replacement, Designed Overlay, Cold Milling 115th St (W) in Andalusia to 0.4 mi E of ILL 92 (N) $10,000,000 Planned Nov 25 New
— 2-20614-0100 2206140100 District 2 IL-92 Preservation - Bridges Bridge Deck Repairs, Bridge Repair, Bridge Joint Replace/Repair Phenix Ditch 1.3 mi E of ILL 82 $300,000 Planned Nov 25 New
— 2-30118-0100 2301180100 District 2 IL-84IL-92 Reconstruction - Pavement Reconstruction, Traf Signal Replacement, ADA Improvements 0.1 Mi W of ILL 84 (N) to ILL 5 in Silvis $11,025,000 Planned Nov 25 New
— 2-30118-0140 2301180140 District 2 IL-84IL-92 Reconstruction - Pavement Utility Adjustment 0.1 Mi W of ILL 84 (N) to ILL 5 in Silvis $3,852,000 Planned Nov 25 New
— 2-98500-0000 2985000000 District 2 IL-92 Reconstruction - Pavement Reconstruction, Traf Signal Replacement, ADA Improvements ILL 84 (N) in Silvis to 48th St in Moline $44,100,000 Planned Nov 25 New
— 2-98500-0030 2985000030 District 2 IL-92 Reconstruction - Pavement Utility Adjustment ILL 84 (N) in Silvis to 48th St in Moline $500,000 Planned Nov 25 New
— 2-99560-0100 2995600100 District 2 IL-92 Rehabilitation - Pavement Designed Overlay, Patching 238th St in Illinois City to 0.1 Mi W of ILL 192 $1,686,000 Planned Nov 25 New
— 3-09206-0060 3092060060 District 3 IL-92 Rehabilitation - Pavement Designed Overlay Henry Co Line to E of ILL 40 $6,000,000 Planned Nov 25 New
— 3-09206-1001 3092061001 District 3 IL-92 Initial Construction - Br Bridge (New) Drainage Ditch 0.8 Mi W of ILL 172 $1,000,000 Planned Nov 25 New
— 4-00127-0400 4001270400 District 4 IL-96 Rehabilitation - Pavement Designed Overlay W of Benton St in Lomax to Oak St in Dallas City $6,000,000 Planned Nov 25 New
— 4-00132-0200 4001320200 District 4 IL-9 Rehabilitation - Pavement Designed Overlay Prairie Creek to McLean Co Line $15,000,000 Planned Nov 25 New
— 4-00177-0000 4001770000 District 4 IL-9 Reconstruction - Bridges Bridge Replacement Spoon River 1 Mi S of Blyton $19,800,000 Planned Nov 25 New
— 4-00328-0200 4003280200 District 4 IL-9 Reconstruction - Bridges Bridge Replacement Lost Grove Creek 4 mi W of Fiatt $3,500,000 Planned Nov 25 New
— 4-01024-0100 4010240100 District 4 IL-94Old Us 34 Reconstruction - Bridges Bridge Replacement Old US 34: at Old Tom Creek 0.6 Mi E of Church St; ILL 94: at Honey Creek 1.3 Mi N of CR 400N & at Henderson Overflow 0.3 Mi S of TR 29 $5,280,000 Planned Nov 25 New
— 4-02922-0200 4029220200 District 4 IL-9 Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement Ave F to Ave A in Canton $9,000,000 Planned Nov 25 New
— 4-02924-0000 4029240000 District 4 IL-78IL-9 Rehabilitation - Pavement Designed Overlay E of 1st Ave to 5th Ave in Canton $800,000 Planned Nov 25 New
— 4-03024-2540 4030242540 District 4 IL-91 Preservation - Bridges Bridge Repair, Bridge Deck Overlay At North Creek, Prince Run Trib, Mud Run Creek & Camp Run Creek $1,900,000 Planned Nov 25 New
— 4-03024-2560 4030242560 District 4 IL-29IL-98 Preservation - Bridges Bridge Repair, Bridge Deck Overlay ILL 98 at Lick Creek & Lick Creek Trib; ILL 29 at Little Lick Creek $1,900,000 Planned Nov 25 New
— 4-03050-0100 4030500100 District 4 IL-41IL-9 Rehabilitation - Pavement Designed Overlay, Curb And Gutter, Storm Sewer (New) NCL to SCL of Bushnell $5,200,000 Planned Nov 25 New
— 4-03622-0000 4036220000 District 4 IL-94 Rehabilitation - Pavement Designed Overlay Henderson Creek Overflow to Old US 34 in Biggsville $15,000,000 Planned Nov 25 New
— 4-03622-0600 4036220600 District 4 IL-94 Rehabilitation - Pavement Designed Overlay 1500E to Hancock Co Line $8,000,000 Planned Nov 25 New
— 4-03622-0800 4036220800 District 4 IL-94 Rehabilitation - Pavement Designed Overlay JCT ILL 135 (S) to Henderson Creek Overflow $10,400,000 Planned Nov 25 New
— 4-04510-0100 4045100100 District 4 IL-9US-24 Initial Construction - Pa Additional Lanes Banner to E of Romine Rd $49,000,000 Planned Nov 25 New
— 4-04510-0102 4045100102 District 4 IL-9US-24 Initial Construction - Pa Utility Adjustment Banner to E of Romine Rd $700,000 Planned Nov 25 New
— 4-04510-0150 4045100150 District 4 IL-9US-24 Miscellaneous Improvement Bridge Replacement Banner to E of Romine Rd (Various Structures) $5,600,000 Planned Nov 25 New
— 4-04510-0203 4045100203 District 4 IL-9US-24 Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines $700,000 Planned Nov 25 New
— 4-04510-0400 4045100400 District 4 IL-9US-24 Initial Construction - Pa Additional Lanes E of Romine Rd to Kingston Mines $62,000,000 Planned Nov 25 New
— 4-04510-0403 4045100403 District 4 IL-9US-24 Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines $600,000 Planned Nov 25 New
— 4-04510-0450 4045100450 District 4 IL-9US-24 Reconstruction - Bridges Bridge Replacement 0.4 Mi E of Trivoli Rd & 0.1 Mi E of Glasford Rd $2,150,000 Planned Nov 25 New
— 4-04819-0600 4048190600 District 4 IL-97 Rehabilitation - Pavement Designed Overlay S of Littlers Creek to ILL 116 $12,600,000 Planned Nov 25 New
— 4-04819-0650 4048190650 District 4 IL-97 Rehabilitation - Pavement Utility Adjustment S of Littlers Creek to ILL 116 $500,000 Planned Nov 25 New
— 4-06622-0000 4066220000 District 4 IL-17IL-94 Rehabilitation - Pavement Standard Overlay 11th Ave to E of ILL 94 (N) in Aledo $3,500,000 Planned Nov 25 New
— 4-07219-0700 4072190700 District 4 IL-9US-24 Reconstruction - Bridges Bridge New Deck KJRY RR 1 Mi E of Mapleton $15,000,000 Planned Nov 25 New
— 4-07225-0200 4072250200 District 4 IL-91 Rehabilitation - Pavement Designed Overlay 0.1 Mi S of Legion Hall Rd to Grange Hall Rd $4,000,000 Planned Nov 25 New
— 4-08510-0150 4085100150 District 4 IL-9 Reconstruction - Bridges Bridge Replacement Drowning Fork Creek 2 mi w of ILL 41 $5,000,000 Planned Nov 25 New
— 4-08825-0300 4088250300 District 4 IL-17IL-91 Rehabilitation - Pavement Designed Overlay Toulon ECL to Spoon River $17,000,000 Planned Nov 25 New
— 4-09017-0000 4090170000 District 4 IL-29IL-9 Rehabilitation - Pavement Designed Overlay N of Thornton St to Mackinaw River $10,000,000 Planned Nov 25 New
— 4-09022-0400 4090220400 District 4 IL-98 Rehabilitation - Pavement Culvert Replacement 0.2 mi E of Parkway Dr in North Pekin to 0.2 mi W of Flint St in Morton $25,000,000 Planned Nov 25 New
— 4-09495-0000 4094950000 District 4 IL-9 Reconstruction - Bridges Bridge Replacement At Dillon Creek 1 Mi W of Tremont $2,500,000 Planned Nov 25 New
— 5-50090-0000 5500900000 District 5 IL-9 Preservation - Bridges Bridge Deck Overlay 2 mi E of Rankin; 3.5 mi E of Rankin; 0.5 mi E of East Lynn $1,500,000 Planned Nov 25 New
— 5-53153-0000 5531530000 District 5 IL-9 Rehabilitation - Pavement Standard Overlay ILL 1 at Hoopeston to Indiana State Line $8,000,000 Planned Nov 25 New
— 5-53153-0200 5531530200 District 5 IL-9 Preservation - Bridges Bridge Deck Overlay At N Fork Vermilion River 0.3 mi W of 1700 Rd E of Hoopeston $850,000 Planned Nov 25 New
— 5-53384-0000 5533840000 District 5 IL-9US-150 Rehabilitation - Pavement Designed Overlay, ADA Improvements, Curb And Gutter N Main St to E Empire St in Bloomington $11,519,000 Planned Nov 25 New
— 5-53384-0200 5533840200 District 5 IL-9US-150 Rehabilitation - Pavement Utility Adjustment N Main St to E Empire St in Bloomington $50,000 Planned Nov 25 New
— 5-53514-0000 5535140000 District 5 IL-9 Reconstruction - Bridges Bridge Replacement Money Creek 3.8 Mi E of ILL 165 $2,000,000 Planned Nov 25 New
— 5-53938-0000 5539380000 District 5 IL-9 Rehabilitation - Pavement Designed Overlay, Safety Improvements Arrowsmith Rd to Ford Co Line $9,200,000 Planned Nov 25 New
— 6-00364-0000 6003640000 District 6 IL-94US-136 Rehabilitation - Pavement Designed Overlay, ADA Improvements US 136: W OF FAYETTE ST TO MADISON ST; US 136 / ILL 94: MADISON ST TO W OF 1500 N; ILL 94: N OF US 136 (ALL IN CARTHAGE) $2,500,000 Planned Nov 25 New
— 6-00413-0000 6004130000 District 6 IL-78IL-97US-136 Reconstruction - Pavement Reconstruction, ADA Improvements, Vertical Realignment US 136: ILLINOIS RIVER BRIDGE TO S OF RANDOLPH ST; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO S OF ILLINOIS ST (ALL IN HAVANA) $8,100,000 Planned Nov 25 New
— 6-00413-0002 6004130002 District 6 IL-78IL-97US-136 Reconstruction - Pavement Utility Adjustment US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA) $250,000 Planned Nov 25 New
— 6-00413-0300 6004130300 District 6 IL-97US-136 Miscellaneous Improvement Traf Signal Replacement, ADA Improvements AT WATER ST, SCHRADER ST & PROMENADE ST IN HAVANA $1,300,000 Planned Nov 25 New
— 6-00568-0000 6005680000 District 6 Great River RdIL-96 Rehabilitation - Pavement Designed Overlay, ADA Improvements, Parking Improvement W OF WINCHESTER ST IN NAUVOO TO SHERIDAN CREEK 0.9 MI S OF NAUVOO $5,000,000 Planned Nov 25 New
— 6-00753-0000 6007530000 District 6 IL-96 Reconstruction - Pavement Reconstruction, ADA Improvements VERMONT ST TO S OF ALDO BLVD IN QUINCY $4,100,000 Planned Nov 25 New
— 6-00753-0200 6007530200 District 6 IL-96 Rehabilitation - Pavement Designed Overlay, ADA Improvements LOCUST ST TO N OF VERMONT ST IN QUINCY $2,800,000 Planned Nov 25 New
— 6-00753-0300 6007530300 District 6 IL-96 Rehabilitation - Pavement Standard Overlay, ADA Improvements 0.1 MI N OF KOCHS LN TO LOCUST ST IN QUINCY $2,100,000 Planned Nov 25 New
— 6-00776-0000 6007760000 District 6 IL-9 Rehabilitation - Pavement Designed Overlay, ADA Improvements LA HARPE ECL TO W OF PARK LN / G ST IN LA HARPE $2,000,000 Planned Nov 25 New
— 6-00779-0000 6007790000 District 6 IL-125IL-97 Reconstruction - Pavement Bridge Replacement 0.5 MI W OF ILL 97/125 JCT TO OLD COVERED BRIDGE LN $23,500,000 Planned Nov 25 New
— 6-00779-0100 6007790100 District 6 IL-125IL-97 Initial Construction - Pa Bridge (New) 0.5 MI W OF ILL 97/125 JCT TO OLD COVERED BRIDGE LN $16,500,000 Planned Nov 25 New
— 6-00836-0000 6008360000 District 6 IL-96 Preservation - Bridges Bridge Deck Overlay AMBROSIA CREEK 1 MI N OF US 54 $600,000 Planned Nov 25 New
— 6-00848-0000 6008480000 District 6 IL-97Jefferson St Rehabilitation - Bridges Bridge New Deck AT SPRING CREEK 0.1 MI E OF ILL 4 IN SPRINGFIELD $4,500,000 Planned Nov 25 New
— 6-01150-0000 6011500000 District 6 IL-96US-136 Rehabilitation - Pavement Designed Overlay, ADA Improvements US 136: 0.1 MI E OF MAIN ST IN HAMILTON TO 0.1 MI E OF HAMILTON ECL & ILL 96: US 136 TO S OF US 136 IN HAMILTON $2,700,000 Planned Nov 25 New
— 6-01276-0000 6012760000 District 6 IL-9IL-94 Rehabilitation - Pavement Designed Overlay W OF KEOKUK JUNCTION RAILWAY TO W OF TR 244 (2400 E ST) W OF LA HARPE $2,800,000 Planned Nov 25 New
— 6-01285-0000 6012850000 District 6 IL-96 Rehabilitation - Pavement Designed Overlay, Bi-Direct Left Turn Lane, ADA Improvements S OF ALDO BLVD TO 0.1 MI S OF STATE ST IN QUINCY $4,600,000 Planned Nov 25 New
— 6-01285-0100 6012850100 District 6 IL-96 Miscellaneous Improvement Traf Signal Replacement, ADA Improvements AT 24TH & STATE ST, AT 30TH ST & AT STATE & 36TH ST IN QUINCY $1,400,000 Planned Nov 25 New
— 6-01467-0000 6014670000 District 6 Great River RdIL-96 Rehabilitation - Pavement Designed Overlay 0.1 MI N OF CH 24 (CONNABLE RD) 3 MI E OF NAUVOO ECL TO W OF WINCHESTER ST IN NAUVOO $3,000,000 Planned Nov 25 New
— 6-01468-0000 6014680000 District 6 Great River RdIL-96 Rehabilitation - Pavement Designed Overlay SHERIDAN CREEK 0.9 MI S OF NAUVOO TO WAGGONER CREEK 3.7 MI N OF HAMILTON $5,300,000 Planned Nov 25 New
— 6-01516-0000 6015160000 District 6 IL-106IL-99 Reconstruction - Bridges Bridge Replacement ILL 99: DITCH 2 MI & 3.3 MI SW OF VERSAILLES SCL; ILL 106: DITCH 6.2 MI SE OF BARRY ECL $6,000,000 Planned Nov 25 New
— 6-01528-0000 6015280000 District 6 IL-99US-24 Rehabilitation - Pavement Designed Overlay, New Shoulders, ADA Improvements US 24: 0.3 MI W OF BUCKHORN / DAMON RD TO ILL 99 N (CROSS ST) & ILL 99 S (PITTSFIELD RD) TO 0.5 MI E; US 24 / ILL 99: CROSS ST TO PITTSFIELD RD (ALL IN MOUNT STERLING) $2,700,000 Planned Nov 25 New
— 6-01528-0100 6015280100 District 6 IL-99 Rehabilitation - Pavement Standard Overlay, Bi-Direct Left Turn Lane, Curb And Gutter US 24 IN MOUNT STERLING TO 1.6 MI S OF ILL 107 $4,400,000 Planned Nov 25 New
— 6-01528-0400 6015280400 District 6 IL-99US-24 Miscellaneous Improvement Traf Signal Replacement, ADA Improvements AT CROSS ST & PITTSFIELD RD IN MOUNT STERLING $800,000 Planned Nov 25 New
— 6-02017-0000 6020170000 District 6 IL-99 Preservation - Pavements Cape Seal, Fog Seal 1.6 MI S OF ILL 107 TO S OF VERSAILLES NCL $1,100,000 Planned Nov 25 New
— 6-02027-0000 6020270000 District 6 IL-96 Reconstruction - Bridges Culvert Replacement AT LEVEE 0.3 MI SE OF US 54 $1,300,000 Planned Nov 25 New
— 6-02056-0000 6020560000 District 6 IL-110IL-336IL-94 Preservation - Pavements Microsurfacing 1 Pass, Fog Seal 3.1 MI S OF US 136 IN CARTHAGE TO 0.8 MI N OF ILL 94 S JCT $1,800,000 Planned Nov 25 New
— 6-02058-0000 6020580000 District 6 IL-96 Preservation - Pavements Cape Seal, Fog Seal HANCOCK CO LINE TO BEAR CREEK $900,000 Planned Nov 25 New
— 6-02060-0000 6020600000 District 6 IL-104IL-99 Preservation - Pavements Cape Seal, Fog Seal ILL 99: MCGEE DRAINAGE DITCH TO ILL 104; ILL 104: E OF MCKEE CREEK IN CHAMBERSBURG TO 0.6 MI E OF ILL 99 & E OF WASHINGTON ST IN MEREDOSIA TO US 67 $1,500,000 Planned Nov 25 New
— 6-02099-0000 6020990000 District 6 IL-94 Preservation - Pavements Crack & Joint Sealing POWELLTON RD TO 1.1 MI N OF CH 29 (FERRIS RD) N OF CARTHAGE $100,000 Planned Nov 25 New
— 6-60116-0000 6601160000 District 6 IL-96 Rehabilitation - Pavement Designed Overlay 0.1 MI SW OF MEADOW ST IN NIOTA TO 0.1 MI N OF CH 24 (CONNABLE RD) 3 MI E OF NAUVOO ECL $4,100,000 Planned Nov 25 New
— 6-60126-0000 6601260000 District 6 IL-96 Rehabilitation - Pavement Culvert Extension US 24 TO 0.1 MI N OF KOCHS LN IN QUINCY $7,800,000 Planned Nov 25 New
— 6-60129-0000 6601290000 District 6 IL-96 Rehabilitation - Pavement Bridge New Deck, Bridge Widening 0.1 MI S OF STATE ST IN QUINCY TO 0.2 MI E OF 36TH ST S OF QUINCY $11,000,000 Planned Nov 25 New
— 6-60129-0002 6601290002 District 6 IL-96 Rehabilitation - Pavement Utility Adjustment 0.1 MI S OF STATE ST IN QUINCY TO 0.2 MI E OF 36TH ST S OF QUINCY $400,000 Planned Nov 25 New
— 6-60129-1000 6601291000 District 6 IL-96 Rehabilitation - Pavement Culvert Replacement 0.2 MI E OF 36TH ST TO MILL CREEK 0.3 MI S OF I-172 S OF QUINCY $5,700,000 Planned Nov 25 New
— 6-60129-1002 6601291002 District 6 IL-96 Rehabilitation - Pavement Utility Adjustment 0.2 MI E OF 36TH ST TO MILL CREEK 0.3 MI S OF I-172 S OF QUINCY $300,000 Planned Nov 25 New
— 6-73430-0000 6734300000 District 6 IL-61IL-94 Reconstruction - Bridges Bridge Replacement BIG NECK CREEK 0.5 MI N OF ILL 94 $2,200,000 Planned Nov 25 New
FY 2025 2-12925-0000 2129250000 District 2 IL-78IL-92 Rehabilitation - Pavement Standard Overlay, Cold In-Place Recycling, Cold Milling ILL 78: 0.2 mi N of ILL 92 to N of W 8th St in Prophetstown & ILL 92: ILL 78 to Bureau Co Line $8,000,000 Planned Nov 25 New
FY 2025 3-00927-0080 3009270080 District 3 IL-47IL-54IL-9 Preservation - Pavements Crack & Joint Sealing ILL 47 in Gibson City to 900E Rd; ILL 115 to Baltimore Dr in Paxton $200,000 Planned Nov 25 New
FY 2025 4-00015-0100 4000150100 District 4 IL-78IL-97US-136 Preservation - Bridges Bridge Painting, Bridge Repair Illinois River at Havana $15,000,000 Planned Nov 25 New
FY 2025 4-00025-0500 4000250500 District 4 IL-90IL-91 Rehabilitation - Pavement Designed Overlay ILL 91 (N) in Princeville to ILL 91 (S) N of Dunlap $5,200,000 Planned Nov 25 New
FY 2025 4-02024-2410 4020242410 District 4 IL-78IL-97US-24 Preservation - Pavements Crack & Joint Sealing US 24: Maple St in Lewistown to Little America; ILL 78/97: US 24 to S of Clark Rd $250,000 Planned Nov 25 New
FY 2025 4-03617-0000 4036170000 District 4 IL-94 Rehabilitation - Pavement Designed Overlay ILL 116 to 300N $7,000,000 Planned Nov 25 New
FY 2025 4-07010-0203 4070100203 District 4 IL-97US-150 Rehabilitation - Pavement Designed Overlay US 150: 0.2 mi E of I-74 W ramp to 0.1 mi W of JCT ILL 97 (S); ILL 97: JCT US 150 (W) to S of CH 17 $2,000,000 Planned Nov 25 New
FY 2025 4-07225-0000 4072250000 District 4 IL-90 Rehabilitation - Pavement Standard Overlay ILL 90/91 JCT (E) to ILL 40 $2,750,000 Planned Nov 25 New
FY 2025 4-09022-0300 4090220300 District 4 IL-98 Rehabilitation - Pavement Designed Overlay ILL 29 to 0.2 mi E of Parkway Dr $2,400,000 Planned Nov 25 New
FY 2025 5-52980-0000 5529800000 District 5 IL-9 Reconstruction - Bridges Bridge Replacement At stream 0.4 mi W of 3200 East Rd NW of Arrowsmith $1,500,000 Planned Nov 25 New
FY 2025 5-53151-0000 5531510000 District 5 IL-9 Rehabilitation - Pavement Designed Overlay Tazewell Co Line to ILL 122 $7,000,000 Planned Nov 25 New
FY 2025 5-53385-0000 5533850000 District 5 IL-9IL-9 BUS-150 Rehabilitation - Pavement Designed Overlay, ADA Improvements, Curb And Gutter ILL 9: W Mulberry St to Center St; US 150: N Center St to W Locust St in Bloomington $14,810,000 Planned Nov 25 New
FY 2025 5-53386-0000 5533860000 District 5 IL-9 BUS-150 F Reconstruction - Pavement Reconstruction, ADA Improvements, Curb And Gutter W of Towanda Ave to N Main St in Bloomington $19,747,000 Planned Nov 25 New
FY 2025 6-02053-0000 6020530000 District 6 IL-96 Preservation - Pavements Crack & Joint Sealing HANCOCK CO LINE TO BEAR CREEK $90,000 Planned Nov 25 New
1–100 of 103Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.