Filtered by: County: Will Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Feb 27, 2026 | 61M25 | WillDistrict 1 | Rehabilitate of three-span RC channel beam bridge carrying Smith Road over Long Run Creek between W. 138th Street and W. 135th Street in Will County. Work includes replacement of existing channel beams with steel tub girder and concrete deck superstructure, substructure repair, pavement widening, HMA resurfacing and other required work. | — | Executed | D. Construction, Inc. $1,561,361 · | ||
| Feb 27, 2026 | 62P01 | WillDistrict 1 | A single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL The project primarily consists of a single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL. | — | Executed | Austin Tyler Construction, Inc. $4,980,727 · | ||
| Feb 27, 2026 | 62R23 | WillDistrict 1 | (2,215.87-Ft) Replacement of the Des Plaines River Bridge including the realignment and reconstruction of the mainline pavement, cross-road reconstruction, enclosed storm sewer system with drainage structures, detention ponds, earth excavation and embankment grading, retaining and noise abatement walls, barrier and moment slab construction, bridge replacement, roadway lighting, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, navigation lighting, tra | — | Executed | D. Construction, Inc. & Kraemer North America, LLC JV $164,963,136 · | ||
| Feb 27, 2026 | 62Y26 | WillDistrict 1 | (4,658.13-Ft) Bridge Repairs (S.N. 099-0298) includes bridge deck scarification latex concrete overlay, joint reconstruction, patching, and substructure repair butt joints, HMA overlay of the approach pavement, drainage structure adjustments, and pavement marking replacement located along IL Route 50 (Governors Highway) over the CN railroad from Watson Road to Egyptian Trail, in the Village of Monee in Will County, Illinois. | — | Executed | Iroquois Paving Corporation $1,191,152 · | ||
| Feb 27, 2026 | 78B58 | WilliamsonDistrict 9 | 1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Franklin County line to 17th Street, north of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $744,591 · | ||
| Feb 27, 2026 | 80B13 | WillDistrict 1 | (1.07-Mile) Standard Overlay and ADA Improvements project includes hot-mix asphalt removal, PCC removal, pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, pedestrian signals, detector loops. Location: IL 53 (Broadway Street/ Ruby Street) from Teale Woods Trail (South of IL 7) to Bluff Street, within the City of Joliet. | — | Executed | P. T. Ferro Construction Co. $1,424,777 · | ||
| Feb 27, 2026 | 80B83 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $160,313 · | ||
| Feb 27, 2026 | 80B84 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $211,275 · | ||
| Feb 27, 2026 | 99757 | WilliamsonDistrict 9 | Construction of a roundabout intersection at Cambria Road and Cardinal Road/ Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. , Construction of a roundabout intersection at Cambria Road and Cardinal Road/Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. | — | Executed | Samron Midwest Contracting, Inc. $1,715,790 · |
1–9 of 9
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.