Filtered by: County: Various Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 29, 2022 | 46592 | VariousDistrict 2 | Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols with This work shall consist of placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | Precision Pavement Markings Inc. $1,478,750 · | ||
| Apr 29, 2022 | 62R39 | VariousDistrict 1 | Repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Town This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in Cook, various Counties. | — | Executed | Western Remac, Inc. $765,120 · | ||
| Apr 29, 2022 | 64R46 | VariousDistrict 2 | Maintain and service all intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public. | — | Executed | Laser Electric, Inc. $154,339 · | ||
| Apr 29, 2022 | 68G74 | VariousDistrict 4 | Traffic signal mast arm replacement at various locations in Peoria, Tazewell, and McDonough Counties. | — | Executed | Oberlander Electric Co. $598,683 · | ||
| Apr 29, 2022 | 72856 | VariousDistrict 6 | Maintenance and repair of surveillance cameras, vehicle detection, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet network and all peripheral equipment throughout District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $190,640 · | ||
| Apr 29, 2022 | 74B11 | VariousDistrict 7 | Applying a bituminous surface treatment to various District 7 maintenance yards: Charleston, Greenup, Mattoon, Shelbyville and Sullivan. | — | Executed | Beniach Construction Co., Inc. $264,854 · | ||
| Apr 29, 2022 | 74B12 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining the electrical systems in good operating condition throughout District 7. | — | Executed | Bodine Electric of Decatur $654,534 · | ||
| Apr 29, 2022 | 78907 | VariousDistrict 9 | Installing retroreflective backplates on traffic signals throughout District 9. | — | Executed | F. W. Electric, Inc. $297,533 · | ||
| Jun 17, 2022 | 46575 | VariousDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, 8, 12, and 24 inches i This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, 8, 12, and 24 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,004,800 · | ||
| Jun 17, 2022 | 46589 | VariousDistrict 3 | Guardrail and barrier wall delineation. | — | Executed | Northern Contracting, Inc. $484,247 · | ||
| Jun 17, 2022 | 46595 | VariousDistrict 1 | Placing various widths of thermoplastic, preform plastic, hot spray thermoplastic and modified urethane paveme This work shall consist of placing various widths of thermoplastic, preform plastic, hot spray thermoplastic and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings and the installation of grooved pavement markings within the limits specified on each individual work order. | — | Executed | Precision Pavement Markings Inc. $2,545,500 · | ||
| Jun 17, 2022 | 46599 | VariousDistrict 5 | Pavement marking repair at various locations district wide. | — | Executed | Varsity Striping & Construction Co. $291,563 · | ||
| Jun 17, 2022 | 46600 | VariousDistrict 4 | Placing preformed plastic, epoxy and modified urethane pavment markings, letters and symbols, and the removal This work shall consist of placing preformed plastic, epoxy and modified urethane pavment markings, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,589,417 · | ||
| Jun 17, 2022 | 46601 | VariousDistrict 4 | Removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement mar This work shall consist of removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement markers or lenses within the limits shown in the plans. | — | Executed | P & P Construction Co. $391,605 · | ||
| Jun 17, 2022 | 62R48 | VariousDistrict 1 | Cleaning (nighttime sweeping) various expressways throughout District One in various counties (332.1-Mile) Improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties. | — | Executed | Elgin Sweeping Services, Inc. $4,903,360 · | ||
| Jun 17, 2022 | 62R49 | VariousDistrict 1 | Cleaning (daytime sweeping) various expressways throughout District One in various counties (116.5-Mile) Improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties. | — | Rejected | |||
| Jun 17, 2022 | 64R45 | VariousDistrict 2 | Removal of dead trees along State maintained routes. | — | Rejected | Homer Tree Service, Inc. $250,750 · | ||
| Jun 17, 2022 | 64R59 | VariousDistrict 2 | Traffic signal cabinet and controller upgrades at nine (9) railroad interconnected intersection: US 6 at Patriot Way (Annawan); US 20 EB Ramp at S. Appleton Road (Belvidere); IL 92118th Ave at IL 84119th St (Silvis); IL 9214th Ave at 15th, 17th, 19th, and 23rd Streets (Moline); IL 9211st Ave at 17th and 18th Streets (Rock Island). | — | Executed | Davenport Electric Contract Company $258,944 · | ||
| Jun 17, 2022 | 66M44 | VariousDistrict 3 | One year contract repair damaged High Tension Cable Median Barrier, Guard Rail Attenuators, etc., caused by motorists along various routes in District 3. | — | Executed | Northern Contracting, Inc. $1,767,718 · | ||
| Jun 17, 2022 | 66M58 | VariousDistrict 3 | Districtwide, Vegetation Control - Tree Removal. | — | Executed | Nettle Creek Nursery, Inc. $396,348 · | ||
| Jun 17, 2022 | 68G89 | VariousDistrict 4 | Weed spraying (off road) in various counties on various routes. | — | Executed | The Daltons Inc. $138,418 · | ||
| Jun 17, 2022 | 68G90 | VariousDistrict 4 | Lighting, traffic signals, and ITS upgrades at various locations within District 4. | — | Executed | Laser Electric, Inc. $266,565 · | ||
| Jun 17, 2022 | 70F54 | VariousDistrict 5 | The project is to establish surveillance points at various interchange locations and to connect the surveillance points to existing fiber optic networks located in District 5 including the counties of Mclean, DeWitt, Piatt, Douglas, and Champaign. | — | Executed | Bodine Electric of Decatur $1,495,623 · | ||
| Jun 17, 2022 | 70F78 | VariousDistrict 5 | Upgrading and repairing 3 locations of cable median barrier on I 57 and I 74. | — | Executed | Kujo, Inc. $783,300 · | ||
| Jun 17, 2022 | 74B17 | VariousDistrict 7 | Railroad signal upgrades at six locations throughout District 7. | — | Executed | Bodine Electric of Decatur $258,916 · | ||
| Jun 17, 2022 | 74B20 | VariousDistrict 7 | Repairs of location-specific motorist caused guardrail damage and on-call repairs of guardrail damage throughout District 7. | — | Executed | COLLINS & HERMANN, INC. $622,918 · | ||
| Jun 17, 2022 | 76P61 | VariousDistrict 8 | Patching at various locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $780,494 · | ||
| Jun 17, 2022 | 76P62 | VariousDistrict 8 | Weed spraying for John Grass along I-64, I-55, I-55/70, I-255, I-270 and I-255. | — | Executed | The Daltons Inc. $60,708 · | ||
| Jun 17, 2022 | 76P96 | VariousDistrict 8 | Highway lighting, traffic signal and repair at various locations throughout District 8. | — | Executed | Electrico, Inc. $949,010 · | ||
| Jun 17, 2022 | 76R03 | VariousDistrict 8 | Guardrail and cable median repair at various locations in District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $1,899,983 · | ||
| Jun 17, 2022 | 78946 | VariousDistrict 9 | Electrical repair and/or replacement at various locations throughout District 9. | — | Executed | F. W. Electric, Inc. $114,770 · | ||
| Jun 17, 2022 | 78947 | VariousDistrict 9 | Upgrade railroad interconnected traffic signals in Carbondale, Herrin and Anna. | — | Rejected | Wissehr Electric, Inc. $447,258 · | ||
| Jun 17, 2022 | 78952 | VariousDistrict 9 | Replace batteries in uninterruptable power supplies at various locations throughout District 9. | — | Active | Electrico, Inc. $75,240 · | ||
| Jul 15, 2022 | 46596 | VariousDistrict 6 | Pavement marking on various routes in various counties of District 6. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,107,528 · | ||
| Jul 15, 2022 | 62R86 | VariousDistrict 1 | The repair and installation of fence along various expressway and arterial highways in various counties throug This improvement consists of the repair and installation of fence along various expressway and arterial highways in various counties throughout District One. | — | Executed | Fence Masters, Inc. $841,454 · | ||
| Jul 15, 2022 | 70F97 | VariousDistrict 5 | District Wide On-call Guardrail and Fence Repairs. | — | Executed | COLLINS & HERMANN, INC. $1,293,807 · | ||
| Aug 5, 2022 | 46602 | VariousDistrict 0 | Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in Regions Two and Three. | — | Executed | Western Remac, Inc. $3,841,166 · | ||
| Aug 5, 2022 | 46603 | VariousDistrict 0 | Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in regions four and five. | — | Executed | Western Remac, Inc. $3,839,966 · | ||
| Aug 5, 2022 | 62N42 | VariousDistrict 1 | (76,700-Ft) Crack and Joint Sealing. Project located along I-55 from Weber Rd to Willow Springs Rd in Will, DuPage and Cook Counties. | — | Executed | SKC Construction, Inc. $1,264,073 · | ||
| Aug 5, 2022 | 72898 | VariousDistrict 6 | On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6 as needed. | — | Executed | COLLINS & HERMANN, INC. $1,259,903 · | ||
| Aug 5, 2022 | 76P95 | VariousDistrict 8 | Maintain and service all ITS equipment at various locations throughout District 8 and replacement of the dynamic message board on westbound I-70 at mile marker 16.8. | — | Executed | Wissehr Electric, Inc. $457,609 · | ||
| Aug 5, 2022 | 78892 | VariousDistrict 9 | Repairing or fixing guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,060,735 · | ||
| Sep 23, 2022 | 46576 | VariousDistrict 1 | Placing various width of thermoplastic, preform plastic, modified urethane and hot spray thermoplastic pavemen The work consists of placing various width of thermoplastic, preform plastic, modified urethane and hot spray thermoplastic pavement marking lines, letters and symbols and the removal of existing pavement markings and the installation of grooved pavement markings within the limits specified on each individual work order on various routes in various counties in District 1. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $5,800,895 · | ||
| Sep 23, 2022 | 46598 | VariousDistrict 7 | Various lengths of pavement marking rehabilitation throughout District 7. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $718,175 · | ||
| Sep 23, 2022 | 62T88 | VariousDistrict 1 | Repairing high tension cable median barrier systems throughout District 1 on a work order basis The work to be completed under this consists of repairing high tension cable median barrier systems throughout District 1 on a work order basis. | — | Executed | Kujo, Inc. $648,821 · | ||
| Sep 23, 2022 | 64S10 | VariousDistrict 2 | On-call maintenance of electrical facilities along State Maintained Routes in East half of District 2. | — | Executed | William Charles Construction Co, LLC $370,373 · | ||
| Sep 23, 2022 | 64S11 | VariousDistrict 2 | On-call maintenance of electrical facilities along State Maintained Routes in West half of District 2. | — | Executed | Davenport Electric Contract Company $190,450 · | ||
| Sep 23, 2022 | 66M39 | VariousDistrict 3 | This project includes the installation of various combinations of new traffic signal heads, retroreflective backplates, and LED signal face lens covers. The work is proposed at eight intersections located in DeKalb, Kankakee, Kendall, and LaSalle Counties. | — | Executed | H & H Electric Co. $449,954 · | ||
| Sep 23, 2022 | 68H17 | VariousDistrict 4 | Installation of traffic signal cabinets and equipment, CCTV cameras, and network communications equipment at various locations within District 4. | — | Executed | Oberlander Electric Co. $470,200 · | ||
| Sep 23, 2022 | 68H18 | VariousDistrict 4 | Installation of battery backup systems, CCTV cameras, ITS components and wireless radio communications equipment at various locations within District 4. | — | Executed | Laser Electric, Inc. $455,836 · | ||
| Sep 23, 2022 | 76P97 | VariousDistrict 8 | Repair and maintenance of electrical equipment at various pump stations throughout District 8. | — | Executed | Electrico, Inc. $48,508 · | ||
| Nov 18, 2022 | 46610 | VariousDistrict 5 | Removing reflectors, placing new reflectors, removing damaged RRPM castings, and placing new RRPM castings. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $954,532 · | ||
| Nov 18, 2022 | 62N31 | VariousDistrict 1 | (3.04-Mile) Temp pavement construction, median and shoulder rehab, ditch grading, temp drainage improvements, traffic staging, earthwork, erosion control, construction layout, pavement markings, temp lighting, and landscaping on I-80 from E of Ridge Road to E of River Road in Villages of Minooka and Shorewood and Troy Township. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $8,063,411 · | ||
| Nov 18, 2022 | 62T90 | VariousDistrict 1 | Installing guardrail at new locations and repairing existing damaged guardrail and traffic barrier terminals o The work to be completed under this contract consists of installing guardrail at new locations and repairing existing damaged guardrail and traffic barrier terminals on a work order basis throughout District 1. | — | Executed | Kujo, Inc. $2,740,221 · | ||
| Nov 18, 2022 | 62U33 | VariousDistrict 1 | Expressway daytime sweeping throughout the northern half of District 1 The work to be completed under this contract consists of expressway daytime sweeping throughout the northern half of District 1. | — | Active | |||
| Nov 18, 2022 | 62U34 | VariousDistrict 1 | Tree removal in various counties in District 1 The improvement consists of tree removal in various counties in District 1. | — | Executed | McGinty Bros., Inc. $683,392 · | ||
| Nov 18, 2022 | 64R75 | VariousDistrict 2 | Washing seventeen bridges at various locations in Carroll, Ogle, Stephenson, and Whiteside Counties. | — | Executed | M & M Concrete, Inc. $130,950 · | ||
| Nov 18, 2022 | 64R76 | VariousDistrict 2 | Washing twelve bridges at various locations in Henry, Lee, Rock Island and Whiteside Counties. | — | Executed | All States Painting, Inc. $133,000 · | ||
| Nov 18, 2022 | 64R81 | VariousDistrict 2 | Washing three bridges over the Mississippi River, Carroll County (SN 008-0052) carrying US 52/IL 64, Rock Island County (SN 081-9905) carrying US 67 and Whiteside County (SN 098-6003) carrying US 30. | — | Executed | M & M Concrete, Inc. $126,250 · | ||
| Nov 18, 2022 | 64R82 | VariousDistrict 2 | Washing six bridges over the Rock River in Henry, Rock Island, and Whiteside Counties. | — | Executed | All States Painting, Inc. $92,000 · | ||
| Nov 18, 2022 | 64R84 | VariousDistrict 2 | Washing eight bridges at various locations in Henry, Lee, Ogle, Stephenson, and Whiteside Counties. | — | Executed | All States Painting, Inc. $81,900 · | ||
| Nov 18, 2022 | 70F43 | VariousDistrict 5 | Bridge Painting at 11 Structure Locations on Various Routes in Champaign, Mclean, and Piatt Counties. | — | Executed | ERA-Valdivia Contractors, Inc. $2,159,568 · | ||
| Nov 18, 2022 | 72022 | VariousDistrict 6 | Lot improvements at the Barry, Divernon, Havana, Mason City and Taylorville Maintenance Yards. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $315,917 · | ||
| Nov 18, 2022 | 76R44 | VariousDistrict 8 | Broadlead weed spraying on various interstates in various counties of District. | — | Executed | The Daltons Inc. $192,982 · | ||
| Jan 20, 2023 | 62T89 | VariousDistrict 1 | Dead tree removal located within the right-of-way limits of state-maintained routes located in District One (counties of Cook, DuPage, Kane, Lake, McHenry, and Will). | — | Executed | Homer Tree Service, Inc. $550,775 · | ||
| Jan 20, 2023 | 62T92 | VariousDistrict 1 | The proposed improvement is located along various expressways and arterial routes at various locations in District One. | — | Executed | MYS, Incorporated $524,210 · | ||
| Jan 20, 2023 | 62U02 | VariousDistrict 1 | Installing signs at new locations and repairing existing damaged signs on a work order basis throughout Distri The work to be completed under this contract consists of installing signs at new locations and repairing existing damaged signs on a work order basis throughout District 1. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $374,700 · | ||
| Jan 20, 2023 | 62U50 | VariousDistrict 1 | Removal and replacement of impact attenuators and sand module replacement on a work order various State mainta The work to be completed under this contract consists of removal and replacement of impact attenuators and sand module replacement on a work order various State maintained expressway and arterial routes within the counties of Cook, DuPage, Will, Lake, McHenry, and Kane. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,554,255 · | ||
| Jan 20, 2023 | 64R78 | VariousDistrict 2 | Guardrail and fence repairs along State maintained route in District 2. | — | Executed | |||
| Jan 20, 2023 | 64R79 | VariousDistrict 2 | Roadside restoration of Right-of-Way turf damage caused by motorists along State maintained routes within District 2. | — | Executed | O'Brien Civil Works, Inc. $68,120 · | ||
| Jan 20, 2023 | 64S19 | VariousDistrict 2 | Bridge deck sealing of 10 structures in Lee County, 5 structures in Ogle County and 4 structures in Winnebago County. | — | Executed | All States Painting, Inc. $28,999 · | ||
| Jan 20, 2023 | 68H37 | VariousDistrict 4 | Tree removal at various locations within District 4. | — | Executed | Mosley Construction 1, LLC $93,770 · | ||
| Jan 20, 2023 | 70G33 | VariousDistrict 5 | 567.5 miles of spraying, approximately 2004 acres on state right-of-way along US 51 and interstate routes including interchanges in Champaign, Dewitt, Mclean, Piatt and Vermilion Counties. | — | Executed | The Daltons Inc. $133,427 · | ||
| Jan 20, 2023 | 72043 | VariousDistrict 6 | Bridge washing at various major river crossings on various routes in District 6. | — | Executed | All States Painting, Inc. $158,000 · | ||
| Jan 20, 2023 | 72073 | VariousDistrict 6 | Crack and joint sealing on various routes at various locations throughout District 6. | — | Executed | Complete Asphalt Service Co. $159,923 · | ||
| Jan 20, 2023 | 72N23 | VariousDistrict 6 | On call repair of guardrail and impact attenuators throughout District 6 as needed. | — | Executed | COLLINS & HERMANN, INC. $276,322 · | ||
| Jan 20, 2023 | 74B83 | VariousDistrict 7 | 47.3 miles of weed control on I-57 from the Marion County line to the Shelby County line and on I-70 from the Fayette County line to the Cumberland County line. | — | Executed | The Daltons Inc. $86,756 · | ||
| Jan 20, 2023 | 78980 | VariousDistrict 9 | Weed spraying for the control of Johnson Grass along I-57 at various locations. | — | Executed | The Daltons Inc. $116,248 · | ||
| Jan 20, 2023 | 78981 | VariousDistrict 9 | Weed spraying for the control of broadleaf weeds at various locations along I-24 and I-57. | — | Executed | Endrizzi Contracting, Inc $159,610 · | ||
| Mar 10, 2023 | 46611 | VariousDistrict 2 | Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order. | — | Executed | O'Brien Civil Works, Inc. $144,456 · | ||
| Mar 10, 2023 | 46612 | VariousDistrict 2 | Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | A. C. Pavement Striping Co. $1,999,000 · | ||
| Mar 10, 2023 | 46614 | VariousDistrict 6 | Removing and replacing damaged raised reflective pavement markers or lenses at various locations within District 6. | — | Executed | P & P Construction Co. $627,090 · | ||
| Mar 10, 2023 | 66N10 | VariousDistrict 3 | Weed spraying to aid in weed control This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. The work consists of weed spraying to aid in weed control. | — | Executed | Endrizzi Contracting, Inc $141,133 · | ||
| Mar 10, 2023 | 68H01 | VariousDistrict 4 | Removal and replacement of guardrail damaged by motorists throughout District 4. | — | Executed | |||
| Mar 10, 2023 | 68H02 | VariousDistrict 4 | District-wide pavement markings. | — | Executed | Varsity Striping & Construction Co. $386,166 · | ||
| Mar 10, 2023 | 68H30 | VariousDistrict 4 | Bridge Washing of 10 Bridges In District 4. | — | Executed | M & M Concrete, Inc. $808,750 · | ||
| Mar 10, 2023 | 68H59 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting and ITS facilities). | — | Executed | Laser Electric, Inc. $1,152,909 · | ||
| Mar 10, 2023 | 70G25 | VariousDistrict 5 | Bridge Deck Sealing 117 structures in Douglas(5O), Edgar(14) and Vermilion(53) Counties. | — | Executed | M & M Concrete, Inc. $163,336 · | ||
| Mar 10, 2023 | 70G44 | VariousDistrict 5 | District wide SMART Work Zone Technology. | — | Executed | Done Rite Construction Co., Inc. $419,500 · | ||
| Mar 10, 2023 | 72704 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $363,146 · | ||
| Mar 10, 2023 | 72705 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6. | — | Executed | Bodine Electric of Decatur $233,140 · | ||
| Mar 10, 2023 | 72M76 | VariousDistrict 6 | Bridge deck sealing on various routes in various counties of District 6. | — | Executed | M & M Concrete, Inc. $247,986 · | ||
| Mar 10, 2023 | 74B21 | VariousDistrict 7 | Sealing the bridge decks of 127 structures on various routes in various counties of District 7. | — | Executed | All States Painting, Inc. $147,989 · | ||
| Mar 10, 2023 | 76R88 | VariousDistrict 8 | Highway lighting and traffic signal repair and maintenance at various locations throughout District 8. | — | Executed | Electrico, Inc. $1,181,335 · | ||
| Apr 28, 2023 | 46607 | VariousDistrict 3 | Repairing various widths of pavement marking including lines, letters, numbers and symbols This project is located on various highways, freeways and expressways throughout District 3. This work consists of repairing various widths of pavement marking including lines, letters, numbers and symbols. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,285,750 · | ||
| Apr 28, 2023 | 46608 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors This project is located on various highways, freeways and expressways throughout District 3. This work consists of removing and replacing raised reflective pavement markers and reflectors. | — | Executed | Marking Specialists Corporation $648,137 · | ||
| Apr 28, 2023 | 46609 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors This project is located on various highways, freeways and expressways in the following counties in District 3. Livingston, Grundy, Kankakee, Iroquois, and Ford. This work consists of removing and replacing raised reflective pavement markers and reflectors. | — | Executed | P & P Construction Co. $275,059 · | ||
| Apr 28, 2023 | 46613 | VariousDistrict 2 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,215,175 · | ||
| Apr 28, 2023 | 62N86 | VariousDistrict 1 | Spot improvements at 4 (four) distinct locations. Includes: Drainage Improvements.: ditch grading and shaping/ regrading, culvert replacement, proposed V-shape gutters etc. 1) 175th St: Western Ave to Dixmoor Ave in the Village of Homewood, Cook County 2) Dixie Hwy: S. of Heather Rd to Birch Rd in the Village of Homewood, Cook Co. 3) IL 113: W. of West River Rd, Unincorporated Custer Township, Will County. 4) IL 53 at Joann Ln, Village of Woodridge, DuPage County. | — | Executed | D. Construction, Inc. $1,595,538 · | ||
| Apr 28, 2023 | 66N20 | VariousDistrict 3 | Repair and maintain Traffic signal, Flashing beacons and Roadway lighting in various counties in District 3. | — | Executed | Laser Electric, Inc. $2,104,115 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.