Filtered by: County: Tazewell Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 15, 2021 | 68F54 | TazewellDistrict 4 | Bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repa This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line. | — | Executed | Stark Excavating, Inc. $4,871,748 · | ||
| Jan 15, 2021 | 68F63 | MarshallMasonTazewellDistrict 4 | Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties. | — | Executed | Interstate Maintenance, Incorporated $239,996 · | ||
| Jan 15, 2021 | 89720 | TazewellDistrict 4 | Replace the bridge carrying CH 14 over Dry Creek, 2.3 miles east of Green Valley. | — | Executed | Illinois Civil Contractors, Inc. $559,587 · | ||
| Mar 5, 2021 | 68F69 | TazewellDistrict 4 | 0.89 mile, resurfacing of Main Street (IL 1 16/US 150) from North of 1-74 to South Highview Road in East Peoria, Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,449,784 · | ||
| Apr 23, 2021 | 68G21 | PeoriaTazewellDistrict 4 | Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. | — | Executed | Laser Electric, Inc. $482,887 · | ||
| Apr 23, 2021 | 68G23 | TazewellDistrict 4 | Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County. | — | Executed | Laser Electric, Inc. $122,483 · | ||
| Jun 11, 2021 | 68G25 | TazewellWoodfordDistrict 4 | Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills. | — | Executed | Kinney Contractors, Inc. $615,751 · | ||
| Jun 11, 2021 | 68G26 | TazewellDistrict 4 | Patching on US 24/US 150 from the East end of the McClugage Bridge to East of Hollands Grove Road in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $671,702 · | ||
| Jun 11, 2021 | 68G56 | TazewellDistrict 4 | Highway lighting improvements along WB I-74 between I-474 and I-155 and US 24/BUS 24 interchange near Washington in Tazewell County. | — | Executed | Bodine Electric of Decatur $218,685 · | ||
| Jun 11, 2021 | 89681 | TazewellDistrict 4 | Realignment, pavement reconstruction, culvert extensions, culverts and pavement markings on Allentown Road from 1000 feet east of Court Street and extending 1,000 feet into the city of Pekin. | — | Executed | Otto Baum Company, Inc. $617,543 · | ||
| Jun 11, 2021 | 89725 | TazewellDistrict 4 | Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington. | — | Rejected | Knapp Concrete Contractors, Inc. $388,163 · | ||
| Jul 30, 2021 | 89784 | TazewellDistrict 4 | Resurfacing on Parkway Drive from Lick Creek to Willow Street in Pekin. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,195,692 · | ||
| Nov 5, 2021 | 68G64 | TazewellDistrict 4 | Remove and replace existing high mast light tower, luminaires and concrete foundation on Riverfront Drive Spur, e ast of W ashinton Street in East Peoria. | — | Executed | Oberlander Electric Co. $127,380 · | ||
| Nov 5, 2021 | 89721 | TazewellDistrict 4 | Replace the bridge carrying Furrow Road over Lost Creek, one half mile east of Pekin. | — | Executed | Stark Excavating, Inc. $1,138,863 · | ||
| Nov 5, 2021 | 89727 | TazewellDistrict 4 | Resurfacing, HMA shoulders, concrete curb, drainage improvements and pavement markings on Broadway Road from Veterans Drive to Springfield Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,998,272 · |
1–15 of 15
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.