Filtered by: County: Macon Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 15, 2021 | 74549 | MaconShelbyDistrict 7 | 4.25 miles of designed overlay on US 51 from 0.5 miles north of the Shelby County line to the Christian County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,831,241 · | ||
| Jan 15, 2021 | 74757 | MaconDistrict 7 | 3.95 miles of rubblization and overlay including earthwork, sign panels, patching, pavement replacement at overhead structures, rest area ramp overlay, pavement marking, riprap, guardrail, pavement removal, concrete pavement, underdrains, culverts and drainage | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $27,728,894 · | ||
| Jan 15, 2021 | 95880 | MaconDistrict 7 | Resurfcing CH 24 (Reas Bridge Road from North Brush College Road to north of TR 250. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,027,537 · | ||
| Jan 15, 2021 | 95881 | MaconDistrict 7 | Replace the bridge carrying Strawn Road over Willow Branch, 3.25 miles northeast of Niantic. | — | Executed | County Contractors, Inc. $298,995 · | ||
| Mar 5, 2021 | 74544 | MaconDistrict 7 | Designed overlay, bridge repair and ramp repair on US 36 from I-72 to 0.2 miles west of Harristown Boulevard and on US 51 from I-72 to 0.3 miles south of Cantrell Road west of Decatur. (SN 058-0066 and 058-0067) | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,354,459 · | ||
| Mar 5, 2021 | 74947 | MaconMoultrieShelbyDistrict 7 | Sealing of 94 bridge decks on various routes in Macon, Moultrie and Shelby counties. | — | Executed | All States Painting, Inc. $144,850 · | ||
| Mar 5, 2021 | 95890 | MaconDistrict 7 | Replace the bridge carrying Center Street over Steven Creek and reconstruct the approach roadway. Project is located northwest of Hunt Street in Decatur. | — | Executed | Sangamo Construction Company $1,595,149 · | ||
| Mar 5, 2021 | 95892 | MaconDistrict 7 | Construction of the Stevens Creek Multi-Use Path from Cresthaven Park in Decatur to Timber Lane in Forsyth. | — | Executed | Kinney Contractors, Inc. $2,324,818 · | ||
| Apr 23, 2021 | 74994 | MaconDistrict 7 | Replacing expansion joints, bearing replacement, steel beam structure repair, curb repair, parapet repair, full deck pavement patching, scarification and bridge deck concrete overlay on SN 058-0020 on US 36 over Lake Decatur in Decatur. | — | Executed | Sangamo Construction Company $1,523,472 · | ||
| Apr 23, 2021 | 74A37 | MaconDistrict 7 | 0.6 miles of milling with inlay of surface course on IL 105 from east of IL 121 to 0.1 miles east of 26th Street. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $537,399 · | ||
| Apr 23, 2021 | 74A46 | MaconDistrict 7 | Milling and resurfacing at 3 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64; 3) US 51, 2 miles south of Maroa. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $237,284 · | ||
| Jun 11, 2021 | 74462 | MaconDistrict 7 | 0.7 miles of patching, milling, HMA resurfacing and longitudinal joint sealant on IL 121 from 0.1 miles south of Kile Street to the Garfield Avenue Underpass in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,166,105 · | ||
| Jun 11, 2021 | 74A52 | MaconShelbyDistrict 7 | 2.3 miles of chip seal at various locations in Macon and Shelby Counties. | — | Executed | Dunn Company $148,468 · | ||
| Jul 30, 2021 | 74A15 | MaconDistrict 7 | Signal modernization at the intersection of IL 105 and 24th Street in Decatur. | — | Executed | Laser Electric, Inc. $22,493 · | ||
| Nov 5, 2021 | 74996 | MaconDistrict 7 | Bridge deck overlay, bridge joint replacement/repair and bridge repair on the structure carrying North Wyckles Rd. Over I-72, 2 miles north of Harristown. | — | Executed | Freesen, a div of UCM, Inc. $709,055 · | ||
| Nov 5, 2021 | 74A73 | MaconDistrict 7 | 25 miles of weed spraying along I-72 in Macon County. | — | Executed | The Daltons Inc. $70,694 · |
1–16 of 16
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.