Filtered by: County: Lake Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 20, 2023 | 62A53 | LakeDistrict 1 | Dry Land Bridge reconstruction, roadway widening, resurfacing and ADA improvement for IL 132 (Grand Avenue) at (2,811-Ft) The proposed improvement consists of Dry Land Bridge reconstruction, roadway widening, resurfacing and ADA improvement for IL 132 (Grand Avenue) at East of Cedar Lake Road located in the Village of Lake Villa in Lake County. | — | Executed | Dunnet Bay Construction Company $8,715,212 · | ||
| Jan 20, 2023 | 62G26 | LakeDistrict 1 | (5.35-Mile) Design, Standard and Smart overlay resurfacing on IL Rte. 173 (Rosecrans Rd.) from Brown Ave. to Hunt Club Rd. in the Village of Antioch, Lake County. | — | Executed | Payne & Dolan, Inc. $3,296,603 · | ||
| Jan 20, 2023 | 62N69 | LakeDistrict 1 | (5.59-Mile) Smart overlay and ADA improvements, on IL 120 (0.2 Mile East of IL 60 0.1 Mile East of Alleghany Road) in the villages of Volo, Round Lake, Round Lake Park, Hainseville, Grayslake, and Mundelein in the townships of Avon, Grant, Wauconda, and Freemont in Lake County. | — | Executed | Peter Baker & Son Co. $2,492,285 · | ||
| Mar 10, 2023 | 61J06 | LakeDistrict 1 | HMA Resurfacing, PCC sidewalk with ADA improvements, patching, drainage improvements, and pavement markings along Deer Park Boulevard in Deer Park. | — | Executed | Geske and Sons, Inc. $576,911 · | ||
| Mar 10, 2023 | 61J15 | LakeDistrict 1 | HMA resurfacing and widening at the Lakeview Parkway and Hawthorn Parkway intersection and at the Lakeview Parkway and IL 60 intersection. Includes PCC path, ADA ramps, storm sewers, traffic signals and lighting modifications in Vernon Hills. | — | Executed | Alliance Contractors, Inc. $6,074,312 · | ||
| Mar 10, 2023 | 62M65 | CookLakeDistrict 1 | Location 1: (9,353-Ft) Designed overlay improvement on Barrington Rd in the villages of Inverness, Barrington, South Barrington and Barrington Hills in Cook County. Location 2: (366-Ft) Drainage improvement on Lake Cook Rd in the village of Deer Park. | — | Executed | Plote Construction, Inc. $1,750,124 · | ||
| Mar 10, 2023 | 62U66 | CookLakeDistrict 1 | Debris and litter cleaning along I-94/US-41 (Edens Expressway) from I-90 (Kennedy Expressway) to Clavey Road This contract consists of debris and litter cleaning along I-94/US-41 (Edens Expressway) from I-90 (Kennedy Expressway) to Clavey Road. | — | Executed | MYS, Incorporated $179,983 · | ||
| Apr 28, 2023 | 60N11 | LakeDistrict 1 | (1.86-Mile) Roadway reconstruction and realignment; building removal and site clearing; installation of a new traffic signal; drainage improvement; cul-de- sac both north and south legs of Ivanhoe Road (existing IL 83); new signage and pavement markings; and aesthetic landscaping to IL 83 from IL 120 to IL 137 and at Atkinson Road, located in Lake County, IL. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $15,926,091 · | ||
| Apr 28, 2023 | 62T98 | LakeDistrict 1 | Partial removal and replacement of culvert located on IL 60 at the Ditch (West of Peterson Road) in the Villag (172.9-Ft) The proposed improvement consists of partial removal and replacement of culvert located on IL 60 at the Ditch (West of Peterson Road) in the Village of Round Lake, Lake County. | — | Executed | Alliance Contractors, Inc. $378,118 · | ||
| Jun 16, 2023 | 46621 | LakeWillDistrict 1 | Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in Lake and Will Counties. | — | Executed | Precision Pavement Markings Inc. $1,816,500 · | ||
| Jun 16, 2023 | 46626 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed in various routes throughout Lake County. | — | Executed | Superior Road Striping, Inc. $1,279,775 · | ||
| Jun 16, 2023 | 62J41 | LakeDistrict 1 | Replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culv This project consists of replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culvert (SN 049-0700). Also included is the construction of a 7' PCC sidewalk on the east side and an 8' multi-use path on the west side of IL 137. In addition, light pole relocation, guardrail replacement, and watermain, sanitary sewer relocation and embankment stabilization. | — | Executed | Campanella and Sons, Inc. $7,886,157 · | ||
| Jun 16, 2023 | 62K05 | LakeDistrict 1 | The demolition of 3 (three) single family residences, 1 (one) shed, and culvert repair at various locations on This improvement consists of the demolition of 3 (three) single family residences, 1 (one) shed, and culvert repair at various locations on IL 22 between Quentin Rd and West of IL 83 in the Villages of Long Grove and Kildeer in Lake County, IL. | — | Executed | Martam Construction Incorporated $345,708 · | ||
| Jun 16, 2023 | 62U17 | LakeDistrict 1 | Bridge painting of the structures at IL 137 over 24th St (049-0163) in North Chicago, IL 137 over Washington S This improvement consists of bridge painting of the structures at IL 137 over 24th St (049-0163) in North Chicago, IL 137 over Washington St (049-0164) in Waukegan, and US 41 over Mill Creek (049-0028) in Wadsworth in Lake County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $598,044 · | ||
| Aug 4, 2023 | 61J64 | LakeDistrict 1 | HMA Resurfacing with Curb and Gutter, Sidewalk Repair, Drainage Adjustments, and Parkway Restoration algon Glen Flora Avenue from McAree Road to Lewis Avenue, and on Sheridan Road from Greenwood Avenue to Flora Avenue in Waukegan. | — | Executed | Peter Baker & Son Co. $1,253,279 · | ||
| Aug 4, 2023 | 62R18 | LakeDistrict 1 | (3,068-Ft) Intersection improvement with traffic signal modernization, dual left-turn lanes, pedestrian signals, drainage System, ADA improvements at the intersection IL 120 at O'Plaine Road in the City of Waukegan and Village of Gurnee, Lake County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,281,204 · | ||
| Aug 4, 2023 | 62T81 | LakeDistrict 1 | (2.17-Mile) Crack and Joint Sealing project is located on IL. 137, (Greenwood Ave.) It Begins at Genesse St and proceeds NE to Joe Favero Dr through the City of Waukegan, Lake County. | — | Executed | SKC Construction, Inc. $231,615 · | ||
| Sep 22, 2023 | 62T08 | LakeDistrict 1 | This is a Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying IL 60 (Townline Rd) over Des Plaines River. Located in the Villages of Vernon Hills and Mettawa in Lake County. The gross and net length is 0.39-miles (2,043-feet). | — | Executed | Martam Construction Incorporated $886,316 · | ||
| Sep 22, 2023 | 62T71 | LakeDistrict 1 | (3.35-Mile) SMART Overlay and ADA improvements, accessible pedestrian signal additions on IL 43 (Waukegan Rd), from South of IL 22 (Half Day Road) to Lake Cook Road, located in the Villages of Deerfield and Bannockburn in Lake County. | — | Executed | Peter Baker & Son Co. $3,787,665 · | ||
| Nov 17, 2023 | 62P09 | LakeDistrict 1 | Bridge deck replacement of the structures carrying IL 120 over Des Plaines River The proposed improvement consists of bridge deck replacement of the structures carrying IL 120 over Des Plaines River. Also includes bridge overlay and substructure repairs of the structures carrying Belvidere Road Tributary over IL 120 and IL 120 NW ramp at IL 21. It also includes minor substructure repair and riprap placement at IL 21 over Belvidere Road tributary. The project is in the Village of Gurnee in Lake County. Total gross length and net length 1033 (0.2 Mile) and 625 Feet (0.12 Mile) | — | Executed | Dunnet Bay Construction Company $5,544,296 · |
1–20 of 20
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.