Filtered by: County: Knox Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 89664 | KnoxDistrict 4 | Roadway reconstruction on FAS 393(CH4) from CH 15 to IL 17. | — | Executed | Halverson Construction Co., Inc. $4,167,747 · | ||
| Jan 19, 2018 | 89699 | KnoxDistrict 4 | Rehabilitate the bridge carrying Farnham Street over the BNSF Railroad, 0.3 mile north of East Main Street in Galesburg. | — | Executed | Sangamo Construction Company $2,191,737 · | ||
| Mar 9, 2018 | 68339 | KnoxWarrenDistrict 4 | 7.52 miles of resurfacing and bridge rehabilitation on US 34/IL 110 from west of Cameron Road to IL Route 164. | — | Executed | Gunther Construction, a div of UCM, Inc. $13,135,975 · | ||
| Apr 27, 2018 | 89733 | KnoxDistrict 4 | Traffic Signal modernization at nine intersections in the City of Galesburg. | — | Executed | Oberlander Electric Co. $468,309 · | ||
| Jun 15, 2018 | 68B59 | KnoxPeoriaDistrict 4 | Guardrail removal and culvert extensions at various locations on IL 8 and US 150, culvert replacement at Location 18 on US 150. | — | Executed | Illinois Civil Contractors, Inc. $1,589,198 · | ||
| Aug 3, 2018 | 68E46 | KnoxDistrict 4 | Replace pedestrian walkway lighting and lighting fixtures at I-74 Spoon River Rest Areas in Knox County. | — | Executed | Laser Electric, Inc. $81,493 · | ||
| Jan 18, 2019 | 68E74 | KnoxDistrict 4 | Structural steel repairs to beams on SN 048-0065 carrying Farnham Street over US 34. | — | Executed | Halverson Construction Co., Inc. $147,930 · | ||
| Mar 8, 2019 | 68D10 | KnoxDistrict 4 | Replacement of a single box culvert with a double (SN-048-2008), HMA pavement, guardrail replacement, earthwork, and other collateral work necessary, located 0.6 mile west of IL-180 near Victoria. | — | Executed | Kinney Contractors, Inc. $979,988 · | ||
| Apr 26, 2019 | 89474 | KnoxDistrict 4 | Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona. | — | Executed | County Contractors, Inc. $699,269 · | ||
| Jun 14, 2019 | 68F03 | HenryKnoxDistrict 4 | REMOVAL OF EXISTING HPS LUMINAIRES AND INSTALLATION OF LED LUMINAIRES ON EXISTING LIGHT POLES ALONG I-74 AT VARIOUS LOCATIONS. | — | Executed | Laser Electric, Inc. $69,997 · | ||
| Sep 20, 2019 | 68758 | KnoxDistrict 4 | Replacement of structure carrying IL 78 over kickapoo creek and replacement of a box culvert. | — | Executed | Otto Baum Company, Inc. $2,245,718 · | ||
| Sep 20, 2019 | 68C65 | KnoxDistrict 4 | CULVERT REPLACEMENTS ON IL 167 0.1 MI SE OF US 34/IL 167, AND 1.3 MI W OF TR 146. | — | Executed | Valley Construction Co. $1,513,546 · | ||
| Mar 6, 2020 | 68656 | KnoxDistrict 4 | Resurfacing on I-74 from 0.3 miles N of US Rte 34 to 0.4 miles N of Main St in Galesburg. | — | Executed | Gunther Construction, a div of UCM, Inc. $8,250,984 · | ||
| Apr 24, 2020 | 68D41 | KnoxDistrict 4 | Replacement of both structures carrying I-74 over French Creek, Class B patching, variable depth milling, placement of HMA, HMA shoulders, and placement of pavement markings in Knox County. | — | Executed | Stark Excavating, Inc. $4,105,900 · | ||
| Jun 12, 2020 | 68F53 | KnoxDistrict 4 | Beam straightening and strengthening on SN 048-0022 carrying US 34/IL 110 over US 150. | — | Executed | Halverson Construction Co., Inc. $49,336 · | ||
| Jun 12, 2020 | 89738 | KnoxDistrict 4 | Reconstruct South Seminary Street from East Berrien Street to Fifth Steet in Galesburg. | — | Executed | Brandt Construction Co. $3,385,000 · | ||
| Jul 31, 2020 | 68E18 | KnoxDistrict 4 | Culvert repair to culvert east side of IL Rte 41, approximately 0.57 mi S of IL 116 in Knox County. | — | Executed | Brandt Construction Co. $199,999 · | ||
| Jan 15, 2021 | 68F99 | KnoxDistrict 4 | Replace two steel girders on Bridge S.N. 048-0065 carrying Farnham Street over US Route 34, just west of the 1-74 interchange in Galesburg for a total length of 0.11 mile. | — | Executed | White Construction LLC $206,222 · | ||
| Mar 5, 2021 | 89475 | KnoxDistrict 4 | Replace the bridge carrying CH 8 over Brush Creek, 5 miles east of Abingdon. | — | Executed | Curnyn Construction Co. $1,168,725 · | ||
| Jun 11, 2021 | 68G55 | KnoxDistrict 4 | 1.2 miles of patching on US 150 (Henderson Street) from Home Boulevard to West North Street in Galesburg in Knox County. | — | Executed | G. M. Sipes Construction, Inc. $72,146 · | ||
| Jul 30, 2021 | 89791 | KnoxDistrict 4 | Resurfacing, patching and ADA ramps on Henderson Road from the County Fairground entrance to Poplar Street in Knoxville. | — | Executed | Gunther Construction, a div of UCM, Inc. $275,374 · | ||
| Jan 21, 2022 | 68755 | KnoxDistrict 4 | Replace bridge 048-0017 carrying IL 8 over Hickory Creek, 0.7 mile east of IL 97. | — | Executed | Stark Excavating, Inc. $1,526,949 · | ||
| Mar 11, 2022 | 68F73 | KnoxDistrict 4 | Bridge deck overlay, bridge joint replace//repair, bridge repair to SN 048-0009 and -0010 carrying over East Main Street in Galesburg. | — | Executed | Brandt Construction Co. $1,167,000 · | ||
| Apr 29, 2022 | 68G77 | KnoxWoodfordDistrict 4 | Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. | — | Executed | Laser Electric, Inc. $179,815 · | ||
| Apr 29, 2022 | 89819 | KnoxDistrict 4 | Rehabilitate the structure carrying CH 10 over the BNSF Rail Yard located east of Henderson Street in Galesburg. | — | Executed | Brandt Construction Co. $5,031,097 · | ||
| Jun 17, 2022 | 68G92 | KnoxDistrict 4 | 1.90 miles of HMA patching at the I-74 interchange from CR 1925 N. | — | Executed | Gunther Construction, a div of UCM, Inc. $208,605 · | ||
| Jun 17, 2022 | 68G94 | KnoxDistrict 4 | 1.15 miles of Class B Patching from Swing Blvd to Main Street in Galesburg, IL. | — | Executed | G. M. Sipes Construction, Inc. $169,342 · | ||
| Jun 17, 2022 | 68G95 | KnoxDistrict 4 | 9.62 miles of PCC Patching from US 150/IL 97 Interchange to the Spoon River Rest Area. | — | Executed | G. M. Sipes Construction, Inc. $289,794 · | ||
| Jun 17, 2022 | 68G96 | KnoxDistrict 4 | 0.87 miles of HMA Patching from US 150/IL 97 Interchange with I-74 to CH 17/CR 1290N. | — | Executed | Gunther Construction, a div of UCM, Inc. $165,743 · | ||
| Jun 17, 2022 | 68G97 | KnoxDistrict 4 | 1.34 miles of HMA Patching from Allens Ave to Michigan Ave in Galesburg, IL. | — | Executed | Brandt Construction Co. $496,110 · | ||
| Jun 17, 2022 | 68G98 | KnoxDistrict 4 | 2.45 miles of PCC Patching from I-74/US 34 Interchange to US 150/US 34 Interchange. | — | Executed | G. M. Sipes Construction, Inc. $193,563 · | ||
| Sep 23, 2022 | 68H08 | KnoxDistrict 4 | Mill and resurface parking lot at the Knoxville Storage Yard, South of I-74 (exit 51) on CH 9 (1393 Knox Hwy). | — | Executed | Illinois Civil Contractors, Inc. $436,864 · | ||
| Jan 20, 2023 | 68G91 | KnoxDistrict 4 | Bridge Preservation on S.N. 048-0080 over Spoon River, S .N. 048-0085 and S.N. 048-0086 over Cadwell Creek (2 locations) and S .N. 048-0089 over Branch of Brandywine creek. | — | Executed | Path Construction Company, Inc. $1,898,891 · | ||
| Jun 16, 2023 | 68F89 | HenryKnoxDistrict 4 | Resurfacing on I-74/IL 110 from North of Woodhull to North of US 34. | — | Executed | Gunther Construction & Advanced Asphalt Company JV $28,792,543 · | ||
| Jun 16, 2023 | 68H62 | KnoxDistrict 4 | HMA patching on IL 167 from Knox Road 2000 East to IL 180 in Knox County. | — | Executed | Gunther Construction, a div of UCM, Inc. $118,583 · | ||
| Jun 16, 2023 | 68H65 | KnoxDistrict 4 | HMA patching on Main Street in East Galesburg from 1-74 to CH 9 in Knox County. | — | Executed | Gunther Construction, a div of UCM, Inc. $152,618 · | ||
| Jun 16, 2023 | 68H69 | KnoxDistrict 4 | 12.6 miles, HMA edgeline repairs. | — | Executed | Gunther Construction, a div of UCM, Inc. $252,522 · | ||
| Sep 22, 2023 | 68G66 | KnoxDistrict 4 | Repairs 2 box culverts (headwalls, wingwalls, guardrail) 0.49 mi. E of Warren Co. Line and 0.15 mi. E of 325th St. | — | Executed | Otto Baum Company, Inc. $964,700 · | ||
| Jan 19, 2024 | 68D48 | KnoxPeoriaDistrict 4 | New bridge deck on SN 072-0032 carrying IL 78 over I-74, 4.5 miles west of Brimfield, deck replacement and miscellaneous repairs to SN 048-0035 carrying CH 18 over I-74, 3 miles east of Spoon River. | — | Executed | Stark Excavating, Inc. $4,407,159 · | ||
| Jan 19, 2024 | 68D83 | KnoxDistrict 4 | Bridge Preservation to Structure Nos. 048-0007 and 048-0008 carrying 1-74 over the BNSF RR in Galesburg. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,637,099 · | ||
| Mar 8, 2024 | 68J00 | KnoxStarkDistrict 4 | 11 miles of cape seal on Il 41 from Monmouth Blvd. in Galesburg to Hunter St. in Abingdon in Knox County and on Il 78 from the Henry County Line to IL 17 (WB) in Stark County. | — | Executed | Beniach Construction Co., Inc. $1,746,017 · | ||
| Apr 26, 2024 | 68H86 | KnoxPeoriaDistrict 4 | Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties. | — | Executed | Stark Excavating, Inc. $834,893 · | ||
| Apr 26, 2024 | 89827 | KnoxDistrict 4 | HMA resurfacing with ADA improvements, drainage improvements and pavement markings on West Carl Sandburg Drive from Henderson Street to Broad Street in Galesburg. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,097,188 · | ||
| Jun 14, 2024 | 68E35 | KnoxDistrict 4 | Superstructure replacement of SN 048-0051 and 048-0052 carrying I-74 over the Spoon River and TR 238A 0.2 mile west of the Spoon River rest area. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $14,446,748 · | ||
| Jun 14, 2024 | 89845 | KnoxDistrict 4 | PCC sidewalk with ADA Ramps and drainage improvements at various locations in Galesburg. | — | Executed | Centennial Contractors of the Quad Cities, Inc. $407,609 · | ||
| Mar 7, 2025 | 68E50 | KnoxDistrict 4 | Widening and resurfacing, culvert replacements, culvert repairs, drainage improvements, and guardrail upgrades on IL 180 from IL 167 to US 150 in Knox County. Approximately 10.48 miles. | — | Executed | Gunther Construction, a div of UCM, Inc. $29,190,217 · | ||
| Jun 13, 2025 | 89806 | KnoxDistrict 4 | Cold-in-place recycling and HMA surfacing on CH 25 and CH 26 from the south corporate limits of Galesburg to CH 26. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,710,475 · | ||
| Jun 13, 2025 | 89866 | KnoxDistrict 4 | Construction of PCC Sidewalk with ADA Ramps along East Fifer Street from Willard Street to Morton Avenue in Galesburg. | — | Executed | Illinois Civil Contractors, Inc. $302,246 · | ||
| Jan 16, 2026 | 89834 | KnoxDistrict 4 | Construct an 8' wide HMA shared-use path along the north side of South Lake Stoney Road to Woodblock Road in Galesburg. Includes; box culvert extensions, pipe culverts, aggregate shoulders, and sidewalk. | — | Executed | Phoenix Corporation of the Quad Cities $1,916,536 · | ||
| Apr 24, 2026 | 68K23 | KnoxDistrict 4 | 5.84 miles of 3P resurfacing on US 34 in Knox County from 0.4 mile west of Interstate 74 to Knox Road 900E. | — | Executed | Gunther Construction, a div of UCM, Inc. $11,296,811 · | ||
| Jun 12, 2026 | 68J61 | KnoxDistrict 4 | 6.17 miles patching and resurfacing of I-74 from 0.3 miles west of E Main Street in Galesburg to east of the IL 97 interchange; 0.40 miles of patching and resurfacing of E Main Street from 0.2 miles east of Michigan Avenue to_0.1 mile east of Soangetaha Road; and 1.19 miles of patching and resurfacing of US 150/IL 97 from 0.2 miles_east of I-74 westbound ramps to 0.1 miles west of Junction IL 97 south on IL 97. | — | Rejected | |||
| Jul 31, 2026 | 68L03 | FultonKnoxDistrict 4 | HMA patching on IL 97 from Littlers Creek to IL 116. Approximately 2.92 miles gross length. | — | Executed | Brandt Construction Co. $630,038 · |
1–52 of 52
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.