Filtered by: County: Jackson Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 10, 2023 | 78905 | JacksonPerryDistrict 9 | Intersection widening and resurfacing at 3 locations: IL 154 at Water Street in Pinckneyville, IL 127/149 at North 4th Street in Murphysboro and IL 13/127/149 at North Street in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $373,373 · | ||
| Apr 28, 2023 | 46925 | JacksonDistrict 9 | Bituminous surface treatment on existing roads and parking lots in Burning Star State Fish and Wildlife Area. | — | Executed | DMS Contracting, Inc. $1,851,558 · | ||
| Apr 28, 2023 | 78939 | JacksonJohnsonDistrict 9 | Bridge deck overlay on SN 044-0012 carrying IL 37 over an abandoned railroad, 0.2 miles south of Cypress and bridge deck overlay on SN 039-0057 carrying IL 149 over Little Muddy River, 2 miles east of Desoto. | — | Executed | E. T. Simonds Construction Company $866,504 · | ||
| Jun 16, 2023 | 78790 | JacksonDistrict 9 | Replacement of 3 culverts on IL 3: SN 039-2013(E) over a stream 1.8 miles east of the Randolph County line; SN 039-2014(E) over a drainage ditch 0.1 miles southeast of Raddle Road; SN 039-2015(E) over Talbott Hollow Creek 1.1 miles northwest of IL 151. | — | Executed | E. T. Simonds Construction Company $2,188,576 · | ||
| Jun 16, 2023 | 99683 | JacksonDistrict 9 | Construct an offset right turn lane and install traffic signal equipment at the intersection of Giant City Road and East Pleasant Hill Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $733,609 · | ||
| Aug 4, 2023 | 78A11 | JacksonDistrict 9 | Installation of median crossovers for the eastbound lanes of IL 13 at SN 039-0075 carrying IL 13 over the Big Muddy River, east of Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $151,672 · | ||
| Sep 22, 2023 | 99709 | JacksonDistrict 9 | HMA resurfacing and shoulders on Royalton Road from US 51 to the Franklin County Line. | — | Executed | Samron Midwest Contracting, Inc. $1,048,899 · | ||
| Nov 17, 2023 | 78929 | JacksonDistrict 9 | 0.75 miles of resurfacing on North 6th Street in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $339,339 · | ||
| Nov 17, 2023 | 78A02 | AlexanderJacksonUnionDistrict 9 | 25.4 miles of patching, milling, resurfacing and shoulders on IL 3 from Howardton Road, near Grand Tower, to the Cape T intersection. | — | Executed | E. T. Simonds Construction Company $11,663,246 · | ||
| Nov 17, 2023 | 99711 | JacksonDistrict 9 | Resurfacing North Marion Street from East Fischer Street to Dillinger Road. | — | Executed | E. T. Simonds Construction Company $658,507 · | ||
| Nov 17, 2023 | 99713 | JacksonDistrict 9 | Replace existing structure with a precast concrete box culvert with pre-cast box culvert end sections, PCC pavement, sidewalk, curb and gutter, on East College Street over Piles Fork Creek in Carbondale. | — | Executed | E. T. Simonds Construction Company $553,288 · |
1–11 of 11
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.