IDOT Jobs

2021 · 31 jobs · — Sign up free
★ My Jobs

Filtered by: County: Henry Clear all

31 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 15, 2021 62K93 LakeMcHenryDistrict 1 ADA improvement project along various State maintained routes. Located in the City of Zion and Villages of Richmond, Winthrop Harbor, Fox Lake, Lake Villa and Grayslake. — Executed Nov 26 New Triggi Construction, Inc. $414,718 ·
Jan 15, 2021 62L38 LakeMcHenryDistrict 1 ADA improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will, Southern Lake and McHenry Counties. Located in the City of Crystal Lake and Villages of Barrington and Wauconda. — Executed Nov 26 New Triggi Construction, Inc. $315,664 ·
Jan 15, 2021 62M91 LakeMcHenryDistrict 1 Cleaning and painting existing steel structures at 5 locations. 1st location, US 12 over Pistakee Lake (SN 049-0019). 2nd location, IL 43 over IL 120 (SN 049-0111). 3rd location, Metra RR over Person Rd. (SN 049-0127). 4th location, US 12 over Nippersink Lake (SN 049-0167). 5th location, US 14 over UP RR and McComb St. (SN 056-0007). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $949,114 ·
Jan 15, 2021 64G94 HenryDistrict 2 HMA Resurfacing on IL 81 from US 150 to 0.4 mile West of I-74. — Executed Nov 26 New Advanced Asphalt Company $931,757 ·
Jan 15, 2021 64P51 HenryDistrict 2 Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0137) carrying IL 82 over the north branch of the Edwards River, located 2 miles South of IL 81. — Executed Nov 26 New General Constructors Inc. of the Quad Cities $601,848 ·
Jan 15, 2021 64P52 HenryDistrict 2 Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0141) carrying US 6 over the BN RR and Township Road 38 (TR 38), located 3 miles East of the Rock Island County line. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $853,036 ·
Jan 15, 2021 64P56 HenryDistrict 2 Concrete sealer applied to bridge decks at various locations. — Executed Nov 26 New All States Painting, Inc. $45,900 ·
Mar 5, 2021 61G60 McHenryDistrict 1 Construction of bicycle facilities, pavement reconstruction, traffic signal improvements, roadway lighting, streetscape items, construction of a roundabout, and pavement markings. Improvement begins on Harrison Street at the McHenry County Conservation District Prairie Trail and extends north to Park Street, westerly to Riverview Drive, south to Main Street, then north to the existing multi-use path at IL 31 in Algonquin. — Executed Nov 26 New Martam Construction Incorporated $6,342,937 ·
Mar 5, 2021 61G93 McHenryDistrict 1 Construction of a bike path from east of Illinois Route 31 into the park, in the Village of Cary. — Executed Nov 26 New Campanella and Sons, Inc. $800,037 ·
Mar 5, 2021 62L53 McHenryDistrict 1 (1.1-Mile) SMART resurfacing and ADA improvements on US 12 (Main Street) from Wisconsin Street to IL 173 (Kenosha Street) in the Village of Richmond. — Executed Nov 26 New J. A. Johnson Paving Company $493,301 ·
Mar 5, 2021 64P78 HenryDistrict 2 Pavement patching on 1-74/280 from 0.5 mile west to 0.5 mile east of Mosquito Creek. — Executed Nov 26 New G. M. Sipes Construction, Inc. $115,525 ·
Mar 5, 2021 64P79 HenryDistrict 2 Pavement patching on 1-74 from the 1-74/1-80/1-280 Interchange to IL 81. — Rejected Nov 26 New G. M. Sipes Construction, Inc. $338,688 ·
Apr 23, 2021 61G94 McHenryDistrict 1 Remove existing box culvert, construct single-span CIP slab bridge, and reconstruct approach pavement on Kishwaukee Valley Road over a tributary of Rush Creek, 0.2 miles east of Root Road. — Executed Nov 26 New Lorig Construction Company $1,545,703 ·
Apr 23, 2021 61H03 McHenryDistrict 1 Resurfacing Haligus Road from north of Ballard Road to Lakewood Road in Lakewood. — Executed Nov 26 New Geske and Sons, Inc. $510,590 ·
Apr 23, 2021 61H04 McHenryDistrict 1 Resurfacing Valley View Road from Nish Road to south of IL 176 in Prairie Grove — Executed Nov 26 New Geske and Sons, Inc. $367,518 ·
Apr 23, 2021 64J97 HenryDistrict 2 6.27 MILES, Resurfacing from Galva - Atkinson Road to West Street in Kewanee. — Executed Nov 26 New Advanced Asphalt Company $2,403,550 ·
Apr 23, 2021 64P69 HenryDistrict 2 Cleaning and painting structural steel on SN's 037-0029 and 037-0030 carrying 1-80 over Mineral Creek located 0.7 mile North of US 6, and SN 037-0079 carrying US 6 over 1-80. — Executed Nov 26 New Three Star Painting, Inc. $396,650 ·
Apr 23, 2021 64P70 HenryDistrict 2 Cleaning and painting structural steel on SN 037-0112 carrying TR 196-D over 1-80 located 0.9 mile southeast of IL 82, SN 037-0113 carrying TR 216 over 1-80 located 2.0 miles southeast of IL 82 and SN 037-0118 carrying TR 468 over 1-80 located 1.5 miles east of IL 78. — Executed Nov 26 New Three Star Painting, Inc. $595,000 ·
Jun 11, 2021 46571 McHenryDistrict 1 Removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, an This work shall consist of removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limit shown. — Executed Nov 26 New Superior Road Striping, Inc. $282,443 ·
Jun 11, 2021 46574 DuPageMcHenryDistrict 1 Applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $423,000 ·
Jun 11, 2021 60T15 McHenryDistrict 1 Intersection Improvement (channelization, traffic signal installation). Includes left and right turn lanes, re-alignment of Wright Rd, re-alignment of leg of Nish Rd and building demolition. Location: Intersection of IL 176 and Nish Road in unincorporated Nunda Township in McHenry County. — Executed Nov 26 New Campanella and Sons, Inc. $2,737,521 ·
Jun 11, 2021 62L65 McHenryDistrict 1 Smart Overlay, Class D patching. This improvement of IL 47 begins 800 ft north of Ware Rd. and proceeds approximately 47350.5 ft (8.96 miles) in a northerly direction to IL Rte. 173 in the Village of Hebron and Township of Greenwood and Hebron. — Executed Nov 26 New Peter Baker & Son Co. $2,128,510 ·
Jun 11, 2021 62N90 CookMcHenryDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR; 2) US 14 (Northwest Hwy) over Fox River; 3) IL62 (Algonquin Rd) over Fox River in the Villages of Hoffman Estates, Fox River Grove and Algonquin in Barrington and Algonquin Townships. — Executed Nov 26 New Capital Industrial Services $683,300 ·
Jun 11, 2021 64P75 HenryDistrict 2 Cleaning and painting structural steel on SN-s 037-0013 and 037-0014 carrying I-74 over Edwards River. — Executed Nov 26 New All States Painting, Inc. $159,130 ·
Sep 17, 2021 61H21 McHenryDistrict 1 Resurfacing Reed Road from the west village limits to Lakewood Road in the Village of Lake in the Hills. — Executed Nov 26 New Plote Construction, Inc. $125,400 ·
Sep 17, 2021 62G35 McHenryDistrict 1 (7.74-Mile) Pavement widening and resurfacing to provide left turn lanes at 8 intersections, replacement of 3 culverts, 5 culverts repair, widening 5 culverts to accommodate proposed intersections, guardrails, regrading, shoulder improvements and rumblestrips along IL 176 from Deerpass Rd -Dean St in the City of Marengo. — Executed Nov 26 New William Charles Construction Company, LLC $8,277,010 ·
Sep 17, 2021 62P26 McHenryDistrict 1 (16.3-Mile) Pavement surface patching (2-in mill and fill / intermittent resurfacing) improvement. Includes affected PMKs restoration. Location: IL 173 (Maple Ave) from Alden Rd to Lake Co Line in the Villages Alden Hebron and Richmond in McHenry County. — Executed Nov 26 New Payne & Dolan, Inc. $597,319 ·
Nov 5, 2021 61H27 McHenryDistrict 1 Pavement widening and construction, curb and gutter, sidewalks, lighting, traffic signals, storm sewer and water main improvements on Main Street from IL 176 to the UP Railroad tracks, and on IL 176 from 2nd Street to Illinois Street in Crystal Lake. — Executed Nov 26 New Pir Tano Construction Company, Inc. $4,564,372 ·
Nov 5, 2021 62N46 McHenryDistrict 1 (1.11-mile) ultra-thin bonded wearing course along US 14 from Crowley Road to Oak Grove Road. Located in the City of Harvard and unincorporated McHenry Co. — Executed Nov 26 New Peter Baker & Son Co. $322,358 ·
Nov 5, 2021 64L12 HenryRock IslandDistrict 2 Sidewalk Ramps for the disabled along various routes in the villages of Alpha, Andover, Osco, Woodhull, Andalusia, Coal Valley, and Edgington. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $1,206,546 ·
Nov 5, 2021 64R00 HenryRock IslandDistrict 2 Washing five bridges over the Rock River, in Henry and Rock Island Counties. — Executed Nov 26 New All States Painting, Inc. $62,000 ·
1–31 of 31

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.