| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 18, 2019 | 66J42 | FordDistrict 3 | removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery. | — | Executed | Scanlon Excavating & Concrete, Inc. $36,875 · | ||
| Jan 18, 2019 | 68D79 | WoodfordDistrict 4 | Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059. | — | Executed | Rowe Construction, a div of UCM, Inc. $13,273,213 · | ||
| Mar 8, 2019 | 68E28 | WoodfordDistrict 4 | Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. | — | Executed | Advanced Asphalt Company $1,373,783 · | ||
| Apr 26, 2019 | 74886 | CrawfordDistrict 7 | Culvert extension on IL 1 at Duncanville Road, 3.6 miles south of IL 33. | — | Executed | Phoenix Corporation of the Quad Cities $181,499 · | ||
| Jun 14, 2019 | 66A03 | FordDistrict 3 | 3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL. | — | Executed | Iroquois Paving Corporation $893,506 · | ||
| Jun 14, 2019 | 66K02 | FordDistrict 3 | Class B pavement patching on IL 54 from the Champaign County line to Church Street in Gibson City. | — | Executed | G. M. Sipes Construction, Inc. $285,429 · | ||
| Jun 14, 2019 | 66K03 | FordDistrict 3 | Class B pavement patching on IL 54 from Church Street in Gibson City to East Main Street in Melvin. | — | Executed | G. M. Sipes Construction, Inc. $517,414 · | ||
| Jun 14, 2019 | 66K04 | FordDistrict 3 | Class B pavement patching on IL 54 from East Main Street in Melvin to the Iroquois County line. | — | Executed | G. M. Sipes Construction, Inc. $457,550 · | ||
| Jun 14, 2019 | 68E83 | WoodfordDistrict 4 | REMOVAL OF EXISTING HIGH MAST LIGHTING SYSTEM AND INSTALLATION OF NEW LIGHT POLES, FOUNDATION, LUMINAIRES, ELECTRICAL CABLE, LIGHTING CONTROLLER, AND SERVICE INSTALLATION AT THE INTERCHANGE OF I-39 AND US 24 IN EL PASO. | — | Executed | Bodine Electric of Decatur $281,004 · | ||
| Jun 14, 2019 | 68E95 | MarshallWoodfordDistrict 4 | 22 MILES OF CLASS A PAVEMENT PATCHING ON INTERSTATE 39 FROM 0.25 MILES N OF US RTE 24 TO 2.1 MILES S OF IL RTE 17. | — | Executed | Beniach Construction Co., Inc. $653,392 · | ||
| Jun 14, 2019 | 95848 | CrawfordDistrict 7 | Replace the bridge carrying TR 54 over Dogwood Creek, 0.5 miles southeast of Oblong. | — | Executed | Allendale Gravel Co., Inc. $259,455 · | ||
| Jun 14, 2019 | 95853 | CrawfordDistrict 7 | Resurfacing and lime modified soil and aggregate base on various routes from the Jasper County line to North 700th Street in Annapolis. | — | Executed | Ambraw Asphalt Materials, Inc. $3,003,011 · | ||
| Jul 12, 2019 | 66A81 | FordDistrict 3 | 6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line. | — | Executed | Iroquois Paving Corporation $2,795,668 · | ||
| Jul 12, 2019 | 68C97 | TazewellWoodfordDistrict 4 | Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 · | ||
| Aug 2, 2019 | 66J58 | FordDistrict 3 | Removal and replacement of an 18" diameter pipe culvert south of the railroad tracks in Roberts and a and a 2' x 1.5'concrete box culvert on the north side of the 1300N Rd intersection with IL 115. | — | Executed | G. M. Sipes Construction, Inc. $131,005 · | ||
| Aug 2, 2019 | 66K05 | FordDistrict 3 | 3.4 miles of milling, resurfacting and intermittent patching on US 45 from Dawn Avenue in Paxton to the Champaign County line. | — | Executed | Iroquois Paving Corporation $1,379,136 · | ||
| Nov 8, 2019 | 66F60 | FordDistrict 3 | Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. | — | Executed | Tobey's Construction & Cartage, Inc. $432,193 · | ||
| Nov 8, 2019 | 66K27 | FordDistrict 3 | Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. | — | Executed | Iroquois Paving Corporation $841,960 · | ||
| Nov 8, 2019 | 68B62 | WoodfordDistrict 4 | Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 · |
1–19 of 19
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.