IDOT Jobs

2019 · 19 jobs · — Sign up free
★ My Jobs

Filtered by: County: Ford Clear all

19 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 18, 2019 66J42 FordDistrict 3 removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $36,875 ·
Jan 18, 2019 68D79 WoodfordDistrict 4 Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $13,273,213 ·
Mar 8, 2019 68E28 WoodfordDistrict 4 Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. — Executed Nov 26 New Advanced Asphalt Company $1,373,783 ·
Apr 26, 2019 74886 CrawfordDistrict 7 Culvert extension on IL 1 at Duncanville Road, 3.6 miles south of IL 33. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $181,499 ·
Jun 14, 2019 66A03 FordDistrict 3 3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL. — Executed Nov 26 New Iroquois Paving Corporation $893,506 ·
Jun 14, 2019 66K02 FordDistrict 3 Class B pavement patching on IL 54 from the Champaign County line to Church Street in Gibson City. — Executed Nov 26 New G. M. Sipes Construction, Inc. $285,429 ·
Jun 14, 2019 66K03 FordDistrict 3 Class B pavement patching on IL 54 from Church Street in Gibson City to East Main Street in Melvin. — Executed Nov 26 New G. M. Sipes Construction, Inc. $517,414 ·
Jun 14, 2019 66K04 FordDistrict 3 Class B pavement patching on IL 54 from East Main Street in Melvin to the Iroquois County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $457,550 ·
Jun 14, 2019 68E83 WoodfordDistrict 4 REMOVAL OF EXISTING HIGH MAST LIGHTING SYSTEM AND INSTALLATION OF NEW LIGHT POLES, FOUNDATION, LUMINAIRES, ELECTRICAL CABLE, LIGHTING CONTROLLER, AND SERVICE INSTALLATION AT THE INTERCHANGE OF I-39 AND US 24 IN EL PASO. — Executed Nov 26 New Bodine Electric of Decatur $281,004 ·
Jun 14, 2019 68E95 MarshallWoodfordDistrict 4 22 MILES OF CLASS A PAVEMENT PATCHING ON INTERSTATE 39 FROM 0.25 MILES N OF US RTE 24 TO 2.1 MILES S OF IL RTE 17. — Executed Nov 26 New Beniach Construction Co., Inc. $653,392 ·
Jun 14, 2019 95848 CrawfordDistrict 7 Replace the bridge carrying TR 54 over Dogwood Creek, 0.5 miles southeast of Oblong. — Executed Nov 26 New Allendale Gravel Co., Inc. $259,455 ·
Jun 14, 2019 95853 CrawfordDistrict 7 Resurfacing and lime modified soil and aggregate base on various routes from the Jasper County line to North 700th Street in Annapolis. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $3,003,011 ·
Jul 12, 2019 66A81 FordDistrict 3 6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line. — Executed Nov 26 New Iroquois Paving Corporation $2,795,668 ·
Jul 12, 2019 68C97 TazewellWoodfordDistrict 4 Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 ·
Aug 2, 2019 66J58 FordDistrict 3 Removal and replacement of an 18" diameter pipe culvert south of the railroad tracks in Roberts and a and a 2' x 1.5'concrete box culvert on the north side of the 1300N Rd intersection with IL 115. — Executed Nov 26 New G. M. Sipes Construction, Inc. $131,005 ·
Aug 2, 2019 66K05 FordDistrict 3 3.4 miles of milling, resurfacting and intermittent patching on US 45 from Dawn Avenue in Paxton to the Champaign County line. — Executed Nov 26 New Iroquois Paving Corporation $1,379,136 ·
Nov 8, 2019 66F60 FordDistrict 3 Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $432,193 ·
Nov 8, 2019 66K27 FordDistrict 3 Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. — Executed Nov 26 New Iroquois Paving Corporation $841,960 ·
Nov 8, 2019 68B62 WoodfordDistrict 4 Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 ·
1–19 of 19

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.