Filtered by: County: Dupage Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 61K01 | DuPageDistrict 1 | Sidewalk construction, traffic signals and street lights on York Street from WB I-290 ramps/Crestview Avenue to Lake Street in Elmhurst. | — | Rejected | Martam Construction Incorporated $2,649,349 · | ||
| Jan 17, 2025 | 61K90 | DuPageDistrict 1 | Resurfacing Indian Trail Road from the Kane/DuPage County line to Eola Road in Aurora. | — | Executed | Geneva Construction Company $1,102,489 · | ||
| Jan 17, 2025 | 61L04 | DuPageDistrict 1 | Roadway reconstruction on Woodridge Drive from Hobson Road to Center Drive in Woodridge. | — | Executed | K-Five Construction Corporation $2,756,923 · | ||
| Jan 17, 2025 | 62T21 | DuPageDistrict 1 | (6.15-Mile) Smart Overlay and ADA Ramp improvements, hot-mix asphalt surface removal and replacement, pedestrian ramp, pavement patching, pavement markings. Project location at IL 56 (Butterfield Road) from 0.4 mile west of IL 59 to East of Naperville Road within Cities of Warrenville, Wheaton and Aurora in Dupage Co. | — | Executed | R. W. Dunteman Company $6,615,450 · | ||
| Jan 17, 2025 | 62W49 | DuPageDistrict 1 | (1.40-Mile) Standard Overlay, ADA Improvements: Hot-mix asphalt surface removal earth excavation, new shoulders, pavement patching, hot-mix asphalt surface course, hot-mix asphalt binder course, curb and gutter removal and replacement, longitudinal joint sealing, thermoplastic pavement markings, raised reflective pavement markers, detector loops replacement and incidental and collateral work Project is located on I-55 (North) Frontage Road, from Clarendon Hills Road to Cass Avenue, within the Ci | — | Executed | K-Five Construction Corporation $1,066,333 · | ||
| Jan 17, 2025 | 62X75 | CookDuPageDistrict 1 | Expressway Cleaning (Litter/Debris Removal) on various routes in D1. | — | Executed | Orlando Lawn Service, Inc. $276,000 · | ||
| Mar 7, 2025 | 61L10 | DuPageDistrict 1 | PCC Sidewalk with segmental concrete block retaining wall from Freeport Drive to DuJardin Elementary Shcool. Additional work includes curb and gutter, pavement patching, storm sewer, steel railing, and fencing. | — | Executed | D'Land Construction, LLC $225,598 · | ||
| Mar 7, 2025 | 62N33 | DuPageDistrict 1 | (16.7-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 64 (North Avenue) from Smith / Kautz Rd to York St in the Cities of St. Charles West Chicago, and Elmhurst, and in the Villages of Carol Stream, Glendale Heights, Lombard, Addison, and Villa Park in DuPage County. | — | Rejected | John Burns Construction Company $25,464,000 · | ||
| Mar 7, 2025 | 62R58 | CookDuPageDistrict 1 | This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties. | — | Executed | R. W. Dunteman Company $4,792,444 · | ||
| Mar 7, 2025 | 62T31 | DuPageDistrict 1 | Gross and Net Length = 3,713 feet (0.703 miles) and 341 feet (0.065 miles). Bridge Preservation Project: Deck Overlay, Joint Replacement / Repair at IL 53 over Ginko Way (Morton Arboretum) and over East Branch DuPage River. This project is located in Unincorporated DuPage County. | — | Executed | D. Construction, Inc. $1,159,146 · | ||
| Mar 7, 2025 | 62W60 | CookDuPageDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1. | — | Executed | H & H Electric Co. $1,375,723 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Apr 25, 2025 | 61G79 | DuPageDistrict 1 | Widening the North Aurora road underpass and construction of railroad Bridges to carry WCL and BNSF Railways over North Aurora Road in Naperville. | — | Executed | OHLA Central, Inc. $33,197,030 · | ||
| Apr 25, 2025 | 61K79 | DuPageDistrict 1 | Construct HMA bike paths at various locations in Carol Stream. | — | Executed | Everlast Blacktop Inc. $871,518 · | ||
| Apr 25, 2025 | 61K95 | DuPageDistrict 1 | HMA resurfacing on Lombard Rod from Army Trail Boulevard to Lake Street in Addison. Includes; ADA improvements, storm sewers, and Landscaping. | — | Executed | R. W. Dunteman Company $1,638,372 · | ||
| Apr 25, 2025 | 61L29 | DuPageDistrict 1 | HMA resurfacing on Fairfield Way between Lake Street and Bloomingdale Road in Bloomingdale. Includes; Patching, curb and gutter, and frame and grate adjustments. | — | Executed | Builders Paving, LLC $1,534,281 · | ||
| Apr 25, 2025 | 62V86 | DuPageDistrict 1 | (1.929-Mile) SMART Overlay, ADA Improvements: Removing and replace (HMA) surface course, pavement patching and curb removal and replacement, curb ramps, drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers. Pedestrian signals improvements (APS), detector loops replacement located on IL 53 (Lincoln Avenue), from North of 61st Street to 75th Street in the Villages of Woodridge and Lisle in DuPage County. | — | Executed | K-Five Construction Corporation $2,285,003 · | ||
| Jun 13, 2025 | 62N39 | CookDuPageDistrict 1 | (9.38-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization, and ADA Improvements. Located along 22nd St / Cermak Rd from York Rd to IL 50 (Cicero Ave.) in the Village of Oak Brook in DuPage County, and in the Villages of Hillside, Westchester, Broadview North Riverside, Forest Park, the City of Berwyn, and the Town of Cicero,in Cook County. | — | Executed | Meade Inc. $20,875,047 · | ||
| Jun 13, 2025 | 62V88 | DuPageDistrict 1 | Curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphal (3,848-Ft) Designed Overlay, ADA Improvements, New Shoulders consists of curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphalt pavement milling, patches (Class D), replace existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, longitudinal joint sealing, resurfacing (inlay) with HMA binder and surface course, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian sig | — | Executed | R. W. Dunteman Company $1,208,153 · | ||
| Jun 13, 2025 | 62X60 | DuPageDistrict 1 | Designed overlay, ADA improvements, and collateral work necessary to complete the project (2,909-Ft) Improvement consists of Designed overlay, ADA improvements, and collateral work necessary to complete the project. Located on Gary-s Mill Road from IL. 38 to IL. 59 in the City of West Chicago. | — | Executed | R. W. Dunteman Company $842,712 · | ||
| Aug 1, 2025 | 61K77 | DuPageDistrict 1 | Construct a shared-use path along Elizabeth Drive from Forest Preserve Drive to Wood Dale Road, and Wood Dale from Murray Drive to Elizabeth Drive in Wood Dale. | — | Executed | R. W. Dunteman Company $553,433 · | ||
| Aug 1, 2025 | 61L45 | DuPageDistrict 1 | Scarification of existing PCC pavement, and HMA resurfacing on Western Frontage Road from IL 83 to Oakleaf Drive in Addison Township. | — | Executed | R. W. Dunteman Company $495,500 · | ||
| Aug 1, 2025 | 61L46 | DuPageDistrict 1 | Construct Multi-Use Paths along various routes in Hanover Park. Includes; PCC Sidewalk, and steel plate beam guardrail. | — | Executed | A Lamp Concrete Contractors, Inc. $1,424,943 · | ||
| Aug 1, 2025 | 61L47 | DuPageDistrict 1 | HMA resurfacing and widening of Town Road from West Roosevelt Road (IL 38) to West Washington Street in West Chicago. Includes; curb and gutter, sidewalks, ADA ramps, driveways, and storm sewer. | — | Executed | Everlast Blacktop Inc. $1,807,185 · | ||
| Aug 1, 2025 | 62W21 | DuPageDistrict 1 | Joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overh (500-Ft) Bridge Deck Overlay on SN 022-0072 consists of joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overhead) in the Village of Darien, DuPage County, Illinois. | — | Executed | Martam Construction Incorporated $1,781,767 · | ||
| Sep 19, 2025 | 61L69 | DuPageDistrict 1 | Construct a prefabicated pedestrian truss bridge to carry Cricket Trail extension over IL 83 in Elmhurst. | — | Executed | D. Construction, Inc. $3,634,117 · | ||
| Sep 19, 2025 | 62W62 | CookDuPageWillDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. | — | Executed | John Burns Construction Company $2,170,856 · | ||
| Nov 7, 2025 | 61J54 | DuPageDistrict 1 | Extension of the west branch of DuPage River Trail from Gary's Mill Road to an existing trail within the West DuPage Woods Forest Preserve. | — | Executed | Lorig Construction Company $6,927,969 · | ||
| Nov 7, 2025 | 61L57 | DuPageDistrict 1 | Resurfacing Stonebridge Boulevard from Sheffer Road to Indian head Road, and from Sheffer Road to Eola Road in Aurora. | — | Executed | K-Five Construction Corporation $1,786,248 · | ||
| Nov 7, 2025 | 61L78 | DuPageDistrict 1 | Resurfacing Rober Palmer Drive from North York Street to South York Street in Elmhurst. | — | Executed | A Lamp Concrete Contractors, Inc. $1,308,888 · | ||
| Nov 7, 2025 | 61L79 | DuPageDistrict 1 | HMA resurfacing on Lambert Road from the South Village limits to IL 38 in Glen Ellyn. Includes; pavement patching, curb and gutter, sidewalks, ADA ramps, and q traffic signal maintenance. | — | Executed | K-Five Construction Corporation $1,759,309 · | ||
| Nov 7, 2025 | 61L80 | DuPageDistrict 1 | Resurfacing Riford Road from St. Harles Road to Crescent Boulevard in Glen Ellyn. | — | Executed | Schroeder Asphalt Services, Inc. $603,175 · | ||
| Nov 7, 2025 | 80B70 | DuPageDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim The project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes within DuPage County. | — | Executed | Central Sweeping of Illinois, LLC $2,013,220 · |
1–33 of 33
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.