| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 66E20 | DeKalbDistrict 3 | 3P milling and resurfacing (designed overlay) The project is located on FAP 17 (IL 64) from Clare Rd to 0.4 Ml W of IL 23(S) in Sycamore, for a total of 6.59 miles, the work consists of 3P milling and resurfacing (designed overlay). Other work includes grading and shaping ditches, shoulder stone, culvert work, guardrail work, pavement marking, and raised reflectors. | — | Executed | William Charles Construction Company, LLC $3,764,401 · | ||
| Jan 21, 2022 | 87763 | DeKalbDistrict 3 | Full depth pavement reclamation, HMA pavement, curb and gutter, sidewalks, storm sewer, water main construction and pavement markings on Latham Street from Center Street to Sandhurst Drive in Sandwich. | — | Executed | Berger Excavating Contractors, Inc. $3,227,920 · | ||
| Apr 29, 2022 | 66J64 | DeKalbDistrict 3 | Milling and resurfacing IL 38 (2 Project consists of milling and resurfacing IL 38 (2.5" to 3.75") from 5th St in city of Dekalb to County Line Rd, Dekalb County. The length of the job is 7.96 miles. Work includes ADA improvements, Traffic signal upgrades and miscellaneous drainage improvements. Local participation from Dekalb is expected for parking lanes and ADA ramps. | — | Executed | Curran Contracting Company $5,740,762 · | ||
| Apr 29, 2022 | 66L50 | DeKalbDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 38 from W. of John Huber Huber Pkwy to 5th St in Dekalb, Dekalb County. The omission area is from 1st St to W of 4th St. Milling and resurfacing at IL23/IL 38 shall be 2.5". The paving work shall be done at night. Some ADA work and traffic signal improvements are proposed. Project length is 2.52 miles. | — | Executed | Curran Contracting Company $3,744,002 · | ||
| Apr 29, 2022 | 66M10 | DeKalbIroquoisDistrict 3 | This project includes traffic signal improvements and railroad interconnect system upgrades at five intersections on US 24/IL 1 from Second St TO Eighth St in Watseka. This project also includes the aforementioned improvements at the intersection of US 30 and Elm St in Waterman. | — | Executed | Outsen Electric, Incorporated $238,185 · | ||
| Apr 29, 2022 | 66M29 | DeKalbDistrict 3 | Milling and resurfacing, preparation of base and aggregate base repairs This work is located at the Illinois Department of Transportation District 3 Sycamore Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs. | — | Executed | Curran Contracting Company $191,273 · | ||
| Apr 29, 2022 | 87750 | DeKalbDistrict 3 | Pavement widening, resurfacing, aggregate and HMA shoulders, curb and gutter, traffic signal modernization, pavement markings on Peace Road from the I-80 westbound exit ramp to IL 38 in the city of DeKalb. | — | Executed | William Charles Construction Company, LLC $3,514,800 · | ||
| Apr 29, 2022 | 87770 | DeKalbDistrict 3 | Resurfacing Suydam Road from Rollo Road to Il 23. | — | Executed | Curran Contracting Company $1,698,623 · | ||
| Apr 29, 2022 | 87788 | DeKalbDistrict 3 | Resurfacing, HMA Shoulders and Pavement Markings on North First Street from Bethany Road to Old State Road. | — | Executed | Curran Contracting Company $843,488 · | ||
| Jun 17, 2022 | 66A80 | DeKalbDistrict 3 | Milling and resurfacing 4 Work consists of milling and resurfacing 4.25" on IL 72 from Bull Run Creek in Kirkland to State St. in Genoa in Dekalb County. Additional work includes resurfacing parking lanes in Kirkland, guardrail upgrades, and drainage improvements. The total length of the job is 8.1 miles. | — | Executed | Curran Contracting Company $4,683,751 · | ||
| Jun 17, 2022 | 66H07 | DeKalbDistrict 3 | This work is located on FAP 573 (US 30) from the Lee County line to 0.5 miles East of Shabbona Road in Shabbona. This work consists of 3.96 miles of 3-3/4" milling and hot-mix asphalt resurfacing. The project also_includes the reconstruction of several ADA sidewalk ramps throughout Shabbona. | — | Executed | Builders Paving, LLC $2,738,000 · | ||
| Jun 17, 2022 | 66L58 | DeKalbKendallDistrict 3 | 5.41 miles, Milling and Resurfacing (Designed Overlay) and ADA 0.2 miles East of Somonauk Rd in Somonauk to Chilton Way in Plano. | — | Executed | D. Construction, Inc. $6,075,158 · | ||
| Jun 17, 2022 | 66M02 | DeKalbDistrict 3 | This work is located at Structure No. 019-0012 carrying FAP Route 17 (IL 64) over the Kishwaukee River approximately 1.5 miles West of Jct. IL 23 (Sycamore) This work consists riprap placement, guardrail removal and replacement, expansion joint replacement, deck patching, pavement striping, and other related construction items. | — | Executed | Sjostrom & Sons, Inc. $370,683 · | ||
| Jun 17, 2022 | 87779 | DeKalbDistrict 3 | Replace two bridges in DeKalb; Lucinda Avenue over the south branch of the Kishwaukee River, and North First Street over the south branch of the Kishwaukee River. | — | Executed | Herlihy Mid-Continent Company $5,253,737 · |
1–14 of 14
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.