IDOT Jobs

2020 · 18 jobs · — Sign up free
★ My Jobs

Filtered by: County: Bureau Clear all

18 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2020 66F08 BureauPutnamDistrict 3 Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge. — Executed Nov 26 New Civil Constructors, Inc. $25,110,125 ·
Jan 17, 2020 66K36 BureauDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components on SN's 006-0125 and 006-0126. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $416,773 ·
Jan 17, 2020 66K74 BureauDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 006-0123 carrying TR 148 over I-80. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $194,041 ·
Mar 6, 2020 87718 BureauDistrict 3 Resurfacing and aggregate shoulders on CH 24 from CH 8 to Tiskilwa Spur Road in Tiskilwa. — Executed Nov 26 New Advanced Asphalt Company $998,904 ·
Mar 6, 2020 87719 BureauDistrict 3 Replace the bridge carrying W. Epperson Road over Epperson Run Creek at the western limits of the City of Princeton. — Executed Nov 26 New Curnyn Construction Co. $495,779 ·
Mar 6, 2020 87734 BureauDistrict 3 Approximately 96.28 miles of bituminous surface treatment and crack filling on various county highways in Bureau County. — Executed Nov 26 New Pavement Maintenance Services, Inc. $2,594,660 ·
Apr 24, 2020 66968 BureauDistrict 3 3P milling and resurfacing on FAP 613 (US 34) from Henry County Line to 1200N Rd in Bureau County. — Executed Nov 26 New Advanced Asphalt Company $2,572,903 ·
Apr 24, 2020 66K30 BureauDistrict 3 5.76 miles of SMART overlay consisting of milling and resurfacing of 2" of HMA and additional ADA, guardrail, and drainage improvements from E of IL 40 to Hazelwood Dr in Wyanet. — Executed Nov 26 New Advanced Asphalt Company $1,697,790 ·
Apr 24, 2020 66K58 BureauDistrict 3 Milling 3" and resurfacing 3.75" on the first mile, the rest of the project will be milled and resurfaced with 3.75" of HMA. The city of Princeton will participate with milling and resurfacing the parking lanes and ADA improvements. Minor drainage improvements are included. The project length is 1.34 miles. — Executed Nov 26 New Advanced Asphalt Company $967,303 ·
Apr 24, 2020 66K92 BureauDistrict 3 Furnishing and installing stone dumped riprap to armor existing foreslope erosion on NB I-180 0.2 mile S of TR 281 (SN 006-0126). — Executed Nov 26 New D. Construction, Inc. $52,700 ·
Jun 12, 2020 66K28 BureauDistrict 3 3P milling and resurfacing (designed overlay) and ADA from US 6/34 to BSNF RR S of Buda. — Executed Nov 26 New Advanced Asphalt Company $1,374,338 ·
Jun 12, 2020 66K59 BureauDistrict 3 8.532 miles of milling and resurfacing 3-3/4" of mainline from the eastern city limit of Dover to IL 89 in Lamoille. This project includes pavement markings. — Executed Nov 26 New Advanced Asphalt Company $3,113,802 ·
Jun 12, 2020 87720 BureauDistrict 3 Replace the bridge carrying Jefferson Street over Rocky run Creek in Tiskilwa. — Executed Nov 26 New D. Construction, Inc. $331,165 ·
Jun 12, 2020 87721 BureauDistrict 3 Resurface Ladd Road from US 6 to Dakota Street in Spring Valley. — Executed Nov 26 New Advanced Asphalt Company $226,431 ·
Jul 31, 2020 66L16 BureauDistrict 3 Scour mitigation measures (riprap) at SN 006-0114 carrying FAS 248 (Tiskilwa Spur) over Big Bureau Creek 0.3 mi N of Tiskilwa in Bureau County. — Executed Nov 26 New D. Construction, Inc. $40,542 ·
Sep 18, 2020 66L09 BureauDistrict 3 Installing a 36" ERS concrete Pipe culvert adjacent to the box culvert This work is located on FAS Route 1279 (US 34) carrying US 34 adjacent to a concrete Box culvert, Structure No. 006-2569, Station 428+72 in Bureau County. This project consists of installing a 36" ERS concrete Pipe culvert adjacent to the box culvert. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $54,859 ·
Sep 18, 2020 66L11 BureauDeKalbDistrict 3 The removal and replacement of traffic signal "Controller Cabinets This work is located at various intersections on US 6 in Bureau County and IL 38 in DeKalb County. This work consists of the removal and replacement of traffic signal "Controller Cabinets." — Executed Nov 26 New H & H Electric Co. $429,688 ·
Nov 6, 2020 87737 BureauDistrict 3 Replace the bridge carrying CH 8 over Maple Creek, 2 miles north of Wyanet. — Executed Nov 26 New D. Construction, Inc. $961,533 ·
1–18 of 18

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.