| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 4-02024-2701 4020242701 | District 4 | IL-17IL-180 | Rehabilitation - Pavement Standard Overlay 6th St in Galva to 0.1 mi S of ILL 17(E) | $4,500,000 | Planned | ||
| — | 4-02205-0150 4022050150 | District 4 | Main StUS-67 | Rehabilitation - Pavement Designed Overlay US 136 (E) to Grindstone Creek At Industry NCL | $36,500,000 | Planned | ||
| — | 4-02205-0152 4022050152 | District 4 | Main StUS-67 | Rehabilitation - Pavement Utility Adjustment US 136 (E) to Grindstone Creek At Industry NCL | $1,000,000 | Planned | ||
| — | 4-02922-0000 4029220000 | District 4 | IL-100IL-78US-136 | Rehabilitation - Pavement Designed Overlay US 24 to Illinois River | $5,600,000 | Planned | ||
| — | 4-02922-0200 4029220200 | District 4 | IL-9 | Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement Ave F to Ave A in Canton | $9,000,000 | Planned | ||
| — | 4-02922-0300 4029220300 | District 4 | IL-78 | Rehabilitation - Pavement Designed Overlay Big Creek Park to ILL 9 (Locust St) in Canton | $5,000,000 | Planned | ||
| — | 4-02924-0000 4029240000 | District 4 | IL-78IL-9 | Rehabilitation - Pavement Designed Overlay E of 1st Ave to 5th Ave in Canton | $800,000 | Planned | ||
| — | 4-02925-0000 4029250000 | District 4 | US-24 | Rehabilitation - Pavement Designed Overlay Hendrick Rd to Astoria WCL & Astoria ECL to 0.2 mi W of Bucher Rd | $10,000,000 | Planned | ||
| — | 4-02925-0100 4029250100 | District 4 | IL-116 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Farmington WCL to JCT ILL 78 (S) | $4,000,000 | Planned | ||
| — | 4-02926-0000 4029260000 | District 4 | IL-78 | Rehabilitation - Pavement Standard Overlay ILL 78: N of Alder St to S of Big Creek Park in Canton; Old ILL 78: ILL 78 (N) to ILL 78 (S) in Canton | $3,750,000 | Planned | ||
| — | 4-03050-0100 4030500100 | District 4 | IL-41IL-9 | Rehabilitation - Pavement Designed Overlay, Curb And Gutter, Storm Sewer (New) NCL to SCL of Bushnell | $5,200,000 | Planned | ||
| — | 4-03622-0000 4036220000 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay Henderson Creek Overflow to Old US 34 in Biggsville | $15,000,000 | Planned | ||
| — | 4-03622-0600 4036220600 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay 1500E to Hancock Co Line | $8,000,000 | Planned | ||
| — | 4-03622-0800 4036220800 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay JCT ILL 135 (S) to Henderson Creek Overflow | $10,400,000 | Planned | ||
| — | 4-04250-0150 4042500150 | District 4 | IL-17 | Rehabilitation - Pavement Standard Overlay US 67 in Viola to US 150 | $8,700,000 | Planned | ||
| — | 4-04817-0200 4048170200 | District 4 | US-34 | Rehabilitation - Pavement Designed Overlay Knox Rd 900E to Oneida ECL | $5,750,000 | Planned | ||
| — | 4-04819-0600 4048190600 | District 4 | IL-97 | Rehabilitation - Pavement Designed Overlay S of Littlers Creek to ILL 116 | $12,600,000 | Planned | ||
| — | 4-04819-0650 4048190650 | District 4 | IL-97 | Rehabilitation - Pavement Utility Adjustment S of Littlers Creek to ILL 116 | $500,000 | Planned | ||
| — | 4-04822-0400 4048220400 | District 4 | IL-8 | Rehabilitation - Pavement Designed Overlay ILL 97 to ILL 78 (S) | $9,500,000 | Planned | ||
| — | 4-04825-0200 4048250200 | District 4 | US-34 | Rehabilitation - Pavement Designed Overlay Oneida ECL to JCT ILL 17 (W) | $10,500,000 | Planned | ||
| — | 4-05517-0600 4055170600 | District 4 | IL-41US-136 | Rehabilitation - Pavement Designed Overlay Bushnell SCL to N of TR 199 | $9,000,000 | Planned | ||
| — | 4-06217-0200 4062170200 | District 4 | IL-17IL-251 | Rehabilitation - Pavement Designed Overlay, ADA Improvements ILL 251: Wenona NCL to ILL 17 (W); Westmont St: ILL 251 to S of CR 800N | $12,000,000 | Planned | ||
| — | 4-06220-0000 4062200000 | District 4 | IL-117 | Rehabilitation - Pavement Designed Overlay N of LaRose Rd to ILL 116(E) | $11,119,000 | Planned | ||
| — | 4-06220-0200 4062200200 | District 4 | IL-17 | Rehabilitation - Pavement Designed Overlay, Drainage, ADA Improvements Illinois River to Lacon ECL | $8,300,000 | Planned | ||
| — | 4-06222-0000 4062220000 | District 4 | IL-17 | Rehabilitation - Pavement Designed Overlay ILL 40 to Illinois River | $12,500,000 | Planned | ||
| — | 4-06222-0600 4062220600 | District 4 | IL-26 | Rehabilitation - Pavement Designed Overlay, ADA Improvements NCL to SCL of Lacon | $10,000,000 | Planned | ||
| — | 4-06622-0000 4066220000 | District 4 | IL-17IL-94 | Rehabilitation - Pavement Standard Overlay 11th Ave to E of ILL 94 (N) in Aledo | $3,500,000 | Planned | ||
| — | 4-07010-0300 4070100300 | District 4 | (eastbound)I-74 | Rehabilitation - Pavement Standard Overlay, Resurfacing (Int-3rd) E of ILL 97 to Spoon River | $13,000,000 | Planned | ||
| — | 4-07217-0600 4072170600 | District 4 | IL-8 | Rehabilitation - Pavement Designed Overlay ILL 78 to Texas Rd | $8,700,000 | Planned | ||
| — | 4-07219-0800 4072190800 | District 4 | IL-29IL-6 | Rehabilitation - Pavement Designed Overlay 0.2 mi N of ILL 6 to 0.2 mi N of Gardner Ln in Peoria | $14,500,000 | Planned | ||
| — | 4-07219-1650 4072191650 | District 4 | US-150 | Rehabilitation - Pavement Utility Adjustment 0.2 mi W of Orange Prairie Rd to 0.1 mi W of Int Sterling Ave / Glen Ave in Peoria | $700,000 | Planned | ||
| — | 4-07219-1900 4072191900 | District 4 | US-150 | Rehabilitation - Pavement Designed Overlay, Shoulder Reconstruction, Curb And Gutter 0.2 Mi W of Orange Prairie Rd to 0.1 Mi W of Int Frostwood Pkwy | $15,000,000 | Planned | ||
| — | 4-07220-0600 4072200600 | District 4 | Dr M L King Jr Dr | Rehabilitation - Pavement Designed Overlay, ADA Improvements ILL 116 (Harmon Hwy) to Western Ave in West Peoria | $3,373,000 | Planned | ||
| — | 4-07220-2000 4072202000 | District 4 | Farmington RdIL-8 | Rehabilitation - Pavement Designed Overlay, Widening & Resurfacing, Bikeway E of Kickapoo Creek in West Peoria to N of Main St in Peoria | $25,000,000 | Planned | ||
| — | 4-07222-0800 4072220800 | District 4 | US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements E of Prospect Rd to W of Adams St in Peoria | $3,500,000 | Planned | ||
| — | 4-07222-1200 4072221200 | District 4 | IL-40 | Rehabilitation - Pavement Designed Overlay, ADA Improvements N of Pioneer Pkwy to S of Prospect Rd in Peoria | $8,000,000 | Planned | ||
| — | 4-07222-1400 4072221400 | District 4 | IL-40 | Rehabilitation - Pavement Standard Overlay N of Timber Ln to N of Pioneer Pkwy in Peoria | $4,000,000 | Planned | ||
| — | 4-07222-2200 4072222200 | District 4 | IL-8Southport Rd | Rehabilitation - Pavement Designed Overlay I-474 to Farmington Rd | $4,000,000 | Planned | ||
| — | 4-07225-0200 4072250200 | District 4 | IL-91 | Rehabilitation - Pavement Designed Overlay 0.1 Mi S of Legion Hall Rd to Grange Hall Rd | $4,000,000 | Planned | ||
| — | 4-07817-0200 4078170200 | District 4 | IL-29 | Rehabilitation - Pavement Standard Overlay Bureau Co Line to Henry NCL | $9,500,000 | Planned | ||
| — | 4-07820-0200 4078200200 | District 4 | IL-89 | Rehabilitation - Pavement Designed Overlay ILL 71 to Marshall Co Line | $7,800,000 | Planned | ||
| — | 4-08825-0300 4088250300 | District 4 | IL-17IL-91 | Rehabilitation - Pavement Designed Overlay Toulon ECL to Spoon River | $17,000,000 | Planned | ||
| — | 4-09017-0000 4090170000 | District 4 | IL-29IL-9 | Rehabilitation - Pavement Designed Overlay N of Thornton St to Mackinaw River | $10,000,000 | Planned | ||
| — | 4-09020-0600 4090200600 | District 4 | US-150US-24 | Rehabilitation - Pavement Standard Overlay McClugage Bridge to E of College Dr | $4,200,000 | Planned | ||
| — | 4-09022-0400 4090220400 | District 4 | IL-98 | Rehabilitation - Pavement Culvert Replacement 0.2 mi E of Parkway Dr in North Pekin to 0.2 mi W of Flint St in Morton | $25,000,000 | Planned | ||
| — | 4-09023-0000 4090230000 | District 4 | US-24 | Rehabilitation - Pavement Standard Overlay Cummings Ln to 0.3 mi E of US 24 BUS | $12,000,000 | Planned | ||
| — | 4-09024-0000 4090240000 | District 4 | IL-29 | Rehabilitation - Pavement Designed Overlay Mackinaw River to US 136 | $12,000,000 | Planned | ||
| — | 4-40530-0100 4405300100 | District 4 | IL-167 | Rehabilitation - Pavement Designed Overlay 0.1 Mi W of West St in Victoria to ILL 180 | $6,600,000 | Planned | ||
| — | 4-40720-0300 4407200300 | District 4 | US-67 | Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement, New Shoulders 210th Ave to N of US 34 in Monmouth | $3,500,000 | Planned | ||
| — | 4-44250-0100 4442500100 | District 4 | IL-251 | Rehabilitation - Pavement Designed Overlay ILL 17 to Woodford Co line | $8,400,000 | Planned | ||
| — | 5-36080-0100 5360800100 | District 5 | Morrisey AveUS-150 | Rehabilitation - Pavement Standard Overlay, ADA Improvements 0.1 mi N of E Lincoln St to Veterans Pkwy in Bloomington | $5,100,000 | Planned | ||
| — | 5-51690-0000 5516900000 | District 5 | IL-133IL-16US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Bikeway ILL 16 to Lower Terre Haute Rd in Paris | $5,500,000 | Planned | ||
| — | 5-52963-0000 5529630000 | District 5 | IL-165 | Rehabilitation - Pavement Standard Overlay ILL 9 to Cooksville WCL | $4,500,000 | Planned | ||
| — | 5-52964-0000 5529640000 | District 5 | IL-165 | Rehabilitation - Pavement Standard Overlay 0.2 Mi E of Colfax ECL to Ford Co Line | $4,600,000 | Planned | ||
| — | 5-52981-0000 5529810000 | District 5 | St Joseph Rd | Rehabilitation - Pavement Designed Overlay, ADA Improvements St Joseph SCL to Main St in Sidney | $5,000,000 | Planned | ||
| — | 5-52985-0000 5529850000 | District 5 | US-150 | Rehabilitation - Pavement Scour Mitigation Hemlock St in Leroy to Dewitt Co Line | $5,700,000 | Planned | ||
| — | 5-53007-0000 5530070000 | District 5 | Division StIL-47US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Eastwood Dr in Mahomet to ILL 10 | $4,500,000 | Planned | ||
| — | 5-53007-0400 5530070400 | District 5 | Division StIL-47US-150 | Rehabilitation - Pavement Utility Adjustment Eastwood Dr in Mahomet to ILL 10 | $50,000 | Planned | ||
| — | 5-53023-0000 5530230000 | District 5 | US-150 | Rehabilitation - Pavement Standard Overlay 0.1 Mi SE of Downs to Hemlock St in Leroy | $3,200,000 | Planned | ||
| — | 5-53027-0000 5530270000 | District 5 | US-150US-45 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Prospect Ave to Wright St in Champaign | $3,600,000 | Planned | ||
| — | 5-53029-0000 5530290000 | District 5 | IL-10 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Drainage Staley Rd to Mattis Ave in Champaign | $2,500,000 | Planned | ||
| — | 5-53065-0000 5530650000 | District 5 | US-136 | Rehabilitation - Pavement Designed Overlay E of Main St in Gifford to Vermilion Co line | $3,500,000 | Planned | ||
| — | 5-53066-0000 5530660000 | District 5 | IL-10 | Rehabilitation - Pavement Designed Overlay Bondville WCL to Staley Rd W of Champaign | $3,000,000 | Planned | ||
| — | 5-53067-0000 5530670000 | District 5 | IL-130US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements University Ave to ILL 130 (S) in Urbana | $1,400,000 | Planned | ||
| — | 5-53072-0000 5530720000 | District 5 | Bowman Ave | Rehabilitation - Pavement Designed Overlay ILL 119 to Newell Rd | $3,400,000 | Planned | ||
| — | 5-53074-0000 5530740000 | District 5 | 800 E850 EOakwood St | Rehabilitation - Pavement Standard Overlay, ADA Improvements Range Line Rd to Catlin-Homer Rd | $5,900,000 | Planned | ||
| — | 5-53086-0000 5530860000 | District 5 | I-74 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-4th) McLean Co Line to Piatt Co Line | $10,500,000 | Planned | ||
| — | 5-53107-0000 5531070000 | District 5 | IL-10IL-54 | Rehabilitation - Pavement Standard Overlay, ADA Improvements US 54 / ILL 10: 0.3 MI W OF US 51 TO S SHERMAN ST IN CLINTON & ILL 10: ILL 54 TO MAGILL RD | $2,600,000 | Planned | ||
| — | 5-53108-0000 5531080000 | District 5 | IL-54 | Rehabilitation - Pavement Standard Overlay ILL 48 to McLean Co Line | $2,800,000 | Planned | ||
| — | 5-53119-0000 5531190000 | District 5 | US-136 | Rehabilitation - Pavement Standard Overlay, ADA Improvements Champaign Co line to ILL 1 | $9,700,000 | Planned | ||
| — | 5-53121-0000 5531210000 | District 5 | Henning Rd | Rehabilitation - Pavement Standard Overlay US 136 to Hungry Hollow Rd NW of Danville | $6,500,000 | Planned | ||
| — | 5-53153-0000 5531530000 | District 5 | IL-9 | Rehabilitation - Pavement Standard Overlay ILL 1 at Hoopeston to Indiana State Line | $8,000,000 | Planned | ||
| — | 5-53154-0000 5531540000 | District 5 | IL-49 | Rehabilitation - Pavement Standard Overlay Iroquois Co Line to US 136 (W) | $4,900,000 | Planned | ||
| — | 5-53157-0000 5531570000 | District 5 | IL-130 | Rehabilitation - Pavement Standard Overlay US 36 to Coles Co Line | $5,000,000 | Planned | ||
| — | 5-53164-0000 5531640000 | District 5 | IL-54 | Rehabilitation - Pavement Standard Overlay Ford Co Line to 0.1 mi SW of State St in Bellflower | $4,000,000 | Planned | ||
| — | 5-53181-0000 5531810000 | District 5 | IL-10 | Rehabilitation - Pavement Designed Overlay Weldon Springs Rd to ILL 48 | $8,150,000 | Planned | ||
| — | 5-53192-0000 5531920000 | District 5 | IL-1US-136US-150 | Rehabilitation - Pavement Standard Overlay, ADA Improvements 0.2 Mi N of Liberty Ln to Vermilion River in Danville | $4,800,000 | Planned | ||
| — | 5-53197-0000 5531970000 | District 5 | IL-49US-150Warren St | Rehabilitation - Pavement Designed Overlay Main St in St Joseph to ILL 49 (N) W of Fithian | $8,200,000 | Planned | ||
| — | 5-53307-0000 5533070000 | District 5 | Main StUS-51 BUSUS-51 BUSB | Rehabilitation - Pavement Designed Overlay Olive St to Woodrig Rd in Bloomington | $10,000,000 | Planned | ||
| — | 5-53312-0000 5533120000 | District 5 | US-136 | Rehabilitation - Pavement Designed Overlay, Median Repair Shellhouse Dr to 0.1 mi E of Sunview Dr in Rantoul | $4,000,000 | Planned | ||
| — | 5-53319-0000 5533190000 | District 5 | US-150University Ave | Rehabilitation - Pavement Culvert Extension E of N Maple St to ILL 130 (S) in Urbana | $3,000,000 | Planned | ||
| — | 5-53322-0000 5533220000 | District 5 | I-57 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-2nd) 0.3 Mi N of US 36 to S of Sadorus Rd | $21,000,000 | Planned | ||
| — | 5-53323-0000 5533230000 | District 5 | IL-1US-136 | Rehabilitation - Pavement Designed Overlay 0.2 Mi N of Rossville SCL to 0.2 Mi N of Shady Lane Rd in Danville | $8,000,000 | Planned | ||
| — | 5-53332-0000 5533320000 | District 5 | IL-48 | Rehabilitation - Pavement Standard Overlay ILL 10 at Weldon to ILL 32 at Cisco | $4,300,000 | Planned | ||
| — | 5-53341-0000 5533410000 | District 5 | Prospect AveUS-150 | Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement, Intersection Improvement Marketview Dr to ILL 10 (Springfield Ave) in Champaign | $13,200,000 | Planned | ||
| — | 5-53358-0000 5533580000 | District 5 | Indianola Rd | Rehabilitation - Pavement Designed Overlay WCL to ECL of Indianola | $2,500,000 | Planned | ||
| — | 5-53369-0000 5533690000 | District 5 | US-136 | Rehabilitation - Pavement Standard Overlay ILL 54 to Champaign Co Line | $2,500,000 | Planned | ||
| — | 5-53384-0000 5533840000 | District 5 | IL-9US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Curb And Gutter N Main St to E Empire St in Bloomington | $11,519,000 | Planned | ||
| — | 5-53384-0200 5533840200 | District 5 | IL-9US-150 | Rehabilitation - Pavement Utility Adjustment N Main St to E Empire St in Bloomington | $50,000 | Planned | ||
| — | 5-53389-0000 5533890000 | District 5 | Market St | Rehabilitation - Pavement Designed Overlay Ford Harris Rd to Hensley Rd N of Champaign | $1,700,000 | Planned | ||
| — | 5-53419-0000 5534190000 | District 5 | IL-1US-150 | Rehabilitation - Pavement Designed Overlay US 36 to Moss Rd N of Paris | $3,500,000 | Planned | ||
| — | 5-53424-0000 5534240000 | District 5 | 785 NMill Rd | Rehabilitation - Pavement Designed Overlay 0.6 mi E of Georgetown ECL to Indiana State Line | $3,800,000 | Planned | ||
| — | 5-53425-0000 5534250000 | District 5 | Georgetown /Indianola Rd | Rehabilitation - Pavement Standard Overlay Catlin / Indianola Rd to 1520E W of Georgetown | $2,000,000 | Planned | ||
| — | 5-53435-0000 5534350000 | District 5 | IL-49 | Rehabilitation - Pavement Standard Overlay I-74 to US 150 at Ogden | $2,000,000 | Planned | ||
| — | 5-53443-0000 5534430000 | District 5 | Bement-hammondRd | Rehabilitation - Pavement Designed Overlay ILL 105 to US 36 E of Hammond | $4,600,000 | Planned | ||
| — | 5-53447-0000 5534470000 | District 5 | Chestnut St | Rehabilitation - Pavement Standard Overlay US 136 to I-74 S of Leroy | $1,900,000 | Planned | ||
| — | 5-53507-0000 5535070000 | District 5 | I-72 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-4th) Macon Co line to ILL 105 N of Monticello | $26,300,000 | Planned | ||
| — | 5-53523-0000 5535230000 | District 5 | I-55 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-3rd) 0.9 mi N of Pipeline Rd NE of Normal to 0.4 mi S of CH 8 S of Lexington | $26,000,000 | Planned | ||
| — | 5-53530-0000 5535300000 | District 5 | US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Washington St in Mansfield to S Division St in Mahomet | $5,800,000 | Planned | ||
| — | 5-53894-0000 5538940000 | District 5 | IL-1US-150 | Rehabilitation - Pavement Designed Overlay, Cold Milling, Guardrail Moss Rd to 0.5 Mi S of Gibson Dr S of Paris | $17,000,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.