18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 6, 2026 | 0581-01-177STP 2026(862)HES | Dallas Dallas |
SL 12 from US 175 to Pemberton HillSL 12 · Safety Improvement Projects | $3,098,428 | $2,138,842 | ALBATROSS CONSTRUCTION LLC | -31.0% | 10 |
| Aug 6, 2026 | 0051-09-128STP 2025(963)HES | Galveston Houston |
FM 3005: Kiva Rd to S of 89th StFM 3005 · Safety Improvement Projects | $2,897,521 | $2,099,052 | JASCO | -27.6% | 14 |
| Aug 6, 2026 | 0906-32-067STP 2025(749)TAPS | Midland Odessa |
Wildcatter Trail - Champions, Etc.Various · Bicycle Infrastructure Improvements | $2,157,807 | $2,075,905 | DELGADO'S CONTRACTORS, LLC | -3.8% | 6 |
| Aug 6, 2026 | 6487-45-001RMC - A00216599 | Hays Austin |
FY 26 Non-Site Specific Traffic SignalsUS0290 · Routine Maintenance Project - Sealed | $1,745,379 | $1,975,939 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | +13.2% | 5 |
| Aug 6, 2026 | 6506-23-001MMC - A00223205 | Grayson Paris |
Aggregate Grayson/DWUS0075 · Material Maintenance Project - Sealed | $1,954,944 | $1,934,598 | RK HALL, LLC | -1.0% | 1 |
| Aug 6, 2026 | 6500-51-001RMC - A00220796 | Webb Laredo |
Cleaning and Sweeping Webb CountyIH0035 · Routine Maintenance Project - Sealed | $1,937,681 | $1,786,303 | DIGG COMMERCIAL, LLC | -7.8% | 3 |
| Aug 6, 2026 | 0920-39-033BR 2024(647) | Chambers Beaumont |
LOUGHRIDGE DR AT LEE GULLY-BRIDGE REPLACCR 398 · Bridge Replacement | $1,431,058 | $1,675,110 | CASTILLO ARANDA LLC | +17.1% | 6 |
| Aug 6, 2026 | 6505-50-001MMC - A00223085 | Hemphill Amarillo |
FY 27 Pampa Area Asphalt & EmulsionsUS0083 · Material Maintenance Project | $1,656,120 | $1,538,330 | ERGON ASPHALT & EMULSIONS, INC. | -7.1% | 2 |
| Aug 6, 2026 | 0901-21-022BR 2B25(155) | Franklin Paris |
CR NW 1018 Bridge ReplacementCOUNTY ROAD 1018 · Bridge Replacement | $1,535,801 | $1,492,466 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -2.8% | 5 |
| Aug 6, 2026 | 6505-41-001MMC - A00223074 | Hansford Amarillo |
FY 27 Dumas Area Asphalt & EmulsionsSH0015 · Material Maintenance Project | $1,226,016 | $1,147,052 | ERGON ASPHALT & EMULSIONS, INC. | -6.4% | 2 |
| Aug 6, 2026 | 0902-00-323F 2026(894) | Tarrant Fort Worth |
Traffic TCD 2026Various · Traffic Control Devices | $1,389,511 | $1,054,947 | DURABLE SPECIALTIES, INC. | -24.1% | 9 |
| Aug 6, 2026 | 6496-92-001RMC - A00219498 | Cooke Wichita Falls |
CULVERT REPAIR FY26FM3002 · Routine Maintenance Project - Sealed | $1,042,851 | $987,928 | GARRET SHIELDS INFRASTRUCTURE | -5.3% | 3 |
| Aug 6, 2026 | 6503-26-001RMC - A00222319 | Brazos Bryan |
FY27 - Bryan AO Mill & Inlay - 08SH0006 · Routine Maintenance Project - Sealed | $1,123,615 | $987,331 | BIG CREEK CONSTRUCTION, LTD. | -12.1% | 4 |
| Aug 6, 2026 | 0902-20-238BR 2026(019) | Wise Fort Worth |
CR 1590; at Big Sandy CreekCOUNTY ROAD 1590 · Bridge Replacement | $854,302 | $961,912 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +12.6% | 8 |
| Aug 6, 2026 | 6505-38-001MMC - A00223052 | Moore Amarillo |
FY 27 Amarillo Area Asphalt & EmulsionsUS0087 · Material Maintenance Project | $1,055,080 | $934,200 | ERGON ASPHALT & EMULSIONS, INC. | -11.5% | 2 |
| Aug 6, 2026 | 0902-90-283STP 2026(895)HESG | Tarrant Fort Worth |
E Berry St: At New York AveBERRY ST · Safety Improvement Projects | $1,142,056 | $919,477 | DURABLE SPECIALTIES, INC. | -19.5% | 6 |
| Aug 6, 2026 | 6505-51-001MMC - A00223088 | Moore Amarillo |
FY 27 Amarillo District Traction ControlUS0087 · Material Maintenance Project | $833,063 | $833,061 | VOLCANIC STONE CO. | 0.0% | 1 |
| Aug 6, 2026 | 0364-05-043F 2026(893) | Tarrant Fort Worth |
SH 183; SH 157 to Bear Creek BlvdSH 183 · Safety Improvement Projects | $825,559 | $698,181 | FOUTSCO PAVING COMPANY, LLC | -15.4% | 4 |
| Aug 6, 2026 | 1228-03-052STP 2B26(056)VRU | Hidalgo Pharr |
FM 1015 - SidewalksFM 1015 · Safety Improvement Projects | $648,521 | $662,209 | ARTILLERY L.L.C. | +2.1% | 4 |
| Aug 6, 2026 | 0910-00-165STP 2026(849)HES | Smith Tyler |
FY 26 Supplemental IlluminationVarious · Safety Improvement Projects | $926,787 | $655,280 | STRIPING TECHNOLOGY, L.P. | -29.3% | 10 |
| Aug 6, 2026 | 0092-06-112BR 2026(858) | Navarro Dallas |
IH 45 from N of CR 4742 to S of CR 4744IH 45 · Bridge Maintenance | $641,135 | $480,955 | REAR CONTRACTORS LLC | -25.0% | 9 |
| Aug 6, 2026 | 0911-00-161F 2026(870) | Angelina Lufkin |
VA_Various - FY 26 Green Ribbon ProgramVarious · Landscape & Scenic Enhancement | $666,100 | $452,893 | APEX LANDSCAPE & IRRIGATION, LLC | -32.0% | 5 |
| Aug 6, 2026 | 0914-00-581CC 914-00-581 | Travis Austin |
SH130 to IH-35 to Caldwell & Guadalupe CVarious · Traffic Control Devices | $316,715 | $307,520 | THE LEVY COMPANY, LLC | -2.9% | 4 |
| Aug 6, 2026 | 0920-39-028STP 2025(628)HESG | Chambers Beaumont |
CHAMBERS CO-2021 HSIP(PAVEMENT MARKINGS)Various · Safety Improvement Projects | $734,197 | $224,135 | STRIPE LINES, INC. | -69.5% | 3 |
| Aug 6, 2026 | 0914-18-130F 2026(903) | Bastrop Austin |
BAAO FY26 GR- SL109; SH21; US290; FM1704Various · Landscape & Scenic Enhancement | $355,992 | $224,027 | APEX LANDSCAPE & IRRIGATION, LLC | -37.1% | 8 |
| Aug 6, 2026 | 0083-02-060STP 2026(725)HES | Hopkins Paris |
SH 11 HSIPSH 11 · Safety Improvement Projects | $78,448 | $48,148 | STRIPING TECHNOLOGY, L.P. | -38.6% | 7 |
| Aug 6, 2026 | 6507-55-001EMC - A00223603 | Kerr San Antonio |
SH 27, SH 39 & FM 1338 EMERGENCY JULY 26SH0027 · Emergency Maintenance Project - Sealed | $1,718,661 | — | 0 | ||
| Aug 5, 2026 | 0089-07-166F 2B26(054) | Wharton Yoakum |
US 59 Widening 2712 - Phase 1US 59 · Freeway Operational Improvements | $241,162,765 | $185,831,780 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | -22.9% | 3 |
| Aug 5, 2026 | 0014-15-034STP 2026(890)MM | Tarrant Fort Worth |
US 287; N of Harmon Rd to N of IH 35WUS 81 · Intersection & Operational Imprv | $74,343,262 | $66,140,142 | INDUS ROAD & BRIDGE, INC. | -11.0% | 11 |
| Aug 5, 2026 | 0027-08-147F 2025(483) | Fort Bend Houston |
UA 90: FM 359 TO W of SH 99UA 90 · Widen Non-Freeway | $52,496,966 | $48,831,301 | SER CONSTRUCTION PARTNERS, LLC | -7.0% | 7 |
| Aug 5, 2026 | 2635-05-005F 2026(878) | Randall Amarillo |
SL 335 B-2: NEW LOCATION AMA LOOP, PH VSL 335 · New Location Freeway | $50,287,232 | $42,220,204 | J. LEE MILLIGAN, INC. | -16.0% | 5 |
| Aug 5, 2026 | 0132-03-036F 2026(839) | King Childress |
US 82 0.422 Miles E Airport to US 83US 82 · Rehabilitation of Existing Road | $27,289,982 | $28,760,605 | ZACK BURKETT CO. | +5.4% | 5 |
| Aug 5, 2026 | 3510-04-070STP 2B26(002)MM | Fort Bend Houston |
SH 99NB Fr, Westh pkw to Cinco Ranch blvSH 99 · New Location Non-Freeway | $31,713,552 | $25,954,400 | JAMES CONSTRUCTION GROUP, LLC | -18.2% | 8 |
| Aug 5, 2026 | 0441-09-054F 2025(313) | Reeves Odessa |
IH10_1.2MI_E_OF_FM3078_1.6MI_W_FM2903IH 10 · Rehabilitation of Existing Road | $21,197,038 | $14,980,840 | FNF CONSTRUCTION, INC. | -29.3% | 5 |
| Aug 5, 2026 | 0037-02-060BR 2B26(018) | Zavala Laredo |
US83 Bridge Replacement Nueces RiverUS 83 · Bridge Replacement | $17,896,171 | $13,786,607 | RELMCO, INC. | -23.0% | 10 |
| Aug 5, 2026 | 0013-05-046STP 2000(294)TP | Montague Wichita Falls |
US 287 8 miles south of BowieUS 81 · Safety Rest Area | $15,521,040 | $11,180,258 | MARIO SINACOLA & SONS EXCAVATING, INC. | -28.0% | 4 |
| Aug 5, 2026 | 0222-03-065F 2026(874) | Morris Atlanta |
SH 11 from US 259 to Cass C/LSH 11 · Rehabilitation of Existing Road | $11,759,396 | $10,759,105 | H. H. HOWARD & SONS, INC. | -8.5% | 7 |
| Aug 5, 2026 | 0114-02-112STP 2026(898)HES | Travis Austin |
US 290 at FM 973US 290 · Safety Improvement Projects | $7,928,494 | $8,579,439 | JOE BLAND CONSTRUCTION LLC | +8.2% | 6 |
| Aug 5, 2026 | 0991-02-014F 2026(845) | Karnes Corpus Christi |
FM 81 Karnes 181 to 1144 rehabFM 81 · Rehabilitation of Existing Road | $9,367,704 | $8,343,314 | CLARK CONSTRUCTION OF TEXAS, INC. | -10.9% | 9 |
| Aug 5, 2026 | 0276-07-035F 2B26(011) | Frio San Antonio |
US 57:0276-07-035; OVUS 57 · Overlay | $8,663,166 | $7,430,847 | CLARK CONSTRUCTION OF TEXAS, INC. | -14.2% | 6 |
| Aug 5, 2026 | 1586-01-085F 2026(988) | Hidalgo Pharr |
158601085 FM 907 HIDALGO (REHAB)FM 907 · Rehabilitation of Existing Road | $6,597,423 | $6,373,927 | IOC COMPANY LLC | -3.4% | 7 |
| Aug 5, 2026 | 0173-04-059F 2026(861) | Kaufman Dallas |
SH 34 IH 20 EB to N of SH 243SH 34 · Rehabilitation of Existing Road | $7,199,790 | $6,242,701 | BIG CREEK CONSTRUCTION, LTD. | -13.3% | 7 |
| Aug 5, 2026 | 0092-06-111F 2026(991) | Navarro Dallas |
IH 45 E of US 287 to Ellis County LineIH 45 · Rehabilitation of Existing Road | $6,654,791 | $5,407,398 | ROY JORGENSEN ASSOCIATES, INC. | -18.7% | 6 |
| Aug 5, 2026 | 0186-03-071F 2026(880) | Burleson Bryan |
SH 36 F: S of SH 21 T: CR 122 -IOI FY 26SH 36 · Intersection & Operational Imprv | $5,320,689 | $4,987,865 | BIG CREEK CONSTRUCTION, LTD. | -6.3% | 6 |
| Aug 5, 2026 | 0916-00-254F 2026(844) | Nueces Corpus Christi |
FY 2026 DW Pavement MarkingsVarious · Traffic Control Devices | $5,148,857 | $4,763,993 | TRP INFRASTRUCTURE SERVICES, LLC | -7.5% | 6 |
| Aug 5, 2026 | 6505-55-001MMC - A00223098 | Hutchinson Amarillo |
FY 27 Amarillo Dist. Road and Brine SaltSH0207 · Material Maintenance Project | $4,090,043 | $4,484,629 | NSG LOGISTICS, LLC | +9.6% | 2 |
| Aug 5, 2026 | 6505-46-001RMC - A00223081 | Austin Maintenance Division |
YKM Debris Removal & DisposalIH0010 · Routine Maintenance Project - Sealed | $7,033,125 | $4,395,474 | AFTERMATH DISASTER RECOVERY INC | -37.5% | 3 |
| Aug 5, 2026 | 0050-05-071STP 2026(935)HES | Waller Houston |
BU 290H, From SH 159 to Warren Ranch _ ABU 290H · Safety Improvement Projects | $4,454,020 | $3,894,237 | ALBATROSS CONSTRUCTION LLC | -12.6% | 7 |
| Aug 5, 2026 | 0784-02-011F 2026(914) | Jasper Beaumont |
FM 1131-(FM 2246-FM 105) OVERLAYFM 1131 · Overlay | $3,763,964 | $3,276,381 | TEXAS MATERIALS GROUP, INC. | -13.0% | 1 |
| Aug 5, 2026 | 6505-22-001RMC - A00223027 | Eastland Brownwood |
OVERLAY EASTLAND COUNTYSH0006 · Routine Maintenance Project | $3,216,450 | $2,982,235 | BLACKSMITH VENTURES LLC | -7.3% | 9 |
| Aug 5, 2026 | 0014-03-103F 2026(888) | Johnson Fort Worth |
IH 35W; N of Woodbine Dr to S of CR 530BIH 35W · Bridge Replacement | $3,991,946 | $2,800,124 | FOUTSCO PAVING COMPANY, LLC | -29.9% | 8 |
| Aug 5, 2026 | 0918-47-401STP 2026(857)VRU | Dallas Dallas |
Collins Blvd From Campbell Rd to Alma RdE COLLINS BLVD · Safety Improvement Projects | $2,806,538 | $2,618,604 | WG ENGINEERING & CONSTRUCTION, LLC | -6.7% | 9 |
| Aug 5, 2026 | 0917-16-040BR 2024(177) | Leon Bryan |
CR 244 At Eads CreekCOUNTY ROAD 244 · Bridge Replacement | $2,078,040 | $2,572,458 | THK CONSTRUCTION LLC | +23.8% | 8 |
| Aug 5, 2026 | 1023-01-039STP 2026(911)HES | Chambers Beaumont |
2023 HSIP CURVE (FM 563) CHEVRONS, RSFM 563 · Safety Improvement Projects | $2,493,248 | $2,499,687 | HAYDEN PAVING, INC. | +0.3% | 3 |
| Aug 5, 2026 | 6501-08-001RMC - A00221284 | Tarrant Fort Worth |
FY27, Guard Rail, S TarrantIH0030 · Routine Maintenance Project - Sealed | $3,755,209 | $2,492,455 | AUSTIN BARRICADE COMPANY, L.L.C. | -33.6% | 4 |
| Aug 5, 2026 | 0150-02-043STP 2026(901)VRU | Llano Austin |
SH 29 from SH 71 to Zula Rd.SH 29 · Safety Improvement Projects | $2,487,668 | $2,462,865 | BIG CREEK CONSTRUCTION, LTD. | -1.0% | 6 |
| Aug 5, 2026 | 0902-00-336F 2026(984) | Tarrant Fort Worth |
FY25 Fort Worth District-wide ADA ProjecVarious · Pedestrian, Sidewalks & Curb Ramps | $2,655,169 | $2,193,008 | RATLIFF HARDSCAPE, LTD. | -17.4% | 7 |
| Aug 5, 2026 | 0922-00-080F 2B26(019) | Webb Laredo |
Districtwide Upgrade Rail 2027Various · Bridge Maintenance | $2,168,274 | $2,041,432 | LUCANIA CONTRACTORS LLC | -5.8% | 3 |
| Aug 5, 2026 | 6488-31-001BPM - A00217091 | Jasper Beaumont |
FY27 BPMUS0096 · Bridge Preventative Maintenance - Sealed | $2,126,165 | $1,880,325 | PATHFIELD INVESTMENTS LLC | -11.6% | 8 |
| Aug 5, 2026 | 1685-05-140STP 2026(618)HES | Harris Houston |
SH 6 - Memorial Dr to Westpark DrSH 6 · Safety Improvement Projects | $2,203,493 | $1,834,898 | STRUCTURAL INTEGRITY GROUP LLC | -16.7% | 13 |
| Aug 5, 2026 | 6504-80-001RMC - A00222908 | El Paso El Paso |
Rigid Pavement Repair EAO/VHIH0110 · Routine Maintenance Project | $2,430,000 | $1,772,400 | WINDING ROAD CONSTRUCTION, INC. | -27.1% | 6 |
| Aug 5, 2026 | 6504-94-001RMC - A00222959 | Live Oak Corpus Christi |
RMC6504-94-00 Striping Pavement MarkingsUS0281 · Routine Maintenance Project - Sealed | $2,430,922 | $1,742,362 | TRP INFRASTRUCTURE SERVICES, LLC | -28.3% | 3 |
| Aug 5, 2026 | 6489-35-001RMC - A00217363 | Ellis Dallas |
Sweeping and Debris Removal 09 07/26IH0035E · Routine Maintenance Project - Sealed | $1,809,328 | $1,667,621 | DIGG COMMERCIAL, LLC | -7.8% | 2 |
| Aug 5, 2026 | 0913-28-101BR 2B24(589) | Fayette Yoakum |
CR403 BRIDGE REPLACEMENT 2609FREYBURG ENGLE RD · Bridge Replacement | $1,710,089 | $1,617,207 | TREVWAY, INC. | -5.4% | 9 |
| Aug 5, 2026 | 6497-47-001RMC - A00219632 | Harris Houston |
6497-47-001 GUARDRAILSL0008 · Routine Maintenance Project - Sealed | $1,755,655 | $1,532,630 | RHINO EQUITY, LLC | -12.7% | 5 |
| Aug 5, 2026 | 0902-38-134BR 2021(736) | Parker Fort Worth |
CR 452/Dennis Rd: At Patrick CreekDENNIS RD · Bridge Replacement | $1,806,941 | $1,531,854 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -15.2% | 10 |
| Aug 5, 2026 | 0909-00-074STP 2026(933)VRUG | McLennan Waco |
SFT | Bosque Blvd @ N 34th StBOSQUE · Safety Improvement Projects | $1,849,456 | $1,517,538 | VACA UNDERGROUND UTILITIES INC | -17.9% | 4 |
| Aug 5, 2026 | 0050-06-108F 2026(851) | Harris Houston |
US 290 at Cypress CreekUS 290 · Culvert & Storm Drainage Work | $1,357,254 | $1,422,409 | DIGG COMMERCIAL, LLC | +4.8% | 7 |
| Aug 5, 2026 | 6496-31-001BPM - A00219217 | Bell Waco |
BPM - FY2027SH0036 · Bridge Preventative Maintenance - Sealed | $1,644,863 | $1,320,412 | SCR CIVIL CONSTRUCTION, LLC | -19.7% | 4 |
| Aug 5, 2026 | 0013-08-154STP 2026(887)HES | Wise Fort Worth |
HSIP Systemic Median BarrierUS 81 · Safety Improvement Projects | $1,221,714 | $1,237,814 | GRATIOT CONSTRUCTION, LTD. | +1.3% | 5 |
| Aug 5, 2026 | 6505-52-001MMC - A00223089 | Dallam Amarillo |
FY 27 Amarillo District FlexbaseUS0054 · Material Maintenance Project | $1,168,567 | $1,230,475 | HOLMES CONSTRUCTION CO., L.P. | +5.3% | 4 |
| Aug 5, 2026 | 0920-00-168F 2026(869) | Jefferson Beaumont |
FY 27-DISTRICT WIDE-PVMNT MARKINGSVarious · Traffic Control Devices | $2,290,290 | $1,165,774 | STRIPE-A-ZONE, LLC | -49.1% | 3 |
| Aug 5, 2026 | 1756-01-024F 2026(569) | Jackson Yoakum |
FM 3131 REHAB AND RESURFACE MBGF 2502FM 3131 · Restoration | $935,446 | $1,003,038 | CLARK CONSTRUCTION OF TEXAS, INC. | +7.2% | 3 |
| Aug 5, 2026 | 0047-03-106STP 2025(189)TAPS | Grayson Paris |
Hwy 5 SUP - Newport Drive to Hynds ParkSH 5 · Pedestrian, Sidewalks & Curb Ramps | $1,185,228 | $993,246 | XIT PAVING AND CONSTRUCTION INC. | -16.2% | 10 |
| Aug 5, 2026 | 0901-29-100BR 2026(207) | Lamar Paris |
CR 35080 Bridge ReplacementCOUNTY ROAD 35080 · Bridge Replacement | $815,967 | $800,948 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -1.8% | 8 |
| Aug 5, 2026 | 0095-04-079F 2026(859) | Kaufman Dallas |
US 80 at Big Brushy CreekUS 80 · Bridge Maintenance | $1,290,273 | $799,617 | SHALOM SERVICES CORPORATION | -38.0% | 10 |
| Aug 5, 2026 | 0237-06-054STP 2B26(020)HES | Duval Laredo |
SH 44 Safety IlluminationSH 44 · Traffic Control Devices | $970,873 | $779,408 | STRUCTURAL INTEGRITY GROUP LLC | -19.7% | 7 |
| Aug 5, 2026 | 0915-12-820F 2026(915) | Bexar San Antonio |
VA; 0915-12-820; IlluminationVarious · Safety Improvement Projects | $1,308,518 | $757,888 | ELECNOR BELCO ELECTRIC, INC. | -42.1% | 12 |
| Aug 5, 2026 | 0921-02-525STP 2026(871)HES | Hidalgo Pharr |
Hidalgo County - Left & Right Turn LanesE CANTON RD · Safety Improvement Projects | $833,832 | $757,002 | LUCANIA CONTRACTORS LLC | -9.2% | 4 |
| Aug 5, 2026 | 0907-00-239STP 2026(865)VRUG | Tom Green San Angelo |
0907-00-239 Ave N Traffic Signal ImproveAVE N · Safety Improvement Projects | $579,255 | $589,192 | E-Z BEL CONSTRUCTION, LLC | +1.7% | 3 |
| Aug 5, 2026 | 0320-05-018STP 2026(934)HES | Bell Waco |
IOI | @FM 438/Young AveSL 363 · Intersection & Operational Imprv | $536,406 | $523,303 | VACA UNDERGROUND UTILITIES INC | -2.4% | 7 |
| Aug 5, 2026 | 0902-90-286STP 2026(897)VRUG | Tarrant Fort Worth |
NW 25th St: At Clinton Ave25TH ST · Safety Improvement Projects | $563,798 | $498,027 | YUNEX LLC | -11.7% | 5 |
| Aug 5, 2026 | 0204-06-069F 2026(881) | Milam Bryan |
US 79 at CR 308 - Signal FY 26US 79 · Traffic Control Devices | $394,846 | $366,495 | LARRY YOUNG PAVING, INC. | -7.2% | 4 |
| Aug 5, 2026 | 0389-02-061STP 2026(917)HES | Chambers Beaumont |
2025 HSIP (SH 146) SIGNALS & BEACONSSH 146 · Safety Improvement Projects | $408,836 | $314,787 | DECO CONTRACTORS, INC. | -23.0% | 8 |
| Aug 5, 2026 | 0327-08-109F 2026(907) | Cameron Pharr |
2020 GCAA City of HarlingenBU 77X · Landscape & Scenic Enhancement | $224,192 | $240,952 | LUCANIA CONTRACTORS LLC | +7.5% | 6 |
| Aug 5, 2026 | 0249-08-046STP 2026(986)HES | Palo Pinto Fort Worth |
US 281: from FM 3027 to FM 3027US 281 · Safety Improvement Projects | $253,843 | $180,930 | VACA UNDERGROUND UTILITIES INC | -28.7% | 10 |
| Aug 5, 2026 | 0919-00-098F 2026(877) | Cass Atlanta |
FY 26 District Wildflower ProjectVarious · Landscape & Scenic Enhancement | $164,050 | $119,056 | CROSS PLUS CONSTRUCTION, LLC | -27.4% | 4 |
| Aug 4, 2026 | 6499-56-001RMC - A00220367 | Angelina Lufkin |
2026-08 Mill & Inlay (South)US0059 · Routine Maintenance Project | $925,727 | $845,925 | TEXAS MATERIALS GROUP, INC. | -8.6% | 3 |
| Aug 4, 2026 | 6497-80-001RMC - A00219817 | Nacogdoches Lufkin |
2026-08 Nacogdoches Mill & Inlay (North)US0059 · Routine Maintenance Project - Sealed | $672,888 | $593,777 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -11.8% | 3 |
| Aug 4, 2026 | 6506-75-001SUP - A00223418 | Panola Atlanta |
Grounds - Carthage FY 26BU0059D · State Use Project | $20,629 | — | 0 | ||
| Aug 4, 2026 | 6507-88-001SUP - A00223664 | McLennan Waco |
Janitorial - McLennan FY27SH0006 · State Use Project | $47,372 | — | 0 | ||
| Aug 4, 2026 | 6507-89-001SUP - A00223665 | McLennan Waco |
Lawn & Grounds - McLennan FY27SH0006 · State Use Project | $58,558 | — | 0 | ||
| Aug 4, 2026 | 6507-90-001SUP - A00223666 | McLennan Waco |
Litter Pickup - McLennanSH0006 · State Use Project | $215,441 | — | 0 | ||
| Aug 4, 2026 | 6507-91-001SUP - A00223667 | Hill Waco |
Janitorial - HillSH0022 · State Use Project | $21,658 | — | 0 | ||
| Aug 4, 2026 | 6507-92-001SUP - A00223668 | Hill Waco |
Lawn & Grounds - HillSH0022 · State Use Project | $17,280 | — | 0 | ||
| Aug 4, 2026 | 6507-93-001SUP - A00223669 | Hill Waco |
Picnic Area Maintenance - HillSH0022 · State Use Project | $78,540 | — | 0 | ||
| Aug 4, 2026 | 6507-94-001SUP - A00223670 | Falls Waco |
Janitorial - FallsSH0007 · State Use Project | $22,718 | — | 0 | ||
| Aug 4, 2026 | 6507-95-001SUP - A00223671 | Falls Waco |
Picnic Area Maintenance - FallsSH0007 · State Use Project | $104,720 | — | 0 | ||
| Aug 4, 2026 | 6507-96-001SUP - A00223672 | McLennan Waco |
Janitorial - District ComplexBU0077L · State Use Project | $200,930 | — | 0 | ||
| Aug 4, 2026 | 6507-97-001SUP - A00223673 | McLennan Waco |
Janitorial - Special CrewsFM0933 · State Use Project | $12,800 | — | 0 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.