| 1 | 104-7011 |
REMOV CONC (DRIVEWAYS) | 56 | SY |
$45.00 |
$20.00 |
$20.00 |
$70.00 |
$48.00 |
| 2 | 104-7013 |
REMOV CONC (SIDEWALK, RAMP OR SUP) | 91 | SY |
$85.00 |
$30.00 |
$20.00 |
$40.00 |
$48.00 |
| 3 | 105-7008 |
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV | 228 | SY |
$25.00 |
$35.00 |
$20.00 |
$50.00 |
$52.00 |
| 4 | 105-7014 |
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV | 633 | SY |
$25.00 |
$35.00 |
$20.00 |
$60.00 |
$59.00 |
| 5 | 110-7001 |
EXCAV (ROADWAY) | 920 | CY |
$37.00 |
$50.00 |
$16.00 |
$30.00 |
$64.00 |
| 6 | 112-7004 |
SUBGR WIDEN (DC) | 2,909 | SY |
$5.00 |
$6.00 |
$15.00 |
$10.00 |
$28.00 |
| 7 | 132-7006 |
EMBANK (FNL)(DC)(TY C) | 244 | CY |
$35.00 |
$80.00 |
$10.00 |
$15.00 |
$69.00 |
| 8 | 164-7007 |
BROADCAST SEED (TEMP_WARM_COOL) | 6,570 | SY |
$0.2500 |
$1.00 |
$0.2900 |
$2.00 |
$0.7500 |
| 9 | 168-7001 |
VEGETATIVE WATERING | 6.8 | TGL |
$8.00 |
$50.00 |
$100.00 |
$200.00 |
$350.00 |
| 10 | 247-7085 |
FL BS (CMP IN PLC)(TY E GR 4) (8") | 2,909 | SY |
$45.00 |
$31.00 |
$32.00 |
$30.00 |
$55.00 |
| 11 | 292-7017 |
TACK COAT | 244 | GAL |
$2.50 |
$10.00 |
$10.00 |
$30.00 |
$10.00 |
| 12 | 310-7004 |
PRIME COAT (MC-30) | 486 | GAL |
$10.00 |
$10.00 |
$10.00 |
$30.00 |
$13.00 |
| 13 | 341-7043 |
D-GR HMA TY-D PG64-22 | 269 | TON |
$175.00 |
$270.00 |
$300.00 |
$125.00 |
$380.00 |
| 14 | 432-7001 |
RIPRAP (CONC)(4 IN) | 25 | CY |
$800.00 |
$600.00 |
$550.00 |
$1,500.00 |
$580.00 |
| 15 | 464-7003 |
RC PIPE (CL III)(18 IN) | 88 | LF |
$200.00 |
$100.00 |
$0.00 |
$0.00 |
$0.00 |
| 16 | 464-7005 |
RC PIPE (CL III)(24 IN) | 94 | LF |
$160.00 |
$105.00 |
$0.00 |
$0.00 |
$0.00 |
| 17 | 467-7308 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 4 | EA |
$2,000.00 |
$2,000.00 |
$3,500.00 |
$3,000.00 |
$2,900.00 |
| 18 | 467-7324 |
SET (TY II) (24 IN) (CMP) (6: 1) (P) | 1 | EA |
$2,000.00 |
$3,000.00 |
$3,750.00 |
$3,500.00 |
$3,500.00 |
| 19 | 479-7001 |
ADJUSTING MANHOLES | 1 | EA |
$2,500.00 |
$2,000.00 |
$1,200.00 |
$15,000.00 |
$3,900.00 |
| 20 | 496-7004 |
REMOV STR (SET) | 1 | EA |
$800.00 |
$500.00 |
$500.00 |
$2,200.00 |
$800.00 |
| 21 | 496-7007 |
REMOV STR (PIPE) | 104 | LF |
$30.00 |
$25.00 |
$30.00 |
$40.00 |
$39.00 |
| 22 | 500-7001 |
MOBILIZATION | 1 | LS |
$70,348.39 |
$71,000.00 |
$75,000.00 |
$62,000.00 |
$150,000.00 |
| 23 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 | MO |
$4,000.00 |
$2,000.00 |
$5,500.00 |
$500.00 |
$2,158.00 |
| 24 | 505-7001 |
TMA (STATIONARY) | 307 | DAY |
$200.00 |
$1.00 |
$200.00 |
$72.00 |
$300.00 |
| 25 | 506-7020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 468 | SY |
$30.00 |
$20.00 |
$30.00 |
$50.00 |
$95.00 |
| 26 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 468 | SY |
$12.50 |
$4.00 |
$5.00 |
$30.00 |
$2.00 |
| 27 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 2,855 | LF |
$3.10 |
$5.00 |
$5.00 |
$4.00 |
$5.75 |
| 28 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 2,855 | LF |
$1.10 |
$2.00 |
$1.00 |
$1.00 |
$2.00 |
| 29 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 465 | LF |
$5.00 |
$8.00 |
$10.00 |
$6.00 |
$9.00 |
| 30 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 465 | LF |
$2.00 |
$2.00 |
$1.00 |
$2.00 |
$2.00 |
| 31 | 508-7001 |
CONSTRUCTING DETOURS | 560 | SY |
$80.00 |
$165.00 |
$55.00 |
$180.00 |
$120.00 |
| 32 | 510-7001 |
ONE-WAY TRAF CONT (FLAGGER CONT) | 48 | HR |
$225.00 |
$15.00 |
$85.00 |
$441.00 |
$41.00 |
| 33 | 529-7009 |
CONC CURB & GUTTER (TY II) | 989 | LF |
$39.00 |
$35.00 |
$12.00 |
$51.00 |
$55.00 |
| 34 | 530-7008 |
DRIVEWAYS (CONC) (TY 1) | 50 | SY |
$175.00 |
$110.00 |
$75.00 |
$420.00 |
$133.00 |
| 35 | 530-7010 |
DRIVEWAYS (ACP) | 155 | SY |
$155.00 |
$80.00 |
$80.00 |
$165.00 |
$120.00 |
| 36 | 530-7018 |
TURNOUTS (ACP) | 89 | SY |
$125.00 |
$80.00 |
$80.00 |
$250.00 |
$120.00 |
| 37 | 531-7003 |
CONC SIDEWALKS (6") | 30 | SY |
$150.00 |
$120.00 |
$75.00 |
$450.00 |
$134.00 |
| 38 | 531-7010 |
CURB RAMPS (TY 7) | 7 | EA |
$3,200.00 |
$2,900.00 |
$1,350.00 |
$5,000.00 |
$2,800.00 |
| 39 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 1 | EA |
$750.00 |
$990.00 |
$1,300.00 |
$2,500.00 |
$1,200.00 |
| 40 | 644-7002 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | 7 | EA |
$750.00 |
$1,140.00 |
$1,300.00 |
$2,200.00 |
$1,400.00 |
| 41 | 644-7004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 1 | EA |
$750.00 |
$1,260.00 |
$1,600.00 |
$3,000.00 |
$1,520.00 |
| 42 | 644-7065 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 5 | EA |
$500.00 |
$900.00 |
$1,300.00 |
$2,800.00 |
$1,080.00 |
| 43 | 644-7073 |
REMOVE SM RD SN SUP&AM | 3 | EA |
$200.00 |
$360.00 |
$300.00 |
$700.00 |
$440.00 |
| 44 | 662-7075 |
WK ZN PAV MRK REMOV (W)12"(SLD) | 91 | LF |
$6.00 |
$5.75 |
$5.50 |
$8.00 |
$7.00 |
| 45 | 662-7077 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 52 | LF |
$15.00 |
$11.75 |
$30.00 |
$28.00 |
$15.00 |
| 46 | 662-7098 |
WK ZN PAV MRK REMOV (Y)6"(BRK) | 101 | LF |
$1.50 |
$1.50 |
$4.00 |
$3.00 |
$2.00 |
| 47 | 662-7100 |
WK ZN PAV MRK REMOV (Y)6"(SLD) | 4,770 | LF |
$1.50 |
$1.50 |
$2.00 |
$1.00 |
$2.00 |
| 48 | 662-7103 |
WK ZN PAV MRK REMOV (Y)12"(SLD) | 48 | LF |
$20.00 |
$4.75 |
$5.50 |
$6.00 |
$6.00 |
| 49 | 666-7018 |
REFL PAV MRK TY I (W)8"(DOT)(100MIL) | 156 | LF |
$2.00 |
$4.75 |
$6.00 |
$6.00 |
$6.00 |
| 50 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 1,090 | LF |
$1.25 |
$2.75 |
$3.00 |
$2.00 |
$4.00 |
| 51 | 666-7270 |
RE PROFILE PM TY I(Y)6"(SLD)(100MIL) | 4,612 | LF |
$2.00 |
$2.00 |
$2.00 |
$1.00 |
$3.00 |
| 52 | 666-7347 |
PAVEMENT SLER 6" | 1,452 | LF |
$0.7500 |
$0.7500 |
$2.00 |
$1.00 |
$1.00 |
| 53 | 666-7352 |
PAVEMENT SLER 24" | 42 | LF |
$1.50 |
$3.50 |
$12.00 |
$11.00 |
$5.00 |
| 54 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 2,944 | LF |
$3.00 |
$1.00 |
$3.00 |
$2.00 |
$2.00 |
| 55 | 668-7089 |
PREFAB PM TY C (W)(24")(SLD) | 496 | LF |
$14.00 |
$17.00 |
$20.00 |
$19.00 |
$21.00 |
| 56 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 11 | EA |
$240.00 |
$288.00 |
$200.00 |
$194.00 |
$346.00 |
| 57 | 668-7093 |
PREFAB PM TY C (W)(DBL ARROW) | 5 | EA |
$325.00 |
$500.00 |
$400.00 |
$388.00 |
$605.00 |
| 58 | 668-7103 |
PREFAB PM TY C (W)(WORD) | 11 | EA |
$250.00 |
$288.00 |
$300.00 |
$277.00 |
$346.00 |
| 59 | 668-7125 |
PREFAB PM TY C (Y)(12")(SLD) | 43 | LF |
$8.00 |
$8.00 |
$40.00 |
$33.00 |
$10.00 |
| 60 | 672-7002 |
REFL PAV MRKR TY I-C | 74 | EA |
$5.00 |
$5.75 |
$20.00 |
$17.00 |
$7.00 |
| 61 | 672-7004 |
REFL PAV MRKR TY II-A-A | 104 | EA |
$7.00 |
$5.25 |
$20.00 |
$17.00 |
$7.00 |
| 62 | 678-7002 |
PAV SURF PREP FOR MRK (6") | 7,556 | LF |
$1.00 |
$0.1500 |
$1.00 |
$0.2500 |
$0.2500 |
| 63 | 678-7004 |
PAV SURF PREP FOR MRK (8") | 1,246 | LF |
$1.00 |
$0.2500 |
$1.00 |
$0.2500 |
$0.5000 |
| 64 | 678-7006 |
PAV SURF PREP FOR MRK (12") | 43 | LF |
$1.00 |
$1.20 |
$15.00 |
$11.00 |
$1.50 |
| 65 | 678-7008 |
PAV SURF PREP FOR MRK (24") | 496 | LF |
$2.75 |
$2.00 |
$5.00 |
$3.00 |
$2.50 |
| 66 | 678-7009 |
PAV SURF PREP FOR MRK (ARROW) | 11 | EA |
$40.00 |
$6.00 |
$100.00 |
$83.00 |
$8.00 |
| 67 | 678-7010 |
PAV SURF PREP FOR MRK (DBL ARROW) | 5 | EA |
$40.00 |
$6.00 |
$200.00 |
$139.00 |
$8.00 |
| 68 | 678-7016 |
PAV SURF PREP FOR MRK (WORD) | 11 | EA |
$40.00 |
$6.00 |
$80.00 |
$83.00 |
$8.00 |
| 69 | 685-7002 |
RELOCATE RDSD FLASH BEACON ASSEMBLY | 1 | EA |
$8,000.00 |
$7,500.00 |
$15,000.00 |
$2,061.00 |
$2,000.00 |
| 70 | 685-7005 |
RELOCT RDSD FLSH BCN AM (SOLAR PWRD) | 1 | EA |
$5,000.00 |
$10,000.00 |
$5,200.00 |
$2,290.00 |
$2,200.00 |
| 71 | 687-7003 |
RELOCATE PED POLE ASSEMBLY | 1 | EA |
$5,000.00 |
$1,000.00 |
$1,500.00 |
$1,680.00 |
$1,600.00 |
| 72 | 690-7031 |
REPLACE OF PEDESTRIAN PUSH BUTTONS | 2 | EA |
$175.00 |
$700.00 |
$2,500.00 |
$99.00 |
$94.00 |
| 73 | 6066-7001 |
LED ROADSIDE SIGN | 1 | EA |
$5,500.00 |
$5,000.00 |
$5,000.00 |
$640.00 |
$38.00 |
| 74 | 468-7001 |
THERMOPLASTIC PIPE (PP) (18") | 0 | LF |
$200.01 |
$0.00 |
$80.00 |
$180.00 |
$91.00 |
| 75 | 468-7002 |
THERMOPLASTIC PIPE (PP) (24") | 0 | LF |
$160.01 |
$0.00 |
$110.00 |
$200.00 |
$116.00 |