18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jan 16, 2025 | 6477-52-001MMC - A00213061 | Hale Lubbock |
2025 Plainview AggregateIH0027 · Material Maintenance Project | $297,500 | $300,000 | TOUCHSTONE RESOURCES, LLC | +0.8% | 3 |
| Jan 16, 2025 | 6475-19-001RMC - A00212512 | Hunt Paris |
ROW Mowing Hunt Co. FY25SH0011 · Routine Maintenance Project - Sealed | $353,414 | $291,999 | USA AMTECH, INC. | -17.4% | 8 |
| Jan 16, 2025 | 6369-25-001BPM - A00155357 | Bexar San Antonio |
FM 1535 AT DRAW / SH 16 AT COMANCHE CRKFM1535 · Bridge Preventative Maintenance - Sealed | $251,787 | $218,588 | DIAMOND R CONTRACTING, LLC | -13.2% | 8 |
| Jan 16, 2025 | 6477-53-001MMC - A00213062 | Lamb Lubbock |
2025 Littlefield AggregateUS0084 · Material Maintenance Project | $204,000 | $209,100 | DIGG COMMERCIAL, LLC | +2.5% | 3 |
| Jan 16, 2025 | 6466-75-001BPM - A00209399 | Red River Paris |
BPM Red River FY25FM1159 · Bridge Preventative Maintenance - Sealed | $208,978 | $164,232 | CATOCON, INC. | -21.4% | 6 |
| Jan 16, 2025 | 6462-36-001BPM - A00206347 | Medina San Antonio |
FY25 BPM FM 2200 AT PARKER CREEK NO. 3FM2200 · Bridge Preventative Maintenance - Sealed | $198,876 | $149,921 | DIAMOND R CONTRACTING, LLC | -24.6% | 8 |
| Jan 16, 2025 | 6479-74-001SUP - A00213917 | Mitchell Abilene |
Mitchell Co. Janitorial ServiceSH0208 · State Use Project | $28,932 | — | 0 | ||
| Jan 16, 2025 | 6479-69-001SUP - A00213894 | Nolan Abilene |
Nolan Co. Picnic Area and LandscapingSH0070 · State Use Project | $28,560 | — | 0 | ||
| Jan 16, 2025 | 6479-70-001SUP - A00213898 | Scurry Abilene |
Scurry Co. Picnic Area and LandscapingUS0084 · State Use Project | $38,808 | — | 0 | ||
| Jan 16, 2025 | 6479-73-001SUP - A00213916 | Nolan Abilene |
Nolan Co. Janitorial ServiceIH0020 · State Use Project | $25,956 | — | 0 | ||
| Jan 15, 2025 | 6477-47-001RMC - A00213056 | Victoria Yoakum |
Spot RepairsUS0077 · Routine Maintenance Project - Sealed | $999,500 | $998,424 | HUNTER INDUSTRIES, LTD. | -0.1% | 2 |
| Jan 15, 2025 | 6459-12-001RMC - A00205547 | Brazos Bryan |
FY24 District Cross Drainage -12SH0006 · Routine Maintenance Project - Sealed | $896,350 | $873,661 | LAKEY, INC. | -2.5% | 2 |
| Jan 15, 2025 | 6476-14-001RMC - A00212757 | Kaufman Dallas |
Vegetation Management (North) 06 0125IH0020 · Routine Maintenance Project - Sealed | $954,908 | $806,315 | CROSS PLUS CONSTRUCTION, LLC | -15.6% | 2 |
| Jan 15, 2025 | 6467-44-001RMC - A00209695 | Dallas Dallas |
FLEXIBLE PAVEMENT REPAIR 02 0125SH0114 · Routine Maintenance Project - Sealed | $983,771 | $800,466 | FOUTSCO PAVING COMPANY, LLC | -18.6% | 4 |
| Jan 15, 2025 | 6471-91-001BPM - A00211695 | Ellis Dallas |
Bridge Preventative Maintenance 09 1024IH0045 · Bridge Preventative Maintenance - Sealed | $928,400 | $733,230 | PATHFIELD INVESTMENTS LLC | -21.0% | 10 |
| Jan 15, 2025 | 6471-42-001RMC - A00211558 | San Jacinto Lufkin |
2024-11 San Jacinto On Call TrafficUS0059 · Routine Maintenance Project - Sealed | $811,043 | $681,105 | RHINO EQUITY, LLC | -16.0% | 2 |
| Jan 15, 2025 | 6475-43-001RMC - A00212556 | Collin Dallas |
Mowing Highway Right of Way (E) 07 0125US0380 · Routine Maintenance Project - Sealed | $832,182 | $630,208 | GARRET SHIELDS INFRASTRUCTURE | -24.3% | 7 |
| Jan 15, 2025 | 6468-11-001MMC - A00210078 | Bastrop Austin |
FY25 East LRASH0021 · Material Maintenance Project | $654,000 | $618,846 | MARTIN MARIETTA MATERIALS, INC. | -5.4% | 2 |
| Jan 15, 2025 | 6476-28-001RMC - A00212775 | Kaufman Dallas |
Vegetation Management (South) 06 0125US0175 · Routine Maintenance Project - Sealed | $695,944 | $617,233 | JASCO | -11.3% | 2 |
| Jan 15, 2025 | 6469-65-001RMC - A00210578 | Denton Dallas |
Herbicide 04 0125IH0035 · Routine Maintenance Project - Sealed | $585,575 | $542,325 | ANTHONY SERVICES | -7.4% | 3 |
| Jan 15, 2025 | 6478-06-001MMC - A00213194 | Brazos Bryan |
FY25 Brazos HMA -01SH0006 · Material Maintenance Project | $595,000 | $492,500 | TEXAS MATERIALS GROUP, INC. | -17.2% | 2 |
| Jan 15, 2025 | 6478-07-001MMC - A00213195 | Grimes Bryan |
FY25 Grimes HMA -01SH0006 · Material Maintenance Project | $502,000 | $459,000 | VULCAN CONSTRUCTION MATERIALS, LLC | -8.6% | 2 |
| Jan 15, 2025 | 6469-69-001RMC - A00210585 | Denton Dallas |
On Call traffic Control FY 25 Denton COIH0035E · Routine Maintenance Project - Sealed | $808,480 | $438,010 | AWP SAFETY | -45.8% | 5 |
| Jan 15, 2025 | 6475-40-001RMC - A00212550 | Collin Dallas |
Mowing Highway Right of Way 07 0125US0075 · Routine Maintenance Project - Sealed | $559,760 | $415,315 | ORTEGA'S LAWN AND LANDSCAPING, LLC | -25.8% | 5 |
| Jan 15, 2025 | 6476-36-001RMC - A00212786 | Rockwall Dallas |
Vegetation Management Rockwall 01 2025IH0030 · Routine Maintenance Project - Sealed | $458,542 | $412,981 | ABESCAPE GROUP LLC | -9.9% | 4 |
| Jan 15, 2025 | 6471-45-001RMC - A00211561 | Navarro Dallas |
Herbicide 01 0125IH0045 · Routine Maintenance Project - Sealed | $585,359 | $375,060 | CROSS PLUS CONSTRUCTION, LLC | -35.9% | 3 |
| Jan 15, 2025 | 6477-21-001RMC - A00212965 | Childress Childress |
FY25 MBGF RepairUS0287 · Routine Maintenance Project - Sealed | $481,100 | $331,022 | BK FIELD OPERATIONS LLC | -31.2% | 4 |
| Jan 15, 2025 | 6468-12-001RMC - A00210080 | Williamson Austin |
FY25 Williamson County MowingSH0195 · Routine Maintenance Project - Sealed | $378,254 | $294,003 | CROSS PLUS CONSTRUCTION, LLC | -22.3% | 3 |
| Jan 15, 2025 | 6475-13-001RMC - A00212504 | Bowie Atlanta |
Callout Prefabr Pavement MarkingsUS0059 · Routine Maintenance Project - Sealed | $275,250 | $249,768 | STRIPE-A-ZONE, LLC | -9.3% | 4 |
| Jan 15, 2025 | 6478-24-001RMC - A00213240 | Austin Yoakum |
On Call Sweeping, IH 10IH0010 · Routine Maintenance Project | $227,589 | $249,529 | T & M LAWN-FENCE SERVICE, LLC | +9.6% | 1 |
| Jan 15, 2025 | 6476-15-001RMC - A00212758 | Burleson Bryan |
FY25 - Burleson Mowing -01FM0060 · Routine Maintenance Project | $305,452 | $235,673 | USA AMTECH, INC. | -22.8% | 7 |
| Jan 15, 2025 | 6472-82-001BPM - A00212049 | Navarro Dallas |
BPM FM709 01 0125FM0709 · Bridge Preventative Maintenance - Sealed | $284,900 | $223,095 | RHINO EQUITY, LLC | -21.7% | 7 |
| Jan 15, 2025 | 6473-28-001RMC - A00212176 | San Jacinto Lufkin |
2024-11 San Jacinto MBGFUS0059 · Routine Maintenance Project - Sealed | $229,740 | $143,895 | ABOVE ALL CONTRACTING LLC | -37.4% | 4 |
| Jan 15, 2025 | 6475-50-001RMC - A00212577 | San Augustine Lufkin |
2024-11 San Augustine MBGFUS0096 · Routine Maintenance Project - Sealed | $177,895 | $123,070 | ACE CONTRACTORS, INC. | -30.8% | 3 |
| Jan 15, 2025 | 6469-52-001MMC - A00210537 | Denton Dallas |
Aggregate 04 0125US0380 · Material Maintenance Project | $74,700 | $89,874 | USA AMTECH, INC. | +20.3% | 2 |
| Jan 15, 2025 | 6478-25-001RMC - A00213242 | Gonzales Yoakum |
On Call Sweeping - IH 10IH0010 · Routine Maintenance Project | $31,000 | $29,913 | SWEEPING CORPORATION OF AMERICA, LLC | -3.5% | 2 |
| Jan 15, 2025 | 6479-72-001SUP - A00213915 | Oldham Amarillo |
FY 25 Vega JanitorialIH0040 · State Use Project | $7,900 | — | 0 | ||
| Jan 14, 2025 | 6477-65-001RMC - A00213086 | Kleberg Corpus Christi |
6477-65-001 Flex Pavement Structure ReprFM1356 · Routine Maintenance Project - Sealed | $960,596 | $898,358 | ANDERSON COLUMBIA CO., INC. | -6.5% | 3 |
| Jan 14, 2025 | 6478-08-001MMC - A00213196 | Madison Bryan |
FY25 Madison HMA -01IH0045 · Material Maintenance Project | $780,000 | $880,000 | TOUCHSTONE RESOURCES, LLC | +12.8% | 2 |
| Jan 14, 2025 | 6474-47-001MMC - 647447001 | Fort Bend Houston |
MMC 6474-47-001 HOTMIX and ASBSH0036 · Material Maintenance Project - Sealed | $783,600 | $714,700 | TEXAS MATERIALS GROUP, INC. | -8.8% | 4 |
| Jan 14, 2025 | 6474-68-001BPM - A00212419 | Ector Odessa |
6474-68-001 BPMIH0020 · Bridge Preventative Maintenance - Sealed | $765,225 | $686,631 | ICOS MANAGEMENT, LLC | -10.3% | 4 |
| Jan 14, 2025 | 6474-50-001RMC - 647450001 | Montgomery Houston |
RMC 6474-50-001 Sweeping CountyIH0045 · Routine Maintenance Project - Sealed | $813,133 | $673,876 | SWEEPING CORPORATION OF AMERICA, LLC | -17.1% | 3 |
| Jan 14, 2025 | 6471-93-001RMC - 647193001 | Harris Houston |
FY 24, CCA Replacement, N HarrisIH0069 · Routine Maintenance Project - Sealed | $568,175 | $516,859 | ROY JORGENSEN ASSOCIATES, INC. | -9.0% | 6 |
| Jan 14, 2025 | 6380-98-001RMC - A00176523 | Brazoria Houston |
FY 2025 Brazoria Sign UpgradesSH0288 · Routine Maintenance Project - Sealed | $582,370 | $475,750 | HAZMAT INTERNATIONAL, INC. | -18.3% | 3 |
| Jan 14, 2025 | 6478-26-001RMC - A00213243 | Walker Bryan |
FY25 Walker/Madison MBGF -01SH0030 · Routine Maintenance Project - Sealed | $702,175 | $465,520 | ROSS SA ENTERPRISE LLC | -33.7% | 4 |
| Jan 14, 2025 | 6476-84-001BPM - A00212884 | Live Oak Corpus Christi |
6476-84-001 Conc. Struc. RepairUS0059 · Bridge Preventative Maintenance - Sealed | $537,422 | $456,790 | RHINO EQUITY, LLC | -15.0% | 6 |
| Jan 14, 2025 | 6478-53-001MMC - A00213389 | Bee Corpus Christi |
6478-53-001 LRA Beeville MaintUS0181 · Material Maintenance Project | $415,750 | $416,750 | USA AMTECH, INC. | +0.2% | 3 |
| Jan 14, 2025 | 6474-41-001BPM - A00212379 | Fort Bend Houston |
BPM 6474-41 Bridge Deck RepairUS0059 · Bridge Preventative Maintenance - Sealed | $432,225 | $409,700 | ISI CONTRACTING, INC. | -5.2% | 2 |
| Jan 14, 2025 | 6478-54-001MMC - A00213391 | Karnes Corpus Christi |
6478-54-001 LRA Karnes MaintUS0181 · Material Maintenance Project | $330,000 | $330,690 | MARTIN MARIETTA MATERIALS, INC. | +0.2% | 2 |
| Jan 14, 2025 | 6477-98-001RMC - A00213175 | Leon Bryan |
FY25 Leon Mowing -01US0079 · Routine Maintenance Project | $358,000 | $292,187 | AABA MOWING CONTRACTORS, LIMITED LIABILITY COMPANY | -18.4% | 4 |
| Jan 14, 2025 | 6477-79-001MMC - A00213122 | Atascosa San Antonio |
2025 Atascosa LRAIH0037 · Material Maintenance Project | $284,600 | $283,760 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.3% | 3 |
| Jan 14, 2025 | 6478-57-001MMC - A00213395 | Nueces Corpus Christi |
6478-57-001 LRA Robstown Maint.US0077 · Material Maintenance Project | $295,400 | $279,530 | USA AMTECH, INC. | -5.4% | 3 |
| Jan 14, 2025 | 6477-80-001MMC - A00213123 | Bandera San Antonio |
2025 Bandera LRASH0016 · Material Maintenance Project | $271,992 | $276,288 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.6% | 4 |
| Jan 14, 2025 | 6477-76-001MMC - A00213119 | Bexar San Antonio |
2025 Bexar LRAIH0010 · Material Maintenance Project | $268,150 | $271,723 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.3% | 4 |
| Jan 14, 2025 | 6477-77-001MMC - A00213120 | Guadalupe San Antonio |
2025 Guadalupe LRAIH0010 · Material Maintenance Project | $274,000 | $265,150 | VULCAN CONSTRUCTION MATERIALS, LLC | -3.2% | 4 |
| Jan 14, 2025 | 6477-81-001MMC - A00213124 | Medina San Antonio |
2025 Medina HMAUS0090 · Material Maintenance Project | $240,000 | $224,850 | LONE STAR PAVING COMPANY | -6.3% | 6 |
| Jan 14, 2025 | 6478-02-001MMC - A00213188 | Brazos Bryan |
FY25 Bryan AO Emulsion -01SH0006 · Material Maintenance Project | $246,000 | $205,640 | MARTIN RESOURCE MANAGEMENT CORPORATION | -16.4% | 3 |
| Jan 14, 2025 | 6478-56-001MMC - A00213394 | Nueces Corpus Christi |
6478-56-001 Aggregate CCAOSH0358 · Material Maintenance Project | $193,000 | $191,270 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.9% | 5 |
| Jan 14, 2025 | 6478-61-001MMC - A00213402 | San Patricio Corpus Christi |
6478-61-001 Emulsion Sinton Area OfficeUS0181 · Material Maintenance Project | $167,500 | $181,140 | ERGON ASPHALT & EMULSIONS, INC. | +8.1% | 1 |
| Jan 14, 2025 | 6477-18-001MMC - A00212945 | Pecos Odessa |
6477-18-001 EmulsionBI0010G · Material Maintenance Project | $157,500 | $124,200 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -21.1% | 3 |
| Jan 14, 2025 | 6477-82-001MMC - A00213125 | Comal San Antonio |
2025 Comal LRAIH0035 · Material Maintenance Project | $104,500 | $107,960 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.3% | 3 |
| Jan 14, 2025 | 6477-78-001MMC - A00213121 | Bexar San Antonio |
2025 Bexar HMCLIH0010 · Material Maintenance Project | $65,700 | $64,800 | TEXAS MATERIALS GROUP, INC. | -1.4% | 4 |
| Jan 13, 2025 | 6471-76-001RMC - A00211665 | Palo Pinto Fort Worth |
FY25, Long Line, Palo PintoIH0020 · Routine Maintenance Project - Sealed | $638,676 | $294,433 | STRIPING TECHNOLOGY, L.P. | -53.9% | 5 |
| Jan 12, 2025 | 6479-17-001SUP - A00213826 | Fort Bend Houston |
2025 Janitorial Maintenance Special JobsSH0006 · State Use Project | $25,082 | — | 0 | ||
| Jan 10, 2025 | 6479-56-001SUP - A00213879 | Mason Austin |
Mason Maintenance Litter FY25US0087 · State Use Project | $181,744 | — | 0 | ||
| Jan 9, 2025 | 6473-02-001RMC - A00212100 | Jefferson Beaumont |
FY 25 Illumination RMCIH0010 · Routine Maintenance Project | $745,001 | $904,884 | TRAF-TEX, INC. | +21.5% | 2 |
| Jan 9, 2025 | 6477-97-001MMC - A00213174 | La Salle Laredo |
Limestone Rock Asphalt La SalleIH0035 · Material Maintenance Project - Sealed | $788,334 | $825,670 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.7% | 1 |
| Jan 9, 2025 | 6478-85-001SUP - A00213660 | Wise Fort Worth |
Picnic Area Maintenance J&W FY2025US0380 · State Use Project | $80,565 | — | 0 | ||
| Jan 8, 2025 | 0196-02-126F 2025(346) | Denton Dallas |
IH 35E AT CORPORATE DRIVE.IH 35E · Interchange (New or Reconstructed) | $202,715,258 | $217,964,539 | SEMA CONSTRUCTION, INC. | +7.5% | 4 |
| Jan 8, 2025 | 0258-09-147BR 2025(387) | McLennan Waco |
BR Repl | AT LAKE WACO | -1SH 6 · Bridge Replacement | $71,476,057 | $113,740,588 | ORION CONSTRUCTION, LLC | +59.1% | 3 |
| Jan 8, 2025 | 0461-04-026C 461-4-26 | Cochran Lubbock |
SH 214 Sup 2 Morton to YoakumSH 214 · Super-2 Highway | $37,873,977 | $28,894,124 | JAMES HAMILTON CONSTRUCTION CO. | -23.7% | 5 |
| Jan 8, 2025 | 0076-07-040C 76-7-40 | Upton Odessa |
US67_REAGAN_C/L_E_OF_CR225US 67 · Super-2 Highway | $20,376,775 | $13,723,466 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -32.7% | 4 |
| Jan 8, 2025 | 6470-18-001RMC - 647018001 | Harris Houston |
Metro Mowing 25IH0610 · Routine Maintenance Project - Sealed | $12,218,920 | $12,667,795 | CENTRAL NORTH CONSTRUCTION, LLC | +3.7% | 4 |
| Jan 8, 2025 | 2054-01-018STP 2025(348)HES | Denton Dallas |
FM 2164 from Milam Rd to North of SL 288FM 2164 · Safety Improvement Projects | $10,474,532 | $9,988,206 | EUROVIA ATLANTIC COAST LLC | -4.6% | 5 |
| Jan 8, 2025 | 0192-04-111STP 2B24(534)HES | Galveston Houston |
SH 6, From CL To IH 45SH 6 · Safety Improvement Projects | $9,795,445 | $9,176,025 | SICE, INC. | -6.3% | 5 |
| Jan 8, 2025 | 0337-01-051F 2025(408) | Williamson Austin |
SH 29 from US 183 to Jack NicklausSH 29 · Overlay | $10,308,576 | $9,163,865 | LONE STAR PAVING COMPANY | -11.1% | 3 |
| Jan 8, 2025 | 0164-04-165F 2025(342) | Smith Tyler |
SH 31, HRDN CL - FM 206SH 31 · Overlay | $9,363,511 | $7,385,033 | EAST TEXAS BRIDGE, INC. | -21.1% | 3 |
| Jan 8, 2025 | 2208-01-071BR 2025(354) | Tarrant Fort Worth |
SS 303; SP 303/RUSH CRK RELIEFSS 303 · Bridge Replacement | $8,152,678 | $7,221,685 | IBCTX, LLC | -11.4% | 7 |
| Jan 8, 2025 | 0013-13-007C 13-13-7 | Montague Wichita Falls |
SH 101, US 81 to FM1749SH 101 · Widen Non-Freeway | $7,950,754 | $6,806,246 | EUROVIA ATLANTIC COAST LLC | -14.4% | 4 |
| Jan 8, 2025 | 0642-02-018C 642-2-18 | Hunt Paris |
FM 36 RehabFM 36 · Rehabilitation of Existing Road | $7,766,224 | $6,730,504 | CDM HOLDINGS | -13.3% | 3 |
| Jan 8, 2025 | 0089-15-018C 89-15-18 | Wharton Yoakum |
BU 59-S SURFACING RESTORATION 2022BU 59S · Overlay | $7,348,061 | $6,366,588 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -13.4% | 5 |
| Jan 8, 2025 | 6477-32-001RMC - 647732001 | Comal San Antonio |
FY 25 COMAL ROUTINE MAINTENANCEIH0035 · Routine Maintenance Project - Sealed | $8,636,623 | $6,284,857 | GARRET SHIELDS INFRASTRUCTURE | -27.2% | 2 |
| Jan 8, 2025 | 0066-04-084C 66-4-84 | Moore Amarillo |
US 287 Moore Co Cable Median Barrier - 2US 287 · Safety Improvement Projects | $5,971,613 | $5,565,020 | HJC FARMS, INC. | -6.8% | 4 |
| Jan 8, 2025 | 6473-63-001RMC - A00212242 | Harris Houston |
IH 45 General Maintenance FY 25IH0045 · Routine Maintenance Project - Sealed | $4,692,797 | $4,290,486 | ISI CONTRACTING, INC. | -8.6% | 2 |
| Jan 8, 2025 | 0114-04-078F 2025(406) | Bastrop Austin |
US 290 from SH 95 to FM 696 OverlayUS 290 · Overlay | $5,495,945 | $4,270,055 | TEXAS MATERIALS GROUP, INC. | -22.3% | 6 |
| Jan 8, 2025 | 0260-04-005F 2025(349) | Ellis Dallas |
SS 77 From US 67 to BS 287QSS 73 · Rehabilitation of Existing Road | $4,366,409 | $3,784,310 | TEXAS MATERIALS GROUP, INC. | -13.3% | 5 |
| Jan 8, 2025 | 0978-01-043STP 2B24(537)HES | Galveston Houston |
FM 517, FM 646 to OwensFM 517 · Safety Improvement Projects | $2,495,103 | $3,005,355 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | +20.5% | 7 |
| Jan 8, 2025 | 0921-02-492BR 2024(490) | Hidalgo Pharr |
Mile 1 West Rd. - 0921-02-4921 MILE RD W · Bridge Replacement | $3,497,309 | $2,537,955 | TEXAS CORDIA CONSTRUCTION, LLC | -27.4% | 4 |
| Jan 8, 2025 | 0906-00-246C 906-00-246 | Ector Odessa |
Bridge Maintenance (2025) - FSAOVarious · Bridge Maintenance | $3,069,930 | $2,477,220 | PATHFIELD INVESTMENTS LLC | -19.3% | 8 |
| Jan 8, 2025 | 0218-01-108C 218-1-108 | Bowie Atlanta |
US 59 from S of FM 2148 to Sulphur RiverUS 59 · Safety Improvement Projects | $3,000,440 | $2,402,680 | O. TREVINO CONSTRUCTION, LLC | -19.9% | 4 |
| Jan 8, 2025 | 0901-27-054STP 2024(106)TAPS | Red River Paris |
Avery NETT SUPVarious · Bicycle Infrastructure Improvements | $2,424,501 | $2,074,733 | CDM HOLDINGS | -14.4% | 6 |
| Jan 8, 2025 | 0907-13-017BR 2024(804) | Runnels San Angelo |
0907-13-017 CR REPLACE BRIDGE AND APPROACOUNTY ROAD 331 · Bridge Replacement | $2,664,344 | $1,997,089 | J. H. STRAIN & SONS, INC. | -25.0% | 8 |
| Jan 8, 2025 | 0920-12-049BR 2024(174) | Jasper Beaumont |
CR 139 @ BIG SANDY CREEK-BRIDGE REPLACECOUNTY ROAD 139 · Bridge Replacement | $1,863,815 | $1,980,225 | ISI CONTRACTING, INC. | +6.2% | 8 |
| Jan 8, 2025 | 6468-10-001MMC - 646810001 | Blanco Austin |
FY25 West Seal Coat AsphaltUS0281 · Material Maintenance Project | $2,187,600 | $1,825,710 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -16.5% | 2 |
| Jan 8, 2025 | 0901-19-216BR 2023(658) | Grayson Paris |
Bridge Replacement Sister Grove CreekSISTER GROVE RD · Bridge Replacement | $1,723,647 | $1,816,247 | THK CONSTRUCTION LLC | +5.4% | 6 |
| Jan 8, 2025 | 6473-57-001MMC - 647357001 | Bosque Waco |
HOT MIX BOSQUE & HAMILTONSH0006 · Material Maintenance Project | $1,758,500 | $1,801,950 | BIG CREEK CONSTRUCTION, LTD. | +2.5% | 3 |
| Jan 8, 2025 | 0920-00-166F 2025(383) | Jefferson Beaumont |
FY 25-DISTRICT WIDE-PVMT MARKINGSVarious · Traffic Control Devices | $3,063,065 | $1,798,959 | TRP INFRASTRUCTURE SERVICES, LLC | -41.3% | 5 |
| Jan 8, 2025 | 0925-00-081C 925-00-81 | Childress Childress |
2025 District Wide StripingVarious · Traffic Control Devices | $2,335,072 | $1,788,475 | TEXAS PANHANDLE CONSTRUCTION, INC. | -23.4% | 6 |
| Jan 8, 2025 | 0111-03-065F 2B24(533) | Fort Bend Houston |
FM 521: SH 6 to Harris C/LFM 521 · Corridor Traffic Management | $1,174,817 | $1,585,585 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | +35.0% | 7 |
| Jan 8, 2025 | 6475-12-001RMC - 647512001 | Bowie Atlanta |
Installation & Mnt Traffic SignalsUS0059 · Routine Maintenance Project - Sealed | $1,463,712 | $1,391,848 | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | -4.9% | 3 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.