Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 7, 2025 | 0915-15-101C 915-15-101 | Kerr San Antonio |
VA: 0915-15-101; TPWVarious · Texas Park and Wildlife | $1,115,563 | $908,186 | LONE STAR PAVING COMPANY | -18.6% | 7 |
| Feb 7, 2025 | 3136-01-207BR 2025(435) | Travis Austin |
LP 1 - 25BMIPSL 1 · Bridge Maintenance | $645,768 | $720,110 | GIBSON & ASSOCIATES, INC. | +11.5% | 5 |
| Feb 7, 2025 | 1499-01-032STP 2025(509)HRR | Frio San Antonio |
SAT_FM1581: 1499-01-032: SFTFM 1581 · Safety Improvement Projects | $704,587 | $614,054 | HUNTER INDUSTRIES, LTD. | -12.8% | 7 |
| Feb 7, 2025 | 3223-01-010F 2025(633) | Fort Bend Houston |
FM 3155: Richmond State School to UA 90FM 3155 · Overlay | $628,502 | $585,949 | DURWOOD GREENE CONSTRUCTION CO. | -6.8% | 7 |
| Feb 7, 2025 | 0610-07-123STP 2025(447)HES | Bowie Atlanta |
IH 30 at University AveIH 30 · Safety Improvement Projects | $329,797 | $414,401 | WG ENGINEERING & CONSTRUCTION, LLC | +25.7% | 3 |
| Feb 7, 2025 | 0111-08-127STP 2025(503)VRU | Brazoria Houston |
BS 288B At Kyle RoadBS 288B · Safety Improvement Projects | $311,201 | $354,848 | TRAF-TEX, INC. | +14.0% | 4 |
| Feb 6, 2025 | 0365-03-050STP 2024(401)MM | Johnson Fort Worth |
SH 171; US 377 TO SH 174SH 171 · Rehabilitation of Existing Road | $32,329,714 | $26,976,280 | JAY MILLS CONTRACTING, INCORPORATED | -16.6% | 4 |
| Feb 6, 2025 | 0140-13-020C 140-13-20 | Crockett San Angelo |
0140-13-020 IH 10 ACP OVERLAYIH 10 · Overlay | $33,606,433 | $24,564,337 | KIEWIT INFRASTRUCTURE SOUTH CO. | -26.9% | 6 |
| Feb 6, 2025 | 0025-09-081F 2025(506) | Bexar San Antonio |
FM 78; 0025-09-081; OVFM 78 · Overlay | $33,898,933 | $21,789,871 | TEXAS MATERIALS GROUP, INC. | -35.7% | 4 |
| Feb 6, 2025 | 0748-04-042C 748-4-42 | Frio San Antonio |
FM 140: 0748-04-042; RERFM 140 · Rehabilitation of Existing Road | $20,954,835 | $14,824,127 | HUNTER INDUSTRIES, LTD. | -29.3% | 6 |
| Feb 6, 2025 | 0018-06-181C 18-6-181 | Webb Laredo |
0018-06, IH35 SBML OVIH 35 · Overlay | $11,256,118 | $10,599,420 | ANDERSON COLUMBIA CO., INC. | -5.8% | 4 |
| Feb 6, 2025 | 1417-01-034F 2025(461) | Montgomery Houston |
FM 1484, FM 2432 to SH 105FM 1484 · Overlay | $12,606,975 | $8,353,736 | DURWOOD GREENE CONSTRUCTION CO. | -33.7% | 6 |
| Feb 6, 2025 | 0111-08-125F 2025(501) | Brazoria Houston |
SH 288: SH 36 to Dow Drainage CanalSH 288 · Overlay | $7,210,341 | $8,297,801 | DURWOOD GREENE CONSTRUCTION CO. | +15.1% | 3 |
| Feb 6, 2025 | 0164-01-078F 2025(450) | Henderson Tyler |
BS 31, BS 19 - SL 7BS 31H · Rehabilitation of Existing Road | $8,623,673 | $8,087,241 | BIG CREEK CONSTRUCTION, LTD. | -6.2% | 4 |
| Feb 6, 2025 | 0247-01-058STP 2025(566)HES | Panola Atlanta |
US 79 from US 59 to Sabine RiverUS 79 · Safety Improvement Projects | $9,792,224 | $8,013,112 | MADDEN CONTRACTING COMPANY, LLC. | -18.2% | 4 |
| Feb 6, 2025 | 0025-02-226C 25-2-226 | Bexar San Antonio |
IH10: 0025-02-226; FR OVIH 10 · Overlay | $9,598,054 | $7,922,686 | DEAN WORD COMPANY, LTD. | -17.5% | 6 |
| Feb 6, 2025 | 0905-00-123C 905-00-123 | Lubbock Lubbock |
FY 2025 Striping - LonglineVarious · Traffic Control Devices | $8,598,938 | $7,105,938 | L&L COMPANY | -17.4% | 7 |
| Feb 6, 2025 | 0700-01-049STP 2025(431)HES | Burnet Austin |
SH 71 - At CR 401SH 71 · Safety Improvement Projects | $6,847,445 | $7,072,728 | HUNTER INDUSTRIES, LTD. | +3.3% | 8 |
| Feb 6, 2025 | 0137-05-035BR 2025(418) | Archer Wichita Falls |
SH 25 at Mid Fork Little Wichita RiverSH 25 · Bridge Replacement | $6,856,853 | $6,506,472 | ALTUS CONSTRUCTION LLC | -5.1% | 7 |
| Feb 6, 2025 | 0816-02-089C 816-2-89 | Denton Dallas |
FM 455 East of Marion Rd to US 377FM 455 · Rehabilitation of Existing Road | $6,322,241 | $5,118,708 | JAGOE-PUBLIC COMPANY | -19.0% | 8 |
| Feb 6, 2025 | 0581-01-165STP 2025(367)VRU | Dallas Dallas |
SL 12 at Peavy RdSL 12 · Safety Improvement Projects | $4,268,721 | $5,047,479 | WG ENGINEERING & CONSTRUCTION, LLC | +18.2% | 1 |
| Feb 6, 2025 | 1926-01-019BR 2025(496) | Coryell Waco |
RER | FM 1829 | US 84 | FM 107FM 1829 · Rehabilitation of Existing Road | $5,558,480 | $4,787,272 | BIG CREEK CONSTRUCTION, LTD. | -13.9% | 6 |
| Feb 6, 2025 | 0098-05-036C 98-5-36 | Knox Childress |
SH 6 FM 2534, S to SH 222SH 6 · Overlay | $5,728,332 | $4,478,136 | ZACK BURKETT CO. | -21.8% | 5 |
| Feb 6, 2025 | 6453-59-001RMC - A00203365 | Harris Houston |
Bundle Bid Rdwy Maint. IH 45, etc.IH0045 · Routine Maintenance Project | $6,402,371 | $4,149,300 | ROY JORGENSEN ASSOCIATES, INC. | -35.2% | 4 |
| Feb 6, 2025 | 0027-13-257F 2025(497) | Harris Houston |
IH 69: From Fort Bend/Harris CL to ClayIH 69 · Landscape & Scenic Enhancement | $4,442,820 | $3,952,210 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -11.0% | 4 |
| Feb 6, 2025 | 0094-05-068C 94-5-68 | Tarrant Fort Worth |
SH 183; TRAFFIC CI TO MALL CISH 183 · Overlay | $3,983,176 | $3,831,815 | FOUTSCO PAVING COMPANY, LLC | -3.8% | 6 |
| Feb 6, 2025 | 0919-00-090F 2025(452) | Bowie Atlanta |
FY 24 District Seal Coat MarkingsVarious · Seal Coat | $3,703,987 | $3,631,143 | STRIPE-A-ZONE, LLC | -2.0% | 7 |
| Feb 6, 2025 | 0500-01-156BR 2025(500) | Galveston Houston |
IH 45 at Causeway (Recoating)IH 45 · Bridge Maintenance | $2,992,425 | $3,566,080 | ICOS MANAGEMENT, LLC | +19.2% | 5 |
| Feb 6, 2025 | 0913-21-055BR 2024(086) | Matagorda Yoakum |
AVE H BRIDGE REPLACEMENT 2609AVE H · Bridge Replacement | $3,775,699 | $3,170,844 | SCOUT 5 CONSTRUCTION LLC | -16.0% | 9 |
| Feb 6, 2025 | 0918-00-431C 918-00-431 | Dallas Dallas |
Various Locations in DAL- FY 25PMVarious · Rehabilitation of Existing Road | $4,630,470 | $2,930,055 | STRIPE-A-ZONE, LLC | -36.7% | 4 |
| Feb 6, 2025 | 0923-00-071C 923-00-71 | Brown Brownwood |
Districtwide Thermo Striping FY 2025Various · Traffic Control Devices | $4,088,340 | $2,883,374 | STRIPE-A-ZONE, LLC | -29.5% | 6 |
| Feb 6, 2025 | 0024-01-113C 24-1-113 | Uvalde San Antonio |
US 90: 0024-01-113; PEDUS 90 · Pedestrian, Sidewalks & Curb Ramps | $3,252,006 | $2,879,646 | RELMCO, INC. | -11.5% | 10 |
| Feb 6, 2025 | 0110-05-138C 110-5-138 | Harris Houston |
IH 45: FM 1960 to Montgomery C/LIH 45 · Traffic Control Devices | $2,899,005 | $2,797,767 | TRP INFRASTRUCTURE SERVICES, LLC | -3.5% | 5 |
| Feb 6, 2025 | 0354-01-056F 2B24(423) | Winkler Odessa |
SH_115_WINKLER_COUNTY_REHABSH 115 · Rehabilitation of Existing Road | $2,856,103 | $2,658,948 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -6.9% | 7 |
| Feb 6, 2025 | 0089-03-096C 89-3-96 | Jackson Yoakum |
US 59 SAFETY TREAT 2502US 59 · Safety Improvement Projects | $2,734,062 | $2,550,268 | BEAR CREEK CONTRACTING, LLC | -6.7% | 3 |
| Feb 6, 2025 | 6475-52-001RMC - A00212579 | Harris Houston |
FY2025 - Maintenance of Traffic SignalsIH0610 · Routine Maintenance Project - Sealed | $2,669,174 | $1,987,328 | LINDSEY ELECTRIC, L.P. | -25.5% | 3 |
| Feb 6, 2025 | 2681-01-029F 2025(528) | Denton Dallas |
FM 2499 FM 1171 to Tarrant CLFM 2499 · Rehabilitation of Existing Road | $2,467,225 | $1,920,305 | ROY JORGENSEN ASSOCIATES, INC. | -22.2% | 6 |
| Feb 6, 2025 | 1685-03-105F 2025(275) | Harris Houston |
FM 1960, FM 2100 to Liberty C/LFM 1960 · Overlay | $2,565,249 | $1,835,597 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -28.4% | 7 |
| Feb 6, 2025 | 0989-01-043STP 2025(467)HES | Jim Wells Corpus Christi |
CRP_FM0624_2_1_JIMWELLS_HSIPFM 624 · Safety Improvement Projects | $2,235,251 | $1,711,943 | HUNTER INDUSTRIES, LTD. | -23.4% | 6 |
| Feb 6, 2025 | 6468-19-001MMC - A00210094 | Travis Austin |
FY25 East Seal Coat AsphaltIH0035 · Material Maintenance Project | $1,863,900 | $1,708,860 | ERGON ASPHALT & EMULSIONS, INC. | -8.3% | 1 |
| Feb 6, 2025 | 0910-00-150F 2025(412) | Smith Tyler |
25 DISTRICT WIDE THERMO 3Various · Traffic Control Devices | $2,641,703 | $1,665,532 | STRIPING TECHNOLOGY, L.P. | -37.0% | 5 |
| Feb 6, 2025 | 6461-70-001BPM - A00206078 | Potter Amarillo |
BPM FY 2025IH0040 · Bridge Preventative Maintenance - Sealed | $2,003,276 | $1,595,496 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | -20.4% | 7 |
| Feb 6, 2025 | 6477-69-001RMC - A00213103 | Brown Brownwood |
MBGF REPAIR (CALLOUT)US0377 · Routine Maintenance Project - Sealed | $1,972,330 | $1,320,359 | ROSS SA ENTERPRISE LLC | -33.1% | 7 |
| Feb 6, 2025 | 0205-01-046STP 2025(360)HES | Robertson Bryan |
US 79 at FM 2549 - Intersection FY 25US 79 · Safety Improvement Projects | $891,318 | $897,290 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +0.7% | 7 |
| Feb 6, 2025 | 0454-02-055STP 2025(058)VRU | Tom Green San Angelo |
IMPROVE TRAFFIC & PED SIGNALSSH 208 · Traffic Control Devices | $431,837 | $480,048 | E-Z BEL CONSTRUCTION, LLC | +11.2% | 3 |
| Feb 6, 2025 | 0914-00-481F 2025(432) | Travis Austin |
FY 2025 Districtwide SignsVarious · Traffic Control Devices | $565,323 | $338,134 | THE LEVY COMPANY, LLC | -40.2% | 7 |
| Feb 6, 2025 | 0114-03-108BR 2025(433) | Travis Austin |
US 290 - At Cottonwd & B Dry Ck, 25BMIPUS 290 · Bridge Maintenance | $418,141 | $304,980 | BK FIELD OPERATIONS LLC | -27.1% | 13 |
| Feb 6, 2025 | 0337-02-053BR 2025(434) | Williamson Austin |
SH 29 - AT San Gabriel Rv, 25BMIPSH 29 · Bridge Maintenance | $394,699 | $279,317 | BK FIELD OPERATIONS LLC | -29.2% | 10 |
| Feb 5, 2025 | 6477-87-001RMC - A00213140 | Webb Laredo |
RMC Webb County MowingIH0035 · Routine Maintenance Project - Sealed | $822,872 | $746,057 | R&M INCORPORATED | -9.3% | 2 |
| Feb 4, 2025 | 6478-36-001RMC - A00213307 | Kerr San Antonio |
2025 Kerr Mowing and Litter RemovalIH0010 · Routine Maintenance Project | $817,128 | $969,563 | USA DT SERVICES, INC. | +18.7% | 2 |
| Feb 4, 2025 | 6478-65-001RMC - A00213424 | Medina San Antonio |
2025 Medina MowingUS0090 · Routine Maintenance Project | $945,300 | $846,635 | R&M INCORPORATED | -10.4% | 3 |
| Feb 4, 2025 | 6478-37-001RMC - A00213308 | Kendall San Antonio |
2025 Kendall MowingIH0010 · Routine Maintenance Project | $671,710 | $806,187 | R&M INCORPORATED | +20.0% | 2 |
| Feb 4, 2025 | 6478-98-001MMC - A00213681 | Comal San Antonio |
2025 Comal HMAIH0035 · Material Maintenance Project | $858,000 | $781,000 | TEXAS MATERIALS GROUP, INC. | -9.0% | 5 |
| Feb 4, 2025 | 6478-94-001MMC - A00213676 | Bexar San Antonio |
2025 Bexar DW AggregateIH0010 · Material Maintenance Project | $803,518 | $763,932 | VULCAN CONSTRUCTION MATERIALS, LLC | -4.9% | 4 |
| Feb 4, 2025 | 6478-64-001RMC - A00213411 | Uvalde San Antonio |
2025 Uvalde MowingUS0090 · Routine Maintenance Project | $796,310 | $609,785 | BK FIELD OPERATIONS LLC | -23.4% | 4 |
| Feb 4, 2025 | 6478-96-001MMC - A00213678 | Kendall San Antonio |
2025 Kendall LRAIH0010 · Material Maintenance Project | $627,020 | $600,884 | VULCAN CONSTRUCTION MATERIALS, LLC | -4.2% | 2 |
| Feb 4, 2025 | 6478-97-001MMC - A00213680 | Bexar San Antonio |
2025 East Bexar HMAIH0010 · Material Maintenance Project | $700,280 | $580,720 | TEXAS MATERIALS GROUP, INC. | -17.1% | 5 |
| Feb 4, 2025 | 6478-35-001RMC - A00213306 | Bandera San Antonio |
2025 Bandera MowingSH0016 · Routine Maintenance Project | $515,250 | $531,230 | USA DT SERVICES, INC. | +3.1% | 3 |
| Feb 2, 2025 | 6478-75-001SUP - A00213552 | Hood Fort Worth |
FY25 HES Picnic Area MaintenanceUS0377 · State Use Project | $122,658 | — | 0 | ||
| Feb 1, 2025 | 6479-15-001SUP - A00213821 | Dallas Dallas |
District Janitorial #1 442 0125US0080 · State Use Project | $211,043 | — | 0 | ||
| Feb 1, 2025 | 6479-16-001SUP - A00213822 | Dallas Dallas |
District Janitorial #2 442 0125US0080 · State Use Project | $281,262 | — | 0 | ||
| Feb 1, 2025 | 6477-60-001SUP - A00213074 | Dallas Dallas |
Janitorial and Grounds 0125US0067 · State Use Project | $43,258 | — | 0 | ||
| Feb 1, 2025 | 6480-16-001SUP - A00214068 | Rockwall Dallas |
Rockwall Janitorial and Grounds FY25IH0030 · State Use Project | $29,782 | — | 0 | ||
| Feb 1, 2025 | 6478-43-001SUP - A00213347 | Val Verde Laredo |
Picnic Area (Val Verde)US0090 · State Use Project - Sealed | $85,171 | — | 0 | ||
| Jan 31, 2025 | 6480-60-001SUP - A00214195 | Haskell Abilene |
Haskell and Stonewall Picnic AreaUS0380 · State Use Project | $42,036 | — | 0 | ||
| Jan 31, 2025 | 6479-01-001SUP - A00213705 | Kinney Laredo |
Picnic Area (Kinney)US0090 · State Use Project - Sealed | $80,908 | — | 0 | ||
| Jan 30, 2025 | 6479-04-001MMC - A00213757 | Midland Odessa |
6479-04-0001 Concrete SandIH0020 · Material Maintenance Project | $19,500 | $19,500 | SOUTHERN SOURCING SOLUTIONS, LLC | 0.0% | 1 |
| Jan 29, 2025 | 6479-34-001SUP - A00213850 | Shelby Lufkin |
2025-01 Shelby Mailbox/C&GSH0007 · State Use Project | $177,150 | — | 0 | ||
| Jan 28, 2025 | 6478-10-001MMC - A00213200 | Bexar San Antonio |
2025 Bexar DW EmulsionIH0010 · Material Maintenance Project | $709,650 | $765,400 | ERGON ASPHALT & EMULSIONS, INC. | +7.9% | 1 |
| Jan 28, 2025 | 6478-17-001MMC - A00213208 | Wilson San Antonio |
2025 Wilson LRAUS0181 · Material Maintenance Project | $788,400 | $747,885 | VULCAN CONSTRUCTION MATERIALS, LLC | -5.1% | 2 |
| Jan 28, 2025 | 6478-13-001MMC - A00213204 | Uvalde San Antonio |
2025 Uvalde LRAUS0090 · Material Maintenance Project | $696,000 | $716,967 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.0% | 2 |
| Jan 28, 2025 | 6478-16-001MMC - A00213207 | Bexar San Antonio |
2025 MMC Bexar HMAIH0010 · Material Maintenance Project | $700,850 | $660,800 | TEXAS MATERIALS GROUP, INC. | -5.7% | 4 |
| Jan 28, 2025 | 6478-19-001MMC - A00213210 | Frio San Antonio |
2025 MMC Frio LRAIH0035 · Material Maintenance Project | $634,500 | $624,570 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.6% | 2 |
| Jan 28, 2025 | 6478-18-001MMC - A00213209 | Kerr San Antonio |
2025 MMC Kerr LRAIH0010 · Material Maintenance Project | $624,000 | $615,540 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.4% | 2 |
| Jan 28, 2025 | 6478-15-001MMC - A00213206 | Medina San Antonio |
2025 MMC Medina LRAIH0035 · Material Maintenance Project | $491,400 | $490,320 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.2% | 2 |
| Jan 28, 2025 | 6478-14-001MMC - A00213205 | Guadalupe San Antonio |
2025 MMC Guadalupe HMAIH0010 · Material Maintenance Project | $326,000 | $301,000 | TEXAS MATERIALS GROUP, INC. | -7.7% | 4 |
| Jan 28, 2025 | 6478-49-001RMC - A00213378 | Moore Amarillo |
FY 25 Dumas Area SweepingUS0087 · Routine Maintenance Project | $0 | $240,725 | E.V.G. ENTERPRISE | 1 | |
| Jan 28, 2025 | 6468-52-001SUP - A00210154 | Galveston Houston |
FY 2025 LANDSCAPE MAINTENANCEIH0045 · State Use Project | $24,501 | — | 0 | ||
| Jan 28, 2025 | 6479-42-001SUP - A00213859 | Houston Lufkin |
2025-01 Houston Mailbox/C&GSL0304 · State Use Project | $44,355 | — | 0 | ||
| Jan 28, 2025 | 6479-25-001SUP - A00213837 | Sabine Lufkin |
2025-01 Sabine JanitorialFM0083 · State Use Project | $21,486 | — | 0 | ||
| Jan 27, 2025 | 6478-84-001EMC - A00213658 | Brazos Bryan |
FY24 - EMC Brazos SH6 Bridge RepairSH0006 · Emergency Maintenance Project - Sealed | $662,795 | — | 0 | ||
| Jan 27, 2025 | 6479-71-001SUP - A00213914 | Deaf Smith Amarillo |
FY 25 Hereford Maintenance JanitorialUS0060 · State Use Project | $8,800 | — | 0 | ||
| Jan 22, 2025 | 6478-52-001MMC - A00213387 | Live Oak Corpus Christi |
6478-52-001 LRA George West MaintUS0059 · Material Maintenance Project | $415,600 | $440,824 | MARTIN MARIETTA MATERIALS, INC. | +6.1% | 2 |
| Jan 22, 2025 | 6478-58-001MMC - A00213397 | Nueces Corpus Christi |
6478-58-001 Hot Mix Robstown MaintUS0077 · Material Maintenance Project | $427,000 | $411,620 | COLORADO MATERIALS, LTD. | -3.6% | 2 |
| Jan 22, 2025 | 6478-59-001MMC - A00213398 | Jim Wells Corpus Christi |
6478-59-001 LRA Alice Maint.US0281 · Material Maintenance Project | $374,000 | $388,704 | MARTIN MARIETTA MATERIALS, INC. | +3.9% | 2 |
| Jan 22, 2025 | 6478-60-001MMC - A00213399 | San Patricio Corpus Christi |
6478-60-001 LRA Sinton Maint.US0181 · Material Maintenance Project | $330,000 | $347,640 | MARTIN MARIETTA MATERIALS, INC. | +5.3% | 2 |
| Jan 22, 2025 | 6478-55-001MMC - A00213392 | Bee Corpus Christi |
6478-55-001 Flex Base Bee MaintUS0181 · Material Maintenance Project | $286,700 | $226,005 | COLORADO MATERIALS, LTD. | -21.2% | 7 |
| Jan 22, 2025 | 6476-40-001MMC - A00212800 | Wichita Wichita Falls |
2025 - PAINT & BEADSFM0369 · Material Maintenance Project | $166,760 | $147,400 | ENNIS-FLINT, INC. | -11.6% | 3 |
| Jan 22, 2025 | 6479-55-001SUP - A00213878 | Gillespie Austin |
Fredericksburg Maintenance Litter FY25US0290 · State Use Project | $160,918 | — | 0 | ||
| Jan 21, 2025 | 6476-72-001MMC - A00212866 | Cherokee Tyler |
FY 24 FlexbaseUS0069 · Material Maintenance Project | $578,275 | $534,050 | SOUTHERN SOURCING SOLUTIONS, LLC | -7.6% | 2 |
| Jan 21, 2025 | 6478-11-001RMC - A00213202 | Anderson Tyler |
Anderson Tree Removal - FY25US0079 · Routine Maintenance Project | $514,000 | $436,408 | L & M MOWING CONTRACTORS, LLC | -15.1% | 6 |
| Jan 21, 2025 | 6478-12-001MMC - A00213203 | Freestone Bryan |
FY25 Freestone/Leon LRA -01IH0045 · Material Maintenance Project | $336,000 | $353,316 | MARTIN MARIETTA MATERIALS, INC. | +5.2% | 2 |
| Jan 21, 2025 | 6476-17-001RMC - 647617001 | Milam Bryan |
FY25 - Milam Mowing -01FM0486 · Routine Maintenance Project | $387,501 | $312,088 | R&M INCORPORATED | -19.5% | 3 |
| Jan 21, 2025 | 6476-29-001RMC - A00212778 | Washington Bryan |
FY25 - Washington Tree Removal - 11US0290 · Routine Maintenance Project | $195,400 | $198,575 | AUSTIN BARRICADE COMPANY, L.L.C. | +1.6% | 2 |
| Jan 17, 2025 | 6396-90-001RMC - A00185070 | Colorado Yoakum |
Installation of Traffic SignalUA0090 · Routine Maintenance Project - Sealed | $199,658 | $146,025 | THIRD COAST SERVICES LLC | -26.9% | 3 |
| Jan 16, 2025 | 6477-54-001MMC - A00213063 | Lubbock Lubbock |
2025 Districtwide Hot MixIH0027 · Material Maintenance Project | $903,500 | $843,000 | DUININCK, INC. | -6.7% | 2 |
| Jan 16, 2025 | 6477-51-001MMC - A00213060 | Terry Lubbock |
2025 Brownfield AggregateUS0062 · Material Maintenance Project | $459,000 | $451,600 | WEST TEXAS PAVING, INC. | -1.6% | 3 |
| Jan 16, 2025 | 6475-22-001RMC - A00212515 | Grayson Paris |
ROW Mowing Grayson Co. 75 FY25US0075 · Routine Maintenance Project - Sealed | $393,194 | $354,007 | AMS TRACTOR SERVICES, LLC | -10.0% | 3 |
| Jan 16, 2025 | 6475-21-001RMC - A00212514 | Grayson Paris |
ROW Mowing Grayson Co. FY25US0069 · Routine Maintenance Project - Sealed | $381,640 | $345,676 | PREMIER CONTRACTORS LLC | -9.4% | 3 |
| Jan 16, 2025 | 6475-16-001RMC - A00212509 | Lamar Paris |
ROW Mowing Lamar Co. FY25US0082 · Routine Maintenance Project - Sealed | $380,425 | $315,814 | PREMIER CONTRACTORS LLC | -17.0% | 6 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.