271Let jobs
$1,577,931,356Total low bids
$1,473,894,905Total estimates
+7.1%Low bids vs estimates
Aug 2022 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 31, 2022 | 6402-83-001MMC - 640283001 | Wharton Yoakum |
ROCK/RIPRAPUS 59 · | $262,500 | $262,500 | DIGG COMMERCIAL, LLC | 0.0% | 1 |
| Aug 30, 2022 | 6417-97-001MMC - 641797001 | Comanche Brownwood |
LIMESTONE ROCK ASPHALTSH 16 · | $298,750 | $335,054 | VULCAN CONSTRUCTION MATERIALS, LLC | +12.2% | 1 |
| Aug 30, 2022 | 6418-21-001MMC - 641821001 | Bell Waco |
HOT MIXUS 190 · | $288,640 | $328,600 | TEXAS MATERIALS GROUP, INC. | +13.8% | 1 |
| Aug 30, 2022 | 6402-51-001MMC - 640251001 | Colorado Yoakum |
HOT-MIX COLD-LAIDIH 10 · | $297,000 | $316,800 | QUALITY HOT MIX, INC. | +6.7% | 3 |
| Aug 30, 2022 | 6406-97-001MMC - 640697001 | Nolan Abilene |
HOT MIXIH 20 · | $299,850 | $307,984 | VULCAN CONSTRUCTION MATERIALS, LLC | +2.7% | 2 |
| Aug 30, 2022 | 6417-95-001MMC - 641795001 | Brown Brownwood |
LIMESTONE ROCK ASPHALTUS 183 · | $296,000 | $302,375 | VULCAN CONSTRUCTION MATERIALS, LLC | +2.2% | 1 |
| Aug 30, 2022 | 6418-19-001MMC - 641819001 | Bosque Waco |
HOT MIXSH 6 · | $291,500 | $299,980 | KNIFE RIVER CORPORATION - SOUTH | +2.9% | 3 |
| Aug 30, 2022 | 6418-23-001MMC - 641823001 | Hill Waco |
HOT MIXSH 81 · | $286,440 | $296,960 | KNIFE RIVER CORPORATION - SOUTH | +3.7% | 2 |
| Aug 30, 2022 | 6417-99-001MMC - 641799001 | Lampasas Brownwood |
LIMESTONE ROCK ASPHALTUS 281 · | $294,000 | $292,157 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.6% | 1 |
| Aug 30, 2022 | 6418-25-001MMC - 641825001 | Limestone Waco |
HOT MIXUS 84 · | $289,960 | $291,365 | KNIFE RIVER CORPORATION - SOUTH | +0.5% | 3 |
| Aug 30, 2022 | 6418-27-001MMC - 641827001 | Falls Waco |
HOT MIXSH 6 · | $279,070 | $283,160 | KNIFE RIVER CORPORATION - SOUTH | +1.5% | 3 |
| Aug 30, 2022 | 6418-31-001MMC - 641831001 | McLennan Waco |
EMULSIONUS 84 · | $277,550 | $243,150 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -12.4% | 1 |
| Aug 30, 2022 | 6418-01-001MMC - 641801001 | Brown Brownwood |
HOT-MIX COLD-LAIDUS 377 · | $270,000 | $240,000 | MALBEC MATERIALS LLC | -11.1% | 2 |
| Aug 30, 2022 | 6417-93-001MMC - 641793001 | Brown Brownwood |
WINTER WEATHER MATERIALUS 183 · | $204,080 | $194,073 | NSG LOGISTICS, LLC | -4.9% | 2 |
| Aug 30, 2022 | 6398-17-001MMC - 639817001 | Brown Brownwood |
FLEXIBLE BASEUS 377 · | $126,570 | $125,525 | DIGG COMMERCIAL, LLC | -0.8% | 2 |
| Aug 26, 2022 | 6415-90-001MMC - 641590001 | Dimmit Laredo |
LIMESTONE ROCK ASPHALTUS 277 · | $299,600 | $307,468 | VULCAN CONSTRUCTION MATERIALS, LLC | +2.6% | 1 |
| Aug 26, 2022 | 6413-93-001MMC - 641393001 | Val Verde Laredo |
LIMESTONE ROCK ASPHALTUS 277 · | $299,625 | $307,013 | VULCAN CONSTRUCTION MATERIALS, LLC | +2.5% | 1 |
| Aug 26, 2022 | 6415-92-001MMC - 641592001 | Maverick Laredo |
LIMESTONE ROCK ASPHALTUS 277 · | $299,985 | $301,484 | VULCAN CONSTRUCTION MATERIALS, LLC | +0.5% | 1 |
| Aug 25, 2022 | 6417-73-001MMC - 641773001 | El Paso El Paso |
FLEXIBLE BASESL 375 · | $66,800 | $77,150 | JOBE MATERIALS, L.P. | +15.5% | 2 |
| Aug 25, 2022 | 6415-60-001MMC - 641560001 | Angelina Lufkin |
WINTER WEATHER MATERIALUS 59 · | $46,200 | $60,778 | CLEMENTS FLUIDS HENDERSON, LTD. | +31.6% | 1 |
| Aug 25, 2022 | 6417-44-001MMC - 641744001 | Sabine Lufkin |
EMULSIONFM 83 · | $33,000 | $40,200 | MARTIN RESOURCE MANAGEMENT CORPORATION | +21.8% | 1 |
| Aug 24, 2022 | 6415-40-001MMC - 641540001 | San Jacinto Lufkin |
HYDRAULIC CEMENTSH 150 · | $61,860 | $61,376 | AKA-MATERIALS | -0.8% | 2 |
| Aug 24, 2022 | 6415-52-001MMC - 641552001 | Trinity Lufkin |
HYDRAULIC CEMENTFM 1280 · | $46,932 | $39,245 | TOUCHSTONE RESOURCES, LLC | -16.4% | 2 |
| Aug 24, 2022 | 6415-44-001MMC - 641544001 | San Jacinto Lufkin |
AGGREGATESH 150 · | $22,310 | $24,085 | ARCOSA LWS, LLC | +8.0% | 1 |
| Aug 23, 2022 | 6395-13-001MMC - 639513001 | Victoria Yoakum |
AGGREGATEUS 77 · | $297,600 | $375,200 | QUALITY HOT MIX, INC. | +26.1% | 3 |
| Aug 23, 2022 | 6400-27-001MMC - 640027001 | Wharton Yoakum |
AGGREGATEUS 59 · | $296,950 | $365,000 | COLORADO MATERIALS, LTD. | +22.9% | 3 |
| Aug 23, 2022 | 6391-57-001MMC - 639157001 | Fayette Yoakum |
AGGREGATEIH 10 · | $295,400 | $322,400 | COLORADO MATERIALS, LTD. | +9.1% | 3 |
| Aug 23, 2022 | 6402-71-001MMC - 640271001 | De Witt Yoakum |
HOT MIXUS 77 · | $297,500 | $294,000 | BRAUNTEX MATERIALS, INC. | -1.2% | 4 |
| Aug 23, 2022 | 6415-70-001MMC - 641570001 | Sabine Lufkin |
EMULSIONFM 83 · | $253,825 | $275,275 | MARTIN RESOURCE MANAGEMENT CORPORATION | +8.5% | 1 |
| Aug 23, 2022 | 6417-16-001RMC - 641716001 | Potter Amarillo |
SWEEPING AND DEBRIS REMOVALUS 87 · | $239,637 | $229,128 | PANHANDLE SWEEPING & MAINTENANCE, LLC | -4.4% | 1 |
| Aug 23, 2022 | 6416-82-001MMC - 641682001 | El Paso El Paso |
ASPHALTIC PATCHING MATERIALUS 54 · | $156,250 | $214,750 | TOUCHSTONE RESOURCES, LLC | +37.4% | 1 |
| Aug 23, 2022 | 6415-72-001MMC - 641572001 | Sabine Lufkin |
HOT MIXFM 83 · | $192,000 | $205,980 | TEXAS MATERIALS GROUP, INC. | +7.3% | 2 |
| Aug 23, 2022 | 6404-82-001MMC - 640482001 | Lubbock Lubbock |
WINTER WEATHER MATERIALUS 84 · | $210,000 | $181,600 | NSG LOGISTICS, LLC | -13.5% | 4 |
| Aug 23, 2022 | 6412-53-001MMC - 641253001 | Navarro Dallas |
FLEXIBLE BASESH 31 · | $112,000 | $84,000 | KNIFE RIVER CORPORATION - SOUTH | -25.0% | 4 |
| Aug 23, 2022 | 6404-47-001RMC - 640447001 | Jasper Beaumont |
CRACK SEALUS 190 · | $163,831 | $65,499 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -60.0% | 6 |
| Aug 23, 2022 | 6415-46-001MMC - 641546001 | Trinity Lufkin |
CUTBACKUS 287 · | $39,160 | $43,670 | MARTIN RESOURCE MANAGEMENT CORPORATION | +11.5% | 1 |
| Aug 18, 2022 | 6413-82-001MMC - 641382001 | Hopkins Paris |
ANTI-ICER MATERIALSSH 11 · | $273,775 | $172,691 | THE BARGAIN SOURCE | -36.9% | 3 |
| Aug 18, 2022 | 6414-65-001RMC - 641465001 | Lamar Paris |
PICNIC AREA MAINTENANCEUS 271 · | $109,600 | $89,800 | KJRM GENERAL CONTRACTORS, LLC | -18.1% | 2 |
| Aug 17, 2022 | 6413-35-001RMC - 641335001 | Comal San Antonio |
PICNIC AREA MAINTENANCEIH 35 · | $294,456 | $287,298 | BK FIELD OPERATIONS LLC | -2.4% | 5 |
| Aug 17, 2022 | 6382-08-001RMC - 638208001 | Parker Fort Worth |
TREE TRIMMING AND BRUSH REMOVALIH 20 · | $236,642 | $203,000 | SHALOM SERVICES CORPORATION | -14.2% | 5 |
| Aug 17, 2022 | 6410-17-001RMC - 641017001 | Tarrant Fort Worth |
CRACK SEALFM 1938 · | $132,530 | $124,855 | D & M CONTRACTORS, LLC | -5.8% | 5 |
| Aug 17, 2022 | 6400-96-001RMC - 640096001 | Parker Fort Worth |
CLEANING AND SEALING CRACKSIH 20 · | $146,825 | $109,823 | D & M CONTRACTORS, LLC | -25.2% | 5 |
| Aug 16, 2022 | 6414-33-001MMC - 641433001 | Van Zandt Tyler |
HYDRAULIC CEMENTUS 80 · | $250,000 | $275,000 | AKA-MATERIALS | +10.0% | 2 |
| Aug 16, 2022 | 6413-47-001MMC - 641347001 | Childress Childress |
WINTER WEATHER MATERIALUS 287 · | $235,650 | $228,759 | UNITED SALT CORPORATION | -2.9% | 4 |
| Aug 16, 2022 | 6414-59-001MMC - 641459001 | Walker Bryan |
ROCK/RIPRAPIH 45 · | $225,000 | $207,900 | TOUCHSTONE RESOURCES, LLC | -7.6% | 3 |
| Aug 16, 2022 | 6414-79-001MMC - 641479001 | Brazos Bryan |
LIMESTONE ROCK ASPHALTSH 6 · | $187,500 | $204,240 | VULCAN CONSTRUCTION MATERIALS, LLC | +8.9% | 1 |
| Aug 16, 2022 | 6414-61-001MMC - 641461001 | Walker Bryan |
AGGREGATEIH 45 · | $153,500 | $140,875 | ARCOSA LWS, LLC | -8.2% | 1 |
| Aug 16, 2022 | 6414-75-001MMC - 641475001 | Brazos Bryan |
AGGREGATESH 6 · | $105,000 | $130,000 | TOUCHSTONE RESOURCES, LLC | +23.8% | 2 |
| Aug 16, 2022 | 6414-63-001MMC - 641463001 | Freestone Bryan |
AGGREGATEIH 45 · | $153,500 | $125,050 | ARCOSA LWS, LLC | -18.5% | 1 |
| Aug 11, 2022 | 6377-71-001RMC - 637771001 | Val Verde Laredo |
TREE TRIMMING AND BRUSH REMOVALUS 277 · | $291,760 | $280,000 | SOUTH TEXAS BUILDCON, LLC | -4.0% | 2 |
| Aug 11, 2022 | 6395-04-001RMC - 639504001 | Chambers Beaumont |
CLEANING AND SEALING CRACKSIH 10 · | $158,438 | $57,666 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -63.6% | 3 |
| Aug 10, 2022 | 6414-57-001MMC - 641457001 | Walker Bryan |
HOT MIXIH 45 · | $269,000 | $322,750 | BIG CREEK CONSTRUCTION, LTD. | +20.0% | 1 |
| Aug 10, 2022 | 6409-29-001RMC - 640929001 | Angelina Lufkin |
MAINTENANCE OF LARGE SIGNSUS 59 · | $221,250 | $251,830 | DCC CONSTRUCTION AND SERVICES, L.L.C. | +13.8% | 1 |
| Aug 10, 2022 | 6414-45-001MMC - 641445001 | Grimes Bryan |
HOT MIXSH 6 · | $260,000 | $227,000 | WALLER COUNTY ASPHALT INC. | -12.7% | 4 |
| Aug 10, 2022 | 6414-39-001MMC - 641439001 | Brazos Bryan |
HOT MIXSH 6 · | $235,500 | $218,000 | KNIFE RIVER CORPORATION - SOUTH | -7.4% | 1 |
| Aug 10, 2022 | 6410-11-001RMC - 641011001 | Harrison Atlanta |
TREE REMOVALUS 59 · | $176,650 | $194,969 | H. V. CAVER, INC. | +10.4% | 3 |
| Aug 10, 2022 | 6410-09-001RMC - 641009001 | Panola Atlanta |
TREE REMOVALUS 59 · | $176,650 | $180,264 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +2.0% | 3 |
| Aug 10, 2022 | 6386-83-001RMC - 638683001 | Burnet Austin |
CRACK SEALSH 29 · | $115,433 | $148,460 | FYL ENTERPRISES, LLC | +28.6% | 4 |
| Aug 10, 2022 | 6386-82-001RMC - 638682001 | Bastrop Austin |
CRACK SEALUS 290 · | $158,148 | $130,773 | FYL ENTERPRISES, LLC | -17.3% | 5 |
| Aug 10, 2022 | 6386-84-001RMC - 638684001 | Travis Austin |
CRACK SEALFM 973 · | $118,005 | $94,010 | FYL ENTERPRISES, LLC | -20.3% | 2 |
| Aug 9, 2022 | 6412-71-001RMC - 641271001 | Crane Odessa |
MOWING HIGHWAY RIGHT OF WAYUS 385 · | $281,280 | $281,152 | ABESCAPE GROUP LLC | 0.0% | 2 |
| Aug 9, 2022 | 6398-88-001BPM - 639888001 | Collin Dallas |
BRIDGE PREVENTATIVE MAINTENANCEFM 1562 · | $268,635 | $270,510 | ROAD DOCTORS LLC | +0.7% | 7 |
| Aug 9, 2022 | 6399-40-001RMC - 639940001 | Collin Dallas |
CULVERT EXTENSION & CROSS DRAINAGEFM 455 · | $168,948 | $265,824 | TALBRAN ENTERPRISES LLC | +57.3% | 1 |
| Aug 9, 2022 | 6412-83-001MMC - 641283001 | Walker Bryan |
EMULSIONIH 45 · | $218,000 | $246,000 | CLEVELAND ASPHALT PRODUCTS, INC. | +12.8% | 3 |
| Aug 9, 2022 | 6402-93-001RMC - 640293001 | Denton Dallas |
TREE TRIMMING AND BRUSH REMOVALFM 2449 · | $217,942 | $200,507 | 3 J HAYES CONTRACTING LLC | -8.0% | 5 |
| Aug 9, 2022 | 6412-81-001MMC - 641281001 | Washington Bryan |
EMULSIONSH 36 · | $180,700 | $200,400 | ERGON ASPHALT & EMULSIONS, INC. | +10.9% | 2 |
| Aug 9, 2022 | 6410-65-001RMC - 641065001 | Pecos Odessa |
CLEANING AND SEALING CRACKSIH 10 · | $298,584 | $186,287 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -37.6% | 3 |
| Aug 9, 2022 | 6409-77-001RMC - 640977001 | Ellis Dallas |
CRACK SEALUS 287 · | $252,465 | $171,222 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -32.2% | 2 |
| Aug 9, 2022 | 6413-97-001MMC - 641397001 | Jefferson Beaumont |
HOT-MIX COLD-LAIDUS 69 · | $117,550 | $152,250 | TEXAS MATERIALS GROUP, INC. | +29.5% | 1 |
| Aug 9, 2022 | 6394-27-001RMC - 639427001 | Dallas Dallas |
DEBRIS REMOVALSL 12 · | $142,175 | $138,950 | TALBRAN ENTERPRISES LLC | -2.3% | 1 |
| Aug 9, 2022 | 6412-79-001MMC - 641279001 | Walker Bryan |
CUTBACKIH 45 · | $142,400 | $138,160 | MARTIN RESOURCE MANAGEMENT CORPORATION | -3.0% | 2 |
| Aug 9, 2022 | 6401-40-001RMC - 640140001 | Rusk Tyler |
CRACK SEALFM 1798 · | $231,203 | $132,722 | SCOUT 5 CONSTRUCTION LLC | -42.6% | 6 |
| Aug 9, 2022 | 6413-65-001MMC - 641365001 | Midland Odessa |
EMULSIONIH 20 · | $108,000 | $117,420 | ERGON ASPHALT & EMULSIONS, INC. | +8.7% | 2 |
| Aug 9, 2022 | 6406-79-001RMC - 640679001 | Kaufman Dallas |
CRACK SEALUS 80 · | $188,124 | $109,295 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -41.9% | 4 |
| Aug 9, 2022 | 6412-77-001MMC - 641277001 | Brazos Bryan |
CUTBACKSH 6 · | $106,800 | $103,280 | MARTIN RESOURCE MANAGEMENT CORPORATION | -3.3% | 2 |
| Aug 9, 2022 | 6402-11-001RMC - 640211001 | Dallas Dallas |
CRACK SEALSL 12 · | $192,850 | $95,775 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -50.3% | 3 |
| Aug 9, 2022 | 6394-26-001RMC - 639426001 | Dallas Dallas |
DEBRIS REMOVALIH 20 · | $96,675 | $94,650 | SHALOM SERVICES CORPORATION | -2.1% | 2 |
| Aug 9, 2022 | 6412-75-001MMC - 641275001 | Washington Bryan |
CUTBACKSH 36 · | $106,800 | $92,720 | MARTIN RESOURCE MANAGEMENT CORPORATION | -13.2% | 2 |
| Aug 9, 2022 | 6403-78-001RMC - 640378001 | Navarro Dallas |
CRACK SEALSH 14 · | $176,330 | $77,851 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -55.8% | 3 |
| Aug 9, 2022 | 6415-38-001MMC - 641538001 | Ector Odessa |
EMULSIONIH 20 · | $58,800 | $77,160 | ERGON ASPHALT & EMULSIONS, INC. | +31.2% | 2 |
| Aug 9, 2022 | 6400-05-001RMC - 640005001 | Collin Dallas |
CRACK SEALUS 380 · | $105,199 | $72,295 | D & M CONTRACTORS, LLC | -31.3% | 4 |
| Aug 9, 2022 | 6402-91-001RMC - 640291001 | Denton Dallas |
CRACK SEALIH 35W · | $198,340 | $65,188 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -67.1% | 4 |
| Aug 9, 2022 | 6409-25-001MMC - 640925001 | Collin Dallas |
ROCK/RIPRAPSH 5 · | $19,239 | $30,000 | TOUCHSTONE RESOURCES, LLC | +55.9% | 2 |
| Aug 9, 2022 | 6413-49-001MMC - 641349001 | Jefferson Beaumont |
ASPHALTIC PATCHING MATERIALSH 347 · | $21,450 | $21,702 | WALLER COUNTY ASPHALT INC. | +1.2% | 2 |
| Aug 9, 2022 | 6413-55-001MMC - 641355001 | Walker Bryan |
ASPHALTIC PATCHING MATERIALIH 45 · | $12,500 | $13,610 | WALLER COUNTY ASPHALT INC. | +8.9% | 1 |
| Aug 4, 2022 | 0006-02-114C 6-2-114 | Nolan Abilene |
INTERCHANGE IMPROVEMENT (NEW OR UPDATE)IH 20 · | $85,689,549 | $127,043,010 | SUNDT CONSTRUCTION, INC. | +48.3% | 3 |
| Aug 4, 2022 | 0338-04-060C 338-4-60 | Montgomery Houston |
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANESSH 105 · | $51,916,065 | $51,803,008 | JAMES CONSTRUCTION GROUP, LLC | -0.2% | 3 |
| Aug 4, 2022 | 0598-02-111STP 2022(575)MM | Brazoria Houston |
CONSTRUCT BRIDGESH 288 · | $45,430,167 | $50,829,746 | JAMES CONSTRUCTION GROUP, LLC | +11.9% | 4 |
| Aug 4, 2022 | 0598-02-116F 2022(929) | Brazoria Houston |
CONSTRUCT BRIDGESH 288 · | $53,828,977 | $49,368,479 | GRANITE CONSTRUCTION COMPANY | -8.3% | 5 |
| Aug 4, 2022 | 0354-06-030STP 2022(582)HES | Andrews Odessa |
CONSTRUCT BRIDGESH 115 · | $29,597,172 | $36,740,467 | FNF CONSTRUCTION, INC. | +24.1% | 2 |
| Aug 4, 2022 | 0188-06-046C 188-6-46 | Brazoria Houston |
WIDEN ROAD - ADD LANESSH 36 · | $42,018,666 | $32,995,992 | ZACHRY CONSTRUCTION CORPORATION | -21.5% | 4 |
| Aug 4, 2022 | 0704-02-022BR 2022(505) | Childress Childress |
WIDENING OF A NON-FREEWAY FACILITYFM 268 · | $14,003,777 | $17,182,341 | RK HALL, LLC | +22.7% | 6 |
| Aug 4, 2022 | 0543-01-067F 2022(947) | Waller Houston |
SURFACING/ROADWAY RESTORATIONFM 359 · | $14,016,312 | $13,133,459 | DURWOOD GREENE CONSTRUCTION CO. | -6.3% | 3 |
| Aug 4, 2022 | 0114-11-086C 114-11-86 | Waller Houston |
CONSTRUCT FRONTAGE ROADSUS 290 · | $10,830,699 | $10,998,209 | SER CONSTRUCTION PARTNERS, LLC | +1.5% | 9 |
| Aug 4, 2022 | 2744-01-032C 2744-1-32 | Montgomery Houston |
BASE REPAIR, OCST, 1.5" HMA LEVEL-UP AND 1.5" HMAFM 2854 · | $11,121,060 | $10,866,956 | TEXAS MATERIALS GROUP, INC. | -2.3% | 4 |
| Aug 4, 2022 | 0200-14-093F 2022(893) | Jefferson Beaumont |
SURFACING/ROADWAY RESTORATIONUS 69 · | $10,405,752 | $10,175,549 | ELITE CONTRACTORS AND EQUIPMENT LTD | -2.2% | 3 |
| Aug 4, 2022 | 0922-33-159BR 2021(892) | Webb Laredo |
BRIDGE REPLACEMENTCR · | $3,720,253 | $6,734,391 | RELMCO, INC. | +81.0% | 1 |
| Aug 4, 2022 | 0143-08-098BR 2023(007) | De Witt Yoakum |
BRIDGE MAINTENANCEUS 87 · | $4,850,392 | $6,692,309 | CEKRA INC. | +38.0% | 3 |
| Aug 4, 2022 | 0049-09-089STP 2022(860)HES | Brazos Bryan |
WIDEN ROAD - ADD LANESUS 190 · | $4,374,161 | $5,909,647 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +35.1% | 5 |
| Aug 4, 2022 | 3093-01-002STP 2022(729)HES | Cameron Pharr |
SAFETYFM 3069 · | $4,967,569 | $5,289,301 | FOREMOST PAVING, INC. | +6.5% | 4 |
1–100 of 271Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.