107Let jobs
$318,142,326Total low bids
$335,995,632Total estimates
-5.3%Low bids vs estimates
May 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 24, 2021 | 6377-35-001RMC - 637735001 | Brown Brownwood |
TRAFFIC SIGNAL MAINTENANCEUS 377 · | $296,840 | $346,162 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +16.6% | 1 |
| May 24, 2021 | 6350-10-001MMC - 635010001 | Brown Brownwood |
FLEXBASE AND AGGREGATE (MATERIALS ONLY)US 377 · | $84,026 | $92,898 | VULCAN CONSTRUCTION MATERIALS, LLC | +10.6% | 1 |
| May 6, 2021 | 0168-09-181F 2021(518) | Randall Amarillo |
HIGHWAY IMPROVEMENTIH 27 · | $26,010,565 | $30,998,613 | ALLEN BUTLER CONSTRUCTION, INC. | +19.2% | 3 |
| May 6, 2021 | 0042-09-124C 42-9-124 | Hall Childress |
A NEW LOCATION FREEWAY FACILITYUS 287 · | $11,569,452 | $13,478,723 | CK NEWBERRY, LLC | +16.5% | 6 |
| May 6, 2021 | 0055-15-072F 2021(567) | McLennan Waco |
INTERSECTION AND PEDESTRIAN IMPROVEMENTSUS 84 · | $10,621,678 | $9,930,694 | CROSS PLUS CONSTRUCTION, LLC | -6.5% | 4 |
| May 6, 2021 | 6376-92-001TMC - 637692001 | Travis Austin |
ROADSIGN ASSEMBLIESIH 35 · | $6,421,174 | $8,675,263 | TEXAS CORRUGATORS | +35.1% | 3 |
| May 6, 2021 | 0009-02-067CM 2021(533) | Dallas Dallas |
RECONFIGURE INTERSECTION WITH SIDEWALK IMPROVEMENTSH 78 · | $6,018,989 | $6,336,367 | AUSTIN BRIDGE & ROAD SERVICES, LP | +5.3% | 10 |
| May 6, 2021 | 0404-02-036STP 1902(142) | Stephens Brownwood |
REHABILITATE EXISTING ROADWAYUS 183 · | $6,433,483 | $5,955,500 | FOUTSCO PAVING COMPANY, LLC | -7.4% | 4 |
| May 6, 2021 | 0118-08-076BR 2021(343) | Nacogdoches Lufkin |
BRIDGE REPLACEMENTSH 21 · | $5,795,199 | $5,478,921 | STATELINE CONSTRUCTION, LLC | -5.5% | 6 |
| May 6, 2021 | 0002-05-048STP 2021(541)HES | Hudspeth El Paso |
HAZARD ELIMINATION & SAFETYIH 10 · | $4,789,182 | $4,097,877 | LESNA CONSTRUCTION, INC. | -14.4% | 10 |
| May 6, 2021 | 0067-02-071BR 2021(558) | Swisher Lubbock |
BRIDGE MAINTENANCEIH 27 · | $3,360,094 | $3,742,466 | GILVIN-TERRILL, LTD. | +11.4% | 3 |
| May 6, 2021 | 2374-03-074STP 2021(539)MM | Dallas Dallas |
IMPROVE APPROACH, WIDEN BRIDGE TO ADD TURN LANEIH 20 · | $2,425,559 | $3,246,151 | IBCTX, LLC | +33.8% | 5 |
| May 6, 2021 | 0043-08-085F 2021(514) | Wichita Wichita Falls |
REHABILITATE EXISTING ROADWAYUS 287 · | $3,319,374 | $3,141,098 | ZACK BURKETT CO. | -5.4% | 2 |
| May 6, 2021 | 6377-31-001RMC - 637731001 | Dallas Dallas |
METAL BEAM GUARD FENCE REPAIRSH 78 · | $6,527,440 | $3,097,080 | FIREMAN EXCAVATING, INC. | -52.6% | 4 |
| May 6, 2021 | 0026-02-037F 2021(544) | Fayette Yoakum |
BICYCLE AND PEDESTRIAN IMPROVEMENTSUS 90 · | $3,012,747 | $2,637,333 | TI-ZACK CONCRETE, INC. | -12.5% | 5 |
| May 6, 2021 | 0002-02-055F 2021(540) | El Paso El Paso |
SURFACING/ROADWAY RESTORATIONSH 20 · | $2,591,710 | $2,606,598 | LESNA CONSTRUCTION, INC. | +0.6% | 5 |
| May 6, 2021 | 0932-02-052BR 2021(293) | Jefferson Beaumont |
BRIDGE REPLACEMENTFM 365 · | $1,813,050 | $2,465,716 | RAGLE CONSTRUCTION, INC. | +36.0% | 3 |
| May 6, 2021 | 6378-34-001MMC - 637834001 | Hutchinson Amarillo |
ASPHALTSH 136 · | $2,192,260 | $2,239,540 | ERGON ASPHALT & EMULSIONS, INC. | +2.2% | 2 |
| May 6, 2021 | 6378-35-001MMC - 637835001 | Hemphill Amarillo |
ASPHALTUS 83 · | $2,022,520 | $2,093,360 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +3.5% | 2 |
| May 6, 2021 | 1487-01-008C 1487-1-8 | Fannin Paris |
REHABILITATE EXISTING ROADWAYFM 1552 · | $1,641,195 | $1,844,735 | HIGHWAY 19 CONSTRUCTION LLC | +12.4% | 4 |
| May 6, 2021 | 0047-06-170C 47-6-170 | Collin Dallas |
REPAIR ROADWAYUS 75 · | $1,879,442 | $1,821,513 | O. TREVINO CONSTRUCTION, LLC | -3.1% | 4 |
| May 6, 2021 | 6376-42-001RMC - 637642001 | Pecos Odessa |
MILL AND INLAYIH 10 · | $1,787,072 | $1,687,006 | REECE ALBERT, INC. | -5.6% | 4 |
| May 6, 2021 | 0830-01-021C 830-1-21 | Edwards San Angelo |
REPAIR ROADWAYRM 335 · | $1,762,404 | $1,670,792 | RELMCO, INC. | -5.2% | 7 |
| May 6, 2021 | 0918-00-326C 918-00-326 | Dallas Dallas |
DMS REHABILITATION AND TRAFFIC SIGNAL UPGRADESVA · | $2,144,617 | $1,649,566 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | -23.1% | 4 |
| May 6, 2021 | 6377-79-001RMC - 637779001 | Tarrant Fort Worth |
SWEEPING AND DEBRIS REMOVALIH 20 · | $1,475,019 | $1,568,948 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | +6.4% | 3 |
| May 6, 2021 | 0914-00-455C 914-00-455 | Travis Austin |
TRAFFIC SIGNAL IMPROVEMENTSVA · | $1,387,561 | $1,305,818 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -5.9% | 2 |
| May 6, 2021 | 6378-33-001MMC - 637833001 | Armstrong Amarillo |
ASPHALTUS 287 · | $1,156,860 | $1,140,540 | ERGON ASPHALT & EMULSIONS, INC. | -1.4% | 2 |
| May 6, 2021 | 6375-03-001RMC - 637503001 | Parker Fort Worth |
GUARDRAIL INSTALLATION AND REPAIRIH 20 · | $1,313,386 | $1,119,924 | ELITE CASTLE RESOURCES LLC | -14.7% | 4 |
| May 6, 2021 | 0694-01-031BR 2021(560) | Sabine Lufkin |
BRIDGE MAINTENANCEFM 83 · | $931,926 | $1,095,147 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | +17.5% | 4 |
| May 6, 2021 | 6379-77-001RMC - 637977001 | Potter Amarillo |
FULL DEPTH CONCRETE REPAIRIH 40 · | $1,195,660 | $1,074,720 | WINDING ROAD CONSTRUCTION, INC. | -10.1% | 3 |
| May 6, 2021 | 2224-01-120F 2021(565) | Ector Odessa |
INTERSECTION IMPROVEMENTS - INSTALL TRAFFIC SIGNALSL 338 · | $1,056,836 | $1,058,414 | SIEMENS MOBILITY, INC. | +0.1% | 4 |
| May 6, 2021 | 0511-02-026BR 2021(548) | Comal San Antonio |
BRIDGE REPLACEMENTRM 32 · | $978,551 | $1,044,625 | SB CONTRACTORS LLC | +6.8% | 11 |
| May 6, 2021 | 0100-13-027F 2021(568) | Bee Corpus Christi |
TRAFFIC SIGNAL IMPROVEMENTSBU 181J · | $1,125,262 | $841,762 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -25.2% | 8 |
| May 6, 2021 | 0191-02-068F 2021(511) | Cherokee Tyler |
INTERSECTION IMPROVEMENTUS 69 · | $751,683 | $802,060 | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | +6.7% | 2 |
| May 6, 2021 | 6374-29-001BPM - 637429001 | Lubbock Lubbock |
BRIDGE PREVENTIVE MAINTENANCEIH 27 · | $775,818 | $772,300 | BLACKSTONE CONCRETE VENTURES, LLC | -0.5% | 8 |
| May 6, 2021 | 6377-00-001RMC - 637700001 | Dallas Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRSH 183 · | $1,119,909 | $725,263 | AUSTIN BRIDGE & ROAD SERVICES, LP | -35.2% | 5 |
| May 6, 2021 | 0495-08-121BR 2021(433) | Harrison Atlanta |
BRIDGE MAINTENANCEIH 20 · | $699,254 | $692,721 | DBI SERVICES, LLC | -0.9% | 7 |
| May 6, 2021 | 0915-00-202C 915-00-202 | Bexar San Antonio |
PURCHASE AND INSTALL SIGNS & EQUIPVA · | $636,414 | $676,228 | THE LEVY COMPANY, INC. | +6.3% | 6 |
| May 6, 2021 | 6375-48-001RMC - 637548001 | Tarrant Fort Worth |
SWEEPING AND DEBRIS REMOVALIH 820 · | $712,162 | $671,938 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -5.6% | 3 |
| May 6, 2021 | 6379-78-001MMC - 637978001 | Bell Waco |
HOT MIXUS 190 · | $832,178 | $656,600 | TEXAS MATERIALS GROUP, INC. | -21.1% | 5 |
| May 6, 2021 | 6353-69-001RMC - 635369001 | Galveston Houston |
REPLACE BEARING PADS,TRAFFIC RAIL AND MBSH 3 · | $561,569 | $555,294 | ISI CONTRACTING, INC. | -1.1% | 3 |
| May 6, 2021 | 6379-79-001MMC - 637979001 | Bosque Waco |
HOT MIXSH 6 · | $637,025 | $543,500 | BIG CREEK CONSTRUCTION, LTD. | -14.7% | 3 |
| May 6, 2021 | 6380-24-001MMC - 638024001 | Falls Waco |
HOT MIXSH 6 · | $673,988 | $540,900 | BIG CREEK CONSTRUCTION, LTD. | -19.7% | 3 |
| May 6, 2021 | 0919-03-062STP 2020(163)TAPS | Harrison Atlanta |
CONSTRUCT SIDEWALKS AND CURB RAMPSCS · | $546,582 | $477,174 | BLACKSTONE CONCRETE VENTURES, LLC | -12.7% | 6 |
| May 6, 2021 | 6380-22-001MMC - 638022001 | Hill Waco |
HOT MIXSH 81 · | $546,887 | $458,550 | BIG CREEK CONSTRUCTION, LTD. | -16.2% | 3 |
| May 6, 2021 | 6377-84-001RMC - 637784001 | Denton Dallas |
POTHOLE REPAIRIH 35E · | $411,000 | $417,000 | JAGOE-PUBLIC COMPANY | +1.5% | 4 |
| May 6, 2021 | 0920-02-096STP 2021(263)SRS | Liberty Beaumont |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $390,153 | $388,842 | SJ&J CONSTRUCTION, LLC | -0.3% | 6 |
| May 6, 2021 | 6375-31-001BPM - 637531001 | Ector Odessa |
BRIDGE REPAIRIH 20 · | $426,146 | $388,307 | MPB, INC. | -8.9% | 11 |
| May 6, 2021 | 0231-01-057C 231-1-57 | Lampasas Brownwood |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TUS 190 · | $367,011 | $387,267 | TEXAS MATERIALS GROUP, INC. | +5.5% | 3 |
| May 6, 2021 | 0245-05-051BR 2021(512) | Smith Tyler |
BRIDGE MAINTENANCESH 64 · | $394,396 | $332,397 | HIGHWAY 19 CONSTRUCTION LLC | -15.7% | 10 |
| May 6, 2021 | 0911-00-108F 2021(562) | Angelina Lufkin |
INTERSECTION IMPROVEMENTVA · | $361,208 | $311,291 | TRAF-TEX, INC. | -13.8% | 4 |
| May 6, 2021 | 0389-02-048BR 2021(529) | Chambers Beaumont |
BRIDGE MAINTENANCESH 146 · | $255,813 | $230,324 | TALBRAN ENTERPRISES LLC | -10.0% | 3 |
| May 6, 2021 | 6380-23-001MMC - 638023001 | Limestone Waco |
HOT MIXUS 84 · | $206,045 | $178,000 | BIG CREEK CONSTRUCTION, LTD. | -13.6% | 3 |
| May 6, 2021 | 0908-33-100C 908-33-100 | Taylor Abilene |
DRAINAGE IMPROVEMENTSVA · | $197,805 | $174,853 | TALBRAN ENTERPRISES LLC | -11.6% | 8 |
| May 6, 2021 | 6359-11-001TMC - 635911001 | Garza Maintenance Division |
DELINEATORS POST RDC (MATERIALS ONLY)US 84 · | $167,427 | $165,212 | CENTERLINE SUPPLY, INC. | -1.3% | 3 |
| May 6, 2021 | 0046-01-068F 2021(534) | Red River Paris |
INSTALL ILLUMINATIONUS 82 · | $82,130 | $81,810 | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | -0.4% | 6 |
| May 6, 2021 | 0050-06-094STP 2021(331)HES | Harris Houston |
SAFETY LIGHTINGBU 290H · | $117,718 | $78,734 | THIRD COAST SERVICES LLC | -33.1% | 7 |
| May 5, 2021 | 0074-05-098NH 2B20(014) | San Patricio Corpus Christi |
WIDEN FREEWAYIH 37 · | $88,966,508 | $83,990,747 | WEBBER, LLC | -5.6% | 6 |
| May 5, 2021 | 0165-02-065F 2021(509) | Smith Tyler |
ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDEUS 271 · | $12,539,380 | $12,377,401 | MADDEN CONTRACTING COMPANY, LLC. | -1.3% | 7 |
| May 5, 2021 | 0073-12-015C 73-12-15 | Bexar San Antonio |
RESURFACE ROADWAYUS 181 · | $12,566,158 | $8,387,879 | CLARK CONSTRUCTION OF TEXAS, INC. | -33.3% | 9 |
| May 5, 2021 | 0002-10-038STP 2021(554)HES | Hudspeth El Paso |
HAZARD ELIMINATION & SAFETYIH 10 · | $6,491,678 | $5,286,278 | LESNA CONSTRUCTION, INC. | -18.6% | 10 |
| May 5, 2021 | 2589-01-023BR 2021(559) | Angelina Lufkin |
BRIDGE REPLACEMENTFM 2497 · | $5,973,730 | $5,264,189 | A. L. HELMCAMP, INC. | -11.9% | 5 |
| May 5, 2021 | 6375-52-001RMC - 637552001 | Harris Houston |
CONCRETE SPALL REPAIRIH 45 · | $4,644,055 | $4,981,840 | ROY JORGENSEN ASSOCIATES, INC. | +7.3% | 3 |
| May 5, 2021 | 0887-01-039STP 2021(172)HES | Midland Odessa |
INTERSECTION IMPROVEMENTS & SAFETY LIGHTINGFM 307 · | $5,451,297 | $4,744,172 | RAGLE CONSTRUCTION, INC. | -13.0% | 4 |
| May 5, 2021 | 0028-06-083STP 2021(526)HES | Jefferson Beaumont |
TRAFFIC SIGNAL IMPROVEMENTSUS 90 · | $5,019,350 | $3,878,702 | THIRD COAST SERVICES LLC | -22.7% | 5 |
| May 5, 2021 | 0229-01-046F 2021(564) | Ector Odessa |
HAZARD ELIMINATION & SAFETYUS 385 · | $5,571,112 | $3,694,500 | GRATIOT CONSTRUCTION, LTD. | -33.7% | 11 |
| May 5, 2021 | 0032-07-036F 2021(521) | Stonewall Abilene |
INTERSECTION IMPROVEMENTUS 83 · | $3,752,489 | $3,582,033 | FOUTSCO PAVING COMPANY, LLC | -4.5% | 6 |
| May 5, 2021 | 0020-08-046STP 2021(555)HES | Presidio El Paso |
HAZARD ELIMINATION & SAFETYUS 67 · | $2,485,475 | $3,010,301 | VECTOR UTILITIES LLC | +21.1% | 6 |
| May 5, 2021 | 0152-01-080CC 152-1-80 | Travis Austin |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TUS 183 · | $3,169,832 | $2,851,509 | COX COMMERCIAL CONSTRUCTION LLC | -10.0% | 6 |
| May 5, 2021 | 0995-01-026BR 2021(538) | Navarro Dallas |
BRIDGE REPLACEMENTFM 637 · | $2,418,129 | $2,712,402 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +12.2% | 9 |
| May 5, 2021 | 2524-01-011STP 2021(546) | Matagorda Yoakum |
WIDEN ROADWAY AND INSTALL CENTERLINE RUMBLE STRIPSFM 2611 · | $2,827,153 | $2,706,169 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -4.3% | 6 |
| May 5, 2021 | 6377-02-001RMC - 637702001 | Tarrant Fort Worth |
METAL BEAM GUARD FENCE REPAIRIH 35W · | $4,125,167 | $2,440,889 | ELITE CASTLE RESOURCES LLC | -40.8% | 6 |
| May 5, 2021 | 0182-02-046F 2021(566) | Comanche Brownwood |
RESURFACE ROADWAYSH 36 · | $3,078,171 | $2,320,589 | NORTHEASTERN PAVERS, LLC | -24.6% | 9 |
| May 5, 2021 | 2551-01-011STP 2021(542)MM | El Paso El Paso |
RECONSTRUCT EXISTING ROADWAYFM 1905 · | $3,214,798 | $2,157,121 | J. A. R. CONCRETE, INC. | -32.9% | 3 |
| May 5, 2021 | 0138-16-006F 2021(712) | Gregg Tyler |
SEAL COATUS 259 · | $1,800,971 | $1,966,926 | D. I. J. CONSTRUCTION, INC. | +9.2% | 5 |
| May 5, 2021 | 0435-01-080STP 2021(537)HES | Lamar Paris |
HAZARD ELIMINATION & SAFETYFM 38 · | $1,972,306 | $1,748,082 | HIGHWAY 19 CONSTRUCTION LLC | -11.4% | 7 |
| May 5, 2021 | 0902-90-111C 902-90-111 | Tarrant Fort Worth |
REPLACE DYNAMIC MESSAGE SIGNSVA · | $2,215,278 | $1,638,107 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -26.1% | 4 |
| May 5, 2021 | 6379-52-001RMC - 637952001 | Tom Green San Angelo |
MILL AND INLAYUS 87 · | $1,559,998 | $1,537,621 | REECE ALBERT, INC. | -1.4% | 2 |
| May 5, 2021 | 0916-00-216C 916-00-216 | Nueces Corpus Christi |
INSTALL/REPLACE SIGNSVA · | $1,653,999 | $1,431,539 | HIGHWAY BARRICADES AND SERVICES, LLC | -13.4% | 8 |
| May 5, 2021 | 6375-47-001RMC - 637547001 | Tarrant Fort Worth |
METAL BEAM GUARD FENCE REPAIRIH 820 · | $1,613,878 | $1,387,648 | SHORT-LINE CORPORATION | -14.0% | 7 |
| May 5, 2021 | 6377-23-001RMC - 637723001 | Dallas Dallas |
REPAIR/REPLACE CONCRETE BARRIERSH 78 · | $1,429,950 | $1,118,400 | ROY JORGENSEN ASSOCIATES, INC. | -21.8% | 7 |
| May 5, 2021 | 0907-00-223F 2021(513) | Tom Green San Angelo |
HAZARD ELIMINATION & SAFETYVA · | $1,121,543 | $1,017,760 | PMI PAVEMENT MARKING, LLC | -9.3% | 10 |
| May 5, 2021 | 6379-45-001RMC - 637945001 | Limestone Waco |
BASE FAILURE PAVEMENT REPAIRFM 339 · | $1,143,984 | $887,745 | TEXAS MATERIALS GROUP, INC. | -22.4% | 4 |
| May 5, 2021 | 6379-70-001RMC - 637970001 | Hidalgo Pharr |
SWEEPING AND DEBRIS REMOVALIH 2 · | $941,294 | $881,300 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -6.4% | 4 |
| May 5, 2021 | 6376-99-001RMC - 637699001 | Dallas Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 80 · | $1,091,495 | $870,454 | TEXAS MATERIALS GROUP, INC. | -20.3% | 4 |
| May 5, 2021 | 0135-02-063STP 2021(535)HES | Collin Dallas |
INSTALLATION OF TRAFFIC SIGNALSUS 380 · | $966,475 | $851,200 | DURABLE SPECIALTIES, INC. | -11.9% | 3 |
| May 5, 2021 | 0133-05-030F 2021(515) | Baylor Wichita Falls |
REHABILITATE EXISTING ROADWAYSH 114 · | $777,697 | $840,911 | ZACK BURKETT CO. | +8.1% | 5 |
| May 5, 2021 | 1464-01-018STP 2021(531)HES | Chambers Beaumont |
HAZARD ELIMINATION & SAFETYFM 1663 · | $856,973 | $736,394 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -14.1% | 3 |
| May 5, 2021 | 0508-01-381C 508-1-381 | Harris Houston |
LANDSCAPE DEVELOPMENTIH 10 · | $703,825 | $655,025 | TEXAS WALL & LANDSCAPE | -6.9% | 2 |
| May 5, 2021 | 6379-64-001RMC - 637964001 | Hill Waco |
BASE FAILURE PAVEMENT REPAIRFM 934 · | $862,510 | $631,827 | NORTHEASTERN PAVERS, LLC | -26.7% | 6 |
| May 5, 2021 | 6379-44-001RMC - 637944001 | McLennan Waco |
BASE FAILURE PAVEMENT REPAIRFM 1860 · | $691,038 | $534,686 | TEXAS MATERIALS GROUP, INC. | -22.6% | 3 |
| May 5, 2021 | 6380-19-001RMC - 638019001 | Bailey Lubbock |
MOWING HIGHWAY RIGHT OF WAYFM 37 · | $623,616 | $490,776 | CM COMPANY | -21.3% | 5 |
| May 5, 2021 | 0915-00-200C 915-00-200 | Bexar San Antonio |
INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEMVA · | $639,149 | $477,879 | THIRD COAST SERVICES LLC | -25.2% | 7 |
| May 5, 2021 | 6380-18-001RMC - 638018001 | Lamb Lubbock |
MOWING HIGHWAY RIGHT OF WAYFM 37 · | $641,552 | $467,331 | BERT WHITAKER | -27.2% | 5 |
| May 5, 2021 | 6377-34-001RMC - 637734001 | Kaufman Dallas |
DITCH CLEANING AND RESHAPINGIH 20 · | $493,200 | $436,165 | BECK-REIT & SONS, LTD. | -11.6% | 5 |
| May 5, 2021 | 0915-45-055BR 2021(142) | Medina San Antonio |
BRIDGE REPLACEMENTCR · | $442,828 | $419,500 | DELGADO'S CONTRACTORS, LLC | -5.3% | 11 |
| May 5, 2021 | 6378-49-001RMC - 637849001 | Maverick Laredo |
CLEANING AND SWEEPING HIGHWAYSFM 375 · | $306,535 | $339,871 | RK POWER DRIVE SERVICES, INC. | +10.9% | 2 |
| May 5, 2021 | 6379-36-001RMC - 637936001 | El Paso El Paso |
SWEEPING AND DEBRIS REMOVALIH 10 · | $304,025 | $319,350 | E. G. L. CONSTRUCTION, INC. | +5.0% | 2 |
| May 5, 2021 | 0919-03-063STP 2021(657)FRS1 | Harrison Atlanta |
RAILROAD CROSSING UPGRADESCS · | $121,034 | $313,319 | EAST TEXAS BRIDGE, INC. | +158.9% | 1 |
| May 5, 2021 | 6379-35-001RMC - 637935001 | El Paso El Paso |
SWEEPING AND DEBRIS REMOVALIH 10 · | $309,025 | $276,500 | E. G. L. CONSTRUCTION, INC. | -10.5% | 2 |
1–100 of 107Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.