172Let jobs
$422,851,665Total low bids
$459,387,313Total estimates
-8.0%Low bids vs estimates
Apr 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Apr 8, 2021 | 0128-01-116F 2021(450)HES | Brown Brownwood |
SAFETY TREAT FIXED OBJECTS & RUMBLE STRIPSUS 377 · | $974,104 | $937,757 | 3LW CIVIL LLC | -3.7% | 7 |
| Apr 8, 2021 | 6375-33-001RMC - 637533001 | Collin Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 981 · | $1,206,736 | $925,543 | D. L. LENNON INCORPORATED - CONTRACTOR | -23.3% | 4 |
| Apr 8, 2021 | 0915-00-229C 915-00-229 | Bexar San Antonio |
HIGHWAY IMPROVEMENTVA · | $1,084,790 | $916,531 | INTERSTATE BARRICADES & MARKINGS, INC. | -15.5% | 5 |
| Apr 8, 2021 | 0804-02-013F 2021(454) | Archer Wichita Falls |
REHABILITATE EXISTING ROADWAYFM 368 · | $904,400 | $853,940 | BLACKSMITH VENTURES LLC | -5.6% | 6 |
| Apr 8, 2021 | 6369-01-001RMC - 636901001 | Travis Austin |
SIGNAL REPAIR WITH EMERGENCY CALL-OUTSFM 685 · | $936,747 | $816,842 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -12.8% | 1 |
| Apr 8, 2021 | 6369-57-001RMC - 636957001 | Gonzales Yoakum |
ON CALL SPOT REPAIRSUA 90 · | $1,007,000 | $756,100 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -24.9% | 7 |
| Apr 8, 2021 | 6379-40-001RMC - 637940001 | Cameron Pharr |
SWEEPING AND DEBRIS REMOVALIH 69E · | $975,887 | $716,667 | STRIPE-A-ZONE, INC. | -26.6% | 3 |
| Apr 8, 2021 | 6368-86-001RMC - 636886001 | Travis Austin |
TRAFFIC SIGNAL MAINTENANCEIH 35 · | $633,365 | $693,686 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +9.5% | 1 |
| Apr 8, 2021 | 0186-01-025NH 2021(480) | Milam Bryan |
INSTALL FLASHING BEACONSSH 36 · | $787,447 | $557,418 | THIRD COAST SERVICES LLC | -29.2% | 6 |
| Apr 8, 2021 | 6371-95-001BPM - 637195001 | Kimble San Angelo |
CONCRETE REPAIRSUS 377 · | $561,718 | $498,855 | BLACKSMITH VENTURES LLC | -11.2% | 9 |
| Apr 8, 2021 | 6375-95-001RMC - 637595001 | Dimmit Laredo |
MISCELLANEOUS CONCRETE REPAIRUS 83 · | $337,927 | $490,655 | DIGG COMMERCIAL, LLC | +45.2% | 2 |
| Apr 8, 2021 | 6353-85-001RMC - 635385001 | Waller Houston |
REFLECTIVE PAVEMENT MARKINGS LONG LINEUS 290 · | $693,699 | $474,037 | BATTERSON, LLP | -31.7% | 6 |
| Apr 8, 2021 | 6377-80-001RMC - 637780001 | Tarrant Fort Worth |
SWEEPING AND DEBRIS REMOVALIH 20 · | $429,089 | $456,154 | SHALOM SERVICES CORPORATION | +6.3% | 4 |
| Apr 8, 2021 | 6377-33-001RMC - 637733001 | Orange Beaumont |
BUILDING CONSTRUCTIONIH 10 · | $368,280 | $449,000 | DIGG COMMERCIAL, LLC | +21.9% | 1 |
| Apr 8, 2021 | 6377-88-001RMC - 637788001 | McLennan Waco |
MISCELLANEOUS CONCRETE REPAIRFM 1860 · | $433,285 | $386,492 | DBI SERVICES, LLC | -10.8% | 6 |
| Apr 8, 2021 | 6379-50-001RMC - 637950001 | Jones Abilene |
MOWING HIGHWAY RIGHT OF WAYUS 180 · | $327,860 | $355,074 | CROSS PLUS CONSTRUCTION, LLC | +8.3% | 2 |
| Apr 8, 2021 | 6379-38-001RMC - 637938001 | Callahan Abilene |
MOWING HIGHWAY RIGHT OF WAYIH 20 · | $346,620 | $340,442 | CROSS PLUS CONSTRUCTION, LLC | -1.8% | 1 |
| Apr 8, 2021 | 6369-00-001RMC - 636900001 | Caldwell Austin |
MOWING HIGHWAY ROWUS 183 · | $298,140 | $280,161 | CEN-TEX IRRIGATION SYSTEMS, INC. | -6.0% | 3 |
| Apr 8, 2021 | 0074-06-253F 2021(550) | Nueces Corpus Christi |
ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTIONUS 181 · | $294,470 | $269,165 | HIGHWAY BARRICADES AND SERVICES, LLC | -8.6% | 5 |
| Apr 8, 2021 | 6377-69-001RMC - 637769001 | McLennan Waco |
FULL DEPTH CONCRETE REPAIRUS 77 · | $141,131 | $136,233 | CROSS PLUS CONSTRUCTION, LLC | -3.5% | 4 |
| Apr 7, 2021 | 2452-02-083F 2021(488) | Bexar San Antonio |
WIDEN ROAD - ADD LANESSL 1604 · | $166,009,497 | $148,073,104 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | -10.8% | 5 |
| Apr 7, 2021 | 1188-02-100C 1188-2-100 | Midland Odessa |
HIGHWAY IMPROVEMENTSL 250 · | $22,306,271 | $18,245,178 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -18.2% | 8 |
| Apr 7, 2021 | 0016-08-039BR 2021(485) | Bexar San Antonio |
BRIDGE REPLACEMENTSL 368 · | $7,127,370 | $6,974,797 | RELMCO, INC. | -2.1% | 8 |
| Apr 7, 2021 | 6377-30-001RMC - 637730001 | Dallas Dallas |
METAL BEAM GUARD FENCE REPAIRSL 12 · | $3,677,635 | $2,944,585 | ROY JORGENSEN ASSOCIATES, INC. | -19.9% | 7 |
| Apr 7, 2021 | 0138-10-029STP 2021(287)HES | Cass Atlanta |
SAFETY TREAT FIXED OBJECTSFM 248 · | $3,270,636 | $2,714,171 | H. V. CAVER, INC. | -17.0% | 9 |
| Apr 7, 2021 | 3510-06-026C 3510-6-26 | Harris Houston |
LANDSCAPE DEVELOPMENTSH 99 · | $3,600,122 | $2,373,434 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -34.1% | 6 |
| Apr 7, 2021 | 6376-12-001RMC - 637612001 | Jasper Beaumont |
RAISED PAVEMENT MARKINGSFM 82 · | $2,983,240 | $2,271,664 | STRIPE-A-ZONE, INC. | -23.9% | 8 |
| Apr 7, 2021 | 0002-06-058F 2021(411) | Hudspeth El Paso |
HAZARD ELIMINATION & SAFETYIH 10 · | $1,812,113 | $1,994,619 | DIAMOND SURFACE, INC. | +10.1% | 5 |
| Apr 7, 2021 | 0905-00-093C 905-00-93 | Lubbock Lubbock |
INSTALL/REPLACE SIGNSVA · | $2,218,153 | $1,705,956 | L&L COMPANY | -23.1% | 6 |
| Apr 7, 2021 | 6378-65-001RMC - 637865001 | Nueces Corpus Christi |
SWEEPING AND DEBRIS REMOVALUS 77 · | $2,221,497 | $1,699,246 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -23.5% | 2 |
| Apr 7, 2021 | 0914-25-008BR 1802(787) | Llano Austin |
BRIDGE REPLACEMENTCR · | $1,355,813 | $1,599,440 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +18.0% | 8 |
| Apr 7, 2021 | 6378-66-001RMC - 637866001 | San Patricio Corpus Christi |
PAVEMENT MARKINGSUS 181 · | $1,947,199 | $1,499,114 | HIGHWAY BARRICADES AND SERVICES, LLC | -23.0% | 5 |
| Apr 7, 2021 | 1690-01-132F 2021(497) | Lamar Paris |
PREVENTIVE MAINTENANCEUS 271 · | $1,413,729 | $1,317,402 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | -6.8% | 4 |
| Apr 7, 2021 | 2552-05-002F 2021(656) | El Paso El Paso |
HAZARD ELIMINATION & SAFETYSL 375 · | $1,214,385 | $1,287,746 | LESNA CONSTRUCTION, INC. | +6.0% | 2 |
| Apr 7, 2021 | 0913-09-102BR 2020(610) | Wharton Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $1,366,306 | $1,244,084 | SB CONTRACTORS LLC | -8.9% | 7 |
| Apr 7, 2021 | 6375-79-001RMC - 637579001 | Dallas Dallas |
TRAFFIC SIGNAL MAINTENANCEIH 35E · | $1,117,825 | $1,153,793 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +3.2% | 4 |
| Apr 7, 2021 | 6377-91-001MMC - 637791001 | Lamar Paris |
FLEXIBLE BASEUS 82 · | $995,000 | $995,475 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | +0.0% | 3 |
| Apr 7, 2021 | 6373-96-001RMC - 637396001 | Washington Bryan |
HMA MILL AND INLAYUS 290 · | $984,574 | $986,327 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +0.2% | 4 |
| Apr 7, 2021 | 0459-01-080BR 2021(483) | Freestone Bryan |
BRIDGE MAINTENANCEFM 488 · | $1,007,868 | $926,052 | GIBSON & ASSOCIATES, INC. | -8.1% | 11 |
| Apr 7, 2021 | 6376-14-001RMC - 637614001 | Walker Bryan |
SPOT BASE REPAIRIH 45 · | $1,129,830 | $828,385 | BIG CREEK CONSTRUCTION, LTD. | -26.7% | 5 |
| Apr 7, 2021 | 6376-98-001RMC - 637698001 | El Paso El Paso |
ASPHALT PAVEMENT REPAIRIH 10 · | $732,700 | $636,334 | SYNERGY PROJECT CONTRACTORS, INC. | -13.2% | 3 |
| Apr 7, 2021 | 2121-04-112STP 2021(477)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYIH 10 · | $406,492 | $580,229 | TRI STATE ELECTRIC, LTD. | +42.7% | 2 |
| Apr 7, 2021 | 6376-97-001RMC - 637697001 | El Paso El Paso |
SPALL REPAIRIH 10 · | $433,500 | $490,400 | LESNA CONSTRUCTION, INC. | +13.1% | 3 |
| Apr 7, 2021 | 0912-31-286C 912-31-286 | Brazoria Houston |
SURFACING/ROADWAY RESTORATIONCR · | $523,683 | $481,707 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -8.0% | 3 |
| Apr 7, 2021 | 0062-07-094STP 2021(325) | Harrison Atlanta |
IMPROVE TRAFFIC SIGNALSUS 59 · | $516,818 | $468,446 | STRIPING TECHNOLOGY, L.P. | -9.4% | 2 |
| Apr 7, 2021 | 0909-22-180BR 1802(502) | McLennan Waco |
REPLACE BRIDGE AND APPROACHESFD · | $468,265 | $458,027 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -2.2% | 8 |
| Apr 7, 2021 | 6375-80-001RMC - 637580001 | Galveston Houston |
PUMP STATION & DRAINAGE SYSTEM CLEANINGSH 146 · | $404,343 | $439,193 | SHALOM SERVICES CORPORATION | +8.6% | 2 |
| Apr 7, 2021 | 0882-02-059STP 2021(474)HES | Orange Beaumont |
HAZARD ELIMINATION & SAFETYFM 1006 · | $597,314 | $403,662 | SJ&J CONSTRUCTION, LLC | -32.4% | 6 |
| Apr 7, 2021 | 0907-14-009BR 2021(023) | Coke San Angelo |
BRIDGE REPLACEMENTCR · | $364,847 | $398,585 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +9.2% | 5 |
| Apr 7, 2021 | 6368-89-001RMC - 636889001 | Travis Austin |
DISTRICTWIDE LARGE SIGN MAINTENANCEUS 183 · | $329,960 | $388,451 | THE LEVY COMPANY, INC. | +17.7% | 3 |
| Apr 7, 2021 | 0368-03-037STP 2021(467)HES | Jefferson Beaumont |
CONSTRUCT NEW ROADWAY LANESSH 124 · | $426,699 | $362,017 | TEXAS MATERIALS GROUP, INC. | -15.2% | 4 |
| Apr 7, 2021 | 0388-03-081STP 2021(475)HES | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYSH 146 · | $389,911 | $352,845 | TEXAS MATERIALS GROUP, INC. | -9.5% | 6 |
| Apr 7, 2021 | 1767-03-020F 2021(455) | Montague Wichita Falls |
REHABILITATE EXISTING ROADWAYFM 1816 · | $327,495 | $305,567 | EUROVIA ATLANTIC COAST LLC | -6.7% | 5 |
| Apr 7, 2021 | 6378-85-001RMC - 637885001 | Webb Laredo |
CLEANING AND SWEEPING HIGHWAYSIH 35 · | $644,315 | $302,340 | STRIPE-A-ZONE, INC. | -53.1% | 4 |
| Apr 7, 2021 | 0914-05-209C 914-5-209 | Williamson Austin |
LANDSCAPE DEVELOPMENTVA · | $286,294 | $288,957 | TIGHT LINE CONSTRUCTION, LLC | +0.9% | 4 |
| Apr 7, 2021 | 6375-67-001RMC - 637567001 | Lubbock Lubbock |
MOWING HIGHWAY RIGHT OF WAYIH 27 · | $342,468 | $284,118 | CLASSIC IRRIGATION & LANDSCAPE LLC | -17.0% | 3 |
| Apr 7, 2021 | 0720-02-097F 2021(493) | Montgomery Houston |
INTERSECTION IMPROVEMENTS WITH RIGHT TURN LANEFM 149 · | $462,569 | $272,610 | CITYLYNX, INC. | -41.1% | 3 |
| Apr 7, 2021 | 6376-11-001RMC - 637611001 | Harris Houston |
PAVEMENT MARKINGSSH 99 · | $446,084 | $262,181 | STRIPE LINES, INC. | -41.2% | 8 |
| Apr 7, 2021 | 0033-05-095C 33-5-95 | Jones Abilene |
CONCRETE PAVEMENTUS 83 · | $264,888 | $251,560 | O. TREVINO CONSTRUCTION, LLC | -5.0% | 6 |
| Apr 7, 2021 | 6368-92-001RMC - 636892001 | Llano Austin |
MOWING HIGHWAY ROWSH 71 · | $260,660 | $234,646 | R&M INCORPORATED | -10.0% | 2 |
| Apr 7, 2021 | 0183-01-049F 2021(452) | Comanche Brownwood |
INTERSECTION IMPROVEMENTSH 36 · | $218,533 | $199,254 | SEFBO PIPELINE BRIDGE, INCORPORATED | -8.8% | 5 |
| Apr 7, 2021 | 0289-02-018F 2021(453) | Mills Brownwood |
INTERSECTION IMPROVEMENTSH 16 · | $205,816 | $187,585 | SEFBO PIPELINE BRIDGE, INCORPORATED | -8.9% | 6 |
| Apr 7, 2021 | 0914-26-009BR 2017(195) | Mason Austin |
REHABILITATE BRIDGECS · | $209,008 | $173,539 | BLACKSMITH VENTURES LLC | -17.0% | 10 |
| Apr 7, 2021 | 6378-74-001RMC - 637874001 | Webb Laredo |
CLEANING AND SWEEPING HIGHWAYSUS 83 · | $329,676 | $150,690 | STRIPE-A-ZONE, INC. | -54.3% | 6 |
| Apr 7, 2021 | 0043-06-096F 2021(448) | Wilbarger Wichita Falls |
INSTALL/REPLACE SIGNSUS 70 · | $269,156 | $143,320 | MARCOM'S MOWING SERVICE, LLC | -46.8% | 7 |
| Apr 6, 2021 | 6377-45-001MMC - 637745001 | Lubbock Lubbock |
ASPHALTIH 27 · | $295,500 | $247,250 | MARTIN RESOURCE MANAGEMENT CORPORATION | -16.3% | 1 |
| Apr 6, 2021 | 6377-37-001MMC - 637737001 | Lamb Lubbock |
EMULSIONUS 84 · | $285,000 | $233,100 | ERGON ASPHALT & EMULSIONS, INC. | -18.2% | 1 |
| Apr 6, 2021 | 6377-39-001MMC - 637739001 | Hale Lubbock |
EMULSIONIH 27 · | $280,000 | $232,600 | ERGON ASPHALT & EMULSIONS, INC. | -16.9% | 1 |
| Apr 6, 2021 | 6377-36-001MMC - 637736001 | Terry Lubbock |
EMULSIONUS 62 · | $207,500 | $167,650 | ERGON ASPHALT & EMULSIONS, INC. | -19.2% | 1 |
| Apr 6, 2021 | 6377-38-001MMC - 637738001 | Lubbock Lubbock |
EMULSIONIH 27 · | $105,000 | $89,650 | ERGON ASPHALT & EMULSIONS, INC. | -14.6% | 1 |
| Apr 5, 2021 | 6377-90-001RMC - 637790001 | Victoria Yoakum |
JANITORIAL MAINTENANCEUS 59 · | $20,740 | $19,336 | ALPHA AND OMEGA CLEANING SERVICES, LLC | -6.8% | 4 |
| Apr 5, 2021 | 6377-67-001RMC - 637767001 | Jackson Yoakum |
JANITORIAL MAINTENANCESH 111 · | $10,965 | $10,186 | ALPHA AND OMEGA CLEANING SERVICES, LLC | -7.1% | 4 |
101–172 of 172‹ Prev
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.