111Let jobs
$298,135,232Total low bids
$325,404,729Total estimates
-8.4%Low bids vs estimates
Jan 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jan 26, 2021 | 6375-21-001MMC - 637521001 | Trinity Lufkin |
ASPHALTIC PATCHING MATERIALUS 287 · | $268,125 | $214,819 | WALLER COUNTY ASPHALT INC. | -19.9% | 3 |
| Jan 21, 2021 | 6375-07-001RMC - 637507001 | Red River Paris |
ON CALL TREE TRIMMING AND REMOVALUS 82 · | $238,550 | $191,263 | EASTGATE SERVICES | -19.8% | 4 |
| Jan 20, 2021 | 6368-60-001BPM - 636860001 | Shelby Lufkin |
BRIDGE PREVENTATIVE MAINTENANCEUS 59 · | $256,658 | $235,526 | SJ&J CONSTRUCTION, LLC | -8.2% | 8 |
| Jan 20, 2021 | 6373-19-001BPM - 637319001 | Houston Lufkin |
BRIDGE PREVENTIVE MAINTENANCESL 304 · | $229,713 | $206,123 | BOEN LANDSCAPING & IRRIGATION, LLC | -10.3% | 7 |
| Jan 13, 2021 | 6373-70-001RMC - 637370001 | San Augustine Lufkin |
REPAIR AND MAINTENANCE OF MBGFUS 96 · | $251,740 | $209,878 | JCW CONSTRUCTION, LLC | -16.6% | 4 |
| Jan 13, 2021 | 6372-35-001MMC - 637235001 | Liberty Beaumont |
LIMESTONE ROCK ASPHALT MATERIAL ONLYUS 90 · | $114,276 | $117,996 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.3% | 2 |
| Jan 13, 2021 | 6370-30-001MMC - 637030001 | Jasper Beaumont |
ASPHALTIC PATCHING MATERIAL ONLYUS 190 · | $133,200 | $92,600 | TEXAS MATERIALS GROUP, INC. | -30.5% | 4 |
| Jan 13, 2021 | 6372-14-001MMC - 637214001 | Liberty Beaumont |
FLEXIBLE BASE MATERIAL ONLYUS 90 · | $38,625 | $54,000 | TEXAS MATERIALS GROUP, INC. | +39.8% | 2 |
| Jan 13, 2021 | 6371-65-001MMC - 637165001 | Jefferson Beaumont |
ASPHALTIC PATCHING MATERIAL ONLYSH 347 · | $41,130 | $24,007 | WALLER COUNTY ASPHALT INC. | -41.6% | 4 |
| Jan 13, 2021 | 6372-12-001MMC - 637212001 | Jefferson Beaumont |
FLEXIBLE BASE MATERIAL ONLYSH 347 · | $18,025 | $22,050 | VULCAN CONSTRUCTION MATERIALS, LLC | +22.3% | 3 |
| Jan 13, 2021 | 6371-66-001MMC - 637166001 | Liberty Beaumont |
ASPHALTIC PATCHING MATERIAL ONLYUS 90 · | $31,680 | $15,268 | WALLER COUNTY ASPHALT INC. | -51.8% | 4 |
| Jan 13, 2021 | 6372-36-001MMC - 637236001 | Orange Beaumont |
HYDRAULIC CEMENT MATERIAL ONLYSH 62 · | $7,392 | $8,870 | TOUCHSTONE RESOURCES, LLC | +20.0% | 3 |
| Jan 13, 2021 | 6372-37-001MMC - 637237001 | Newton Beaumont |
HYDRAULIC CEMENT MATERIAL ONLYUS 190 · | $7,392 | $8,512 | TOUCHSTONE RESOURCES, LLC | +15.2% | 3 |
| Jan 13, 2021 | 6372-38-001MMC - 637238001 | Liberty Beaumont |
HYDRAULIC CEMENT MATERIAL ONLYUS 90 · | $5,280 | $6,336 | TOUCHSTONE RESOURCES, LLC | +20.0% | 3 |
| Jan 12, 2021 | 6364-82-001RMC - 636482001 | Ellis Dallas |
MISCELLANEOUS CONCRETE REPAIRUS 67 · | $245,623 | $235,573 | SJ&J CONSTRUCTION, LLC | -4.1% | 12 |
| Jan 12, 2021 | 6364-60-001RMC - 636460001 | Ellis Dallas |
CULVERT EXTENSION REPLACEMENT CROSSFM 1183 · | $237,540 | $200,250 | BECK-REIT & SONS, LTD. | -15.7% | 9 |
| Jan 12, 2021 | 6372-43-001RMC - 637243001 | Waller Houston |
PUMP STATION AND DRAIN SYSTEM CLEANINGUS 290 · | $200,889 | $196,675 | AIMS COMPANIES | -2.1% | 3 |
| Jan 12, 2021 | 6374-02-001RMC - 637402001 | Waller Houston |
GUARDRAIL REPAIRUS 290 · | $216,013 | $185,583 | ISI CONTRACTING, INC. | -14.1% | 3 |
| Jan 12, 2021 | 6374-91-001MMC - 637491001 | Smith Tyler |
FLEXBASE MATERIALS ONLYUS 69 · | $167,500 | $171,270 | DIGG COMMERCIAL, LLC | +2.3% | 3 |
| Jan 12, 2021 | 6371-92-001MMC - 637192001 | Gregg Tyler |
FLEXBASE MATERIALS ONLYUS 80 · | $115,200 | $119,394 | DIGG COMMERCIAL, LLC | +3.6% | 2 |
| Jan 12, 2021 | 6373-15-001RMC - 637315001 | Dallas Dallas |
TREE TRIMMING AND BRUSH REMOVALIH 30 · | $169,376 | $103,579 | PATHFIELD INVESTMENTS LLC | -38.8% | 13 |
| Jan 12, 2021 | 6364-78-001MMC - 636478001 | Jim Wells Corpus Christi |
P&D OF EMULS (HFRS-2)(DEL)US 281 · | $82,800 | $82,800 | ERGON ASPHALT & EMULSIONS, INC. | 0.0% | 1 |
| Jan 12, 2021 | 6374-87-001MMC - 637487001 | Nueces Corpus Christi |
P&D OF BRINE SOLUTION(DEL)IH 37 · | $56,816 | $61,400 | DIGG COMMERCIAL, LLC | +8.1% | 1 |
| Jan 12, 2021 | 6374-90-001MMC - 637490001 | Wood Tyler |
FLEXBASE MATERIALS ONLYUS 80 · | $52,900 | $54,890 | DIGG COMMERCIAL, LLC | +3.8% | 3 |
| Jan 12, 2021 | 6352-16-001RMC - 635216001 | Freestone Bryan |
CLEANING STORM SEWER SYSTEMSH 14 · | $55,396 | $54,010 | AIMS COMPANIES | -2.5% | 1 |
| Jan 12, 2021 | 6359-58-001MMC - 635958001 | Henderson Tyler |
FLEXBASE MATERIALS ONLYUS 175 · | $25,000 | $50,000 | DIGG COMMERCIAL, LLC | +100.0% | 2 |
| Jan 8, 2021 | 0005-14-084C 5-14-84 | Midland Odessa |
CONSTRUCT NEW INTERCHANGEIH 20 · | $61,937,172 | $59,101,874 | PULICE CONSTRUCTION, INC. | -4.6% | 4 |
| Jan 8, 2021 | 6372-51-001RMC - 637251001 | Bexar San Antonio |
ROUTINE MAINTENANCEIH 10 · | $18,869,631 | $14,188,793 | DBI SERVICES, LLC | -24.8% | 4 |
| Jan 8, 2021 | 2524-02-022BR 2018(103) | Brazoria Houston |
REPLACE BRIDGE AND APPROACHESFM 2611 · | $11,460,496 | $12,141,992 | COPASA INC | +5.9% | 9 |
| Jan 8, 2021 | 0123-03-022STP 2021(216) | Cherokee Tyler |
GR,STRS,PLANING,BS RPR,SBGR WDN,ACP SURF,MBGF,PVMKUS 84 · | $9,385,832 | $7,859,265 | MADDEN CONTRACTING COMPANY, LLC. | -16.3% | 8 |
| Jan 8, 2021 | 0150-04-048C 150-4-48 | Llano Austin |
CONSTRUCT NEW ROADWAY LANESSH 29 · | $5,808,874 | $5,448,732 | ACME BRIDGE COMPANY, INC. | -6.2% | 9 |
| Jan 8, 2021 | 6372-52-001RMC - 637252001 | Comal San Antonio |
ROUTINE MAINTENANCEIH 35 · | $7,733,990 | $5,393,594 | DBI SERVICES, LLC | -30.3% | 4 |
| Jan 8, 2021 | 0073-07-002BR 2021(296) | Live Oak Corpus Christi |
INSTALLATION OF CRASH WALLIH 37 · | $3,946,809 | $3,746,407 | LUCANIA CONSTRUCTION LLC | -5.1% | 6 |
| Jan 8, 2021 | 0915-00-231STP 2021(231) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTSVA · | $3,824,973 | $3,416,463 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | -10.7% | 7 |
| Jan 8, 2021 | 0052-01-044NH 2021(294) | Parmer Lubbock |
REHABILITATION OF EXISTING ROADWAYUS 70 · | $2,729,421 | $3,220,734 | GILVIN-TERRILL, LTD. | +18.0% | 4 |
| Jan 8, 2021 | 0211-02-028C 211-2-28 | Lee Austin |
FULL DEPTH REPAIR, LEVEL-UP & TOMUS 77 · | $3,823,036 | $2,887,593 | BIG CREEK CONSTRUCTION, LTD. | -24.5% | 7 |
| Jan 8, 2021 | 6367-16-001RMC - 636716001 | Wise Fort Worth |
FLEXIBLE PAVEMENT REPAIRUS 81 · | $2,341,099 | $1,985,755 | EUROVIA ATLANTIC COAST LLC | -15.2% | 9 |
| Jan 8, 2021 | 6368-87-001RMC - 636887001 | Burnet Austin |
REPAIR, REPLACE, AND UPGRADE MBGFUS 281 · | $3,010,875 | $1,965,115 | ELITE CASTLE RESOURCES LLC | -34.7% | 4 |
| Jan 8, 2021 | 6366-81-001RMC - 636681001 | Ector Odessa |
MILL AND INLAYIH 20 · | $2,745,987 | $1,923,614 | DAN WILLIAMS COMPANY | -29.9% | 4 |
| Jan 8, 2021 | 0013-05-062STP 2021(252) | Montague Wichita Falls |
PAVEMENT REPAIR AND OVERLAYUS 81 · | $2,127,704 | $1,628,158 | JAGOE-PUBLIC COMPANY | -23.5% | 6 |
| Jan 8, 2021 | 0265-07-051STP 2021(272) | Fayette Yoakum |
INSTALL MEDIAN BARRIERSH 71 · | $2,148,827 | $1,588,832 | D&S CONCRETE CONTRACTORS LLC | -26.1% | 10 |
| Jan 8, 2021 | 6350-86-001MMC - 635086001 | Travis Austin |
MATERIAL ONLY (SEAL COAT ASPHALT)IH 35 · | $1,740,081 | $1,352,104 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -22.3% | 2 |
| Jan 8, 2021 | 6370-91-001RMC - 637091001 | Val Verde Laredo |
MILL-INLAY & SPOT BASE REPAIRUS 90 · | $1,536,086 | $1,345,886 | ANDERSON COLUMBIA CO., INC. | -12.4% | 5 |
| Jan 8, 2021 | 6371-88-001RMC - 637188001 | Harris Houston |
PREV MNT OF SGNL EQUIPIH 610 · | $1,389,016 | $1,099,385 | LINDSEY ELECTRIC, L.P. | -20.9% | 5 |
| Jan 8, 2021 | 0920-00-132NH 2021(292) | Jefferson Beaumont |
HAZARD ELIMINATION & SAFETYVA · | $1,255,695 | $1,085,378 | TRAF-TEX, INC. | -13.6% | 4 |
| Jan 8, 2021 | 0830-03-013C 830-3-13 | Edwards San Angelo |
REPAIR ROADWAYRM 335 · | $1,129,369 | $999,998 | INTEGRITY SERVICES, LLC | -11.5% | 9 |
| Jan 8, 2021 | 6371-87-001RMC - 637187001 | Harris Houston |
MNT OF VIVDSIH 610 · | $1,207,452 | $996,832 | SOUTHWEST SIGNAL SUPPLY, INC. | -17.4% | 5 |
| Jan 8, 2021 | 0925-00-073C 925-00-73 | Childress Childress |
STRIPINGVA · | $1,220,829 | $977,518 | CENTERLINE TECHNOLOGIES, LLC | -19.9% | 7 |
| Jan 8, 2021 | 1685-05-126STP 2021(261)HES | Harris Houston |
IMPROVE TRAFFIC SIGNALSSH 6 · | $1,061,588 | $882,567 | CITYLYNX, INC. | -16.9% | 5 |
| Jan 8, 2021 | 6373-80-001RMC - 637380001 | Johnson Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 67 · | $1,026,150 | $879,002 | NORTHEASTERN PAVERS, LLC | -14.3% | 8 |
| Jan 8, 2021 | 6374-00-001RMC - 637400001 | Potter Amarillo |
INSTALLATION OF RAISED PAVEMENT MARKERSIH 40 · | $788,817 | $667,451 | BRYDL CONTRACTING, INC. | -15.4% | 4 |
| Jan 8, 2021 | 6371-22-001RMC - 637122001 | Grayson Paris |
INSTALL NEW TRAFFIC SIGNAL AND FLASHING BEACONFM 121 · | $657,133 | $652,334 | WG ENGINEERING & CONSTRUCTION, LLC | -0.7% | 4 |
| Jan 8, 2021 | 6374-47-001RMC - 637447001 | Midland Odessa |
ROADWAY SWEEPINGIH 20 · | $771,573 | $545,204 | J-MEN CONCRETE CONSTRUCTION | -29.3% | 3 |
| Jan 8, 2021 | 0916-00-231STP 2021(309) | Nueces Corpus Christi |
INSTALLATION OF PROFILE RUMBLE EDGE/CENTERLINEVA · | $698,972 | $498,691 | STRIPE-A-ZONE, INC. | -28.7% | 7 |
| Jan 8, 2021 | 6372-03-001RMC - 637203001 | Harris Houston |
LONG LINE STRIPING-REPL PVMT MRKGSSH 249 · | $749,524 | $481,181 | PMI PAVEMENT MARKING, LLC | -35.8% | 6 |
| Jan 8, 2021 | 0179-11-004STP 2021(260)HES | Brazoria Houston |
IMPROVE TRAFFIC SIGNALSSH 35 · | $482,848 | $458,468 | CITYLYNX, INC. | -5.0% | 4 |
| Jan 8, 2021 | 6350-87-001MMC - 635087001 | Travis Austin |
MATERIAL ONLY (SEAL COAT ASPHALT)US 183 · | $440,075 | $437,964 | ERGON ASPHALT & EMULSIONS, INC. | -0.5% | 1 |
| Jan 8, 2021 | 6368-28-001RMC - 636828001 | Harris Houston |
ASPHALT REPAIRIH 610 · | $452,600 | $418,300 | MAIN LANE INDUSTRIES LTD. | -7.6% | 4 |
| Jan 8, 2021 | 6359-91-001RMC - 635991001 | Erath Fort Worth |
CALL OUT REFLECTORIZED PAVEMENT MARKINGUS 377 · | $508,253 | $409,886 | TRP CONSTRUCTION GROUP, LLC | -19.4% | 4 |
| Jan 8, 2021 | 6371-20-001RMC - 637120001 | Childress Childress |
2021-2022 GUARDRAIL REPAIRUS 287 · | $375,448 | $339,775 | BARRICADES UNLIMITED | -9.5% | 3 |
| Jan 8, 2021 | 6366-12-001RMC - 636612001 | Travis Austin |
INSTALLATION OF COMMUNICATION EQUIPMENT AND ITSUS 183 · | $285,340 | $333,490 | THE LEVY COMPANY, INC. | +16.9% | 2 |
| Jan 8, 2021 | 6368-33-001RMC - 636833001 | Tarrant Fort Worth |
CALLOUT REFLECTORIZED PAVEMENT MARKINGSIH 35W · | $292,190 | $296,275 | STRIPE-A-ZONE, INC. | +1.4% | 4 |
| Jan 8, 2021 | 0073-09-040NH 2021(226) | Bexar San Antonio |
LANDSCAPE PLANTING AND IRRIGATIONIH 37 · | $328,444 | $292,836 | ENCINO LANDSCAPE, INC. | -10.8% | 6 |
| Jan 8, 2021 | 6368-41-001RMC - 636841001 | Tarrant Fort Worth |
CALLOUT REFLETORIZED PAV MRKS AND MRKRSIH 820 · | $315,388 | $282,470 | TRP CONSTRUCTION GROUP, LLC | -10.4% | 4 |
| Jan 8, 2021 | 6368-35-001RMC - 636835001 | Bosque Waco |
BRIDGE PREVENTATIVE MAINTENANCESH 22 · | $248,125 | $173,338 | BECK-REIT & SONS, LTD. | -30.1% | 10 |
| Jan 7, 2021 | 0646-05-027BR 2021(213) | Henderson Tyler |
RPLC BR&APP,C&G,RET WALLS,ACP B&SSH 198 · | $26,604,181 | $30,355,868 | COPASA INC | +14.1% | 8 |
| Jan 7, 2021 | 0463-04-024STP 2020(950) | Glasscock San Angelo |
CONSTRUCT OVERPASSSH 158 · | $28,510,932 | $26,934,935 | REECE ALBERT, INC. | -5.5% | 6 |
| Jan 7, 2021 | 0658-01-045STP 2021(227)MM | Bexar San Antonio |
CONSTRUCT 2 WAY LT TURN LN, BIKE LNS & SDWKSFM 1535 · | $13,370,908 | $15,523,367 | DAN WILLIAMS COMPANY | +16.1% | 6 |
| Jan 7, 2021 | 6372-50-001RMC - 637250001 | Bexar San Antonio |
ROUTINE MAINTENANCEIH 35 · | $18,283,425 | $14,977,836 | ROY JORGENSEN ASSOCIATES, INC. | -18.1% | 4 |
| Jan 7, 2021 | 1937-02-032BR 2021(297) | Zavala Laredo |
BRIDGE REPLACEMENTFM 393 · | $9,587,229 | $8,978,776 | HUNTER INDUSTRIES, LTD. | -6.3% | 4 |
| Jan 7, 2021 | 3403-01-001STP 2021(267) | Camp Atlanta |
CONSTRUCTION OF A NEW 2-LANE ROADWAYSL 255 · | $7,689,048 | $5,634,658 | R & G CONSTRUCTION, LLC | -26.7% | 9 |
| Jan 7, 2021 | 0090-06-044BR 2021(281) | Potter Amarillo |
REPLACE EXISTING BRIDGESBI 40-D · | $4,894,339 | $5,207,276 | INTEGRITY SERVICES, LLC | +6.4% | 7 |
| Jan 7, 2021 | 0231-03-152NH 2021(228) | Bell Waco |
ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTIONIH 14 · | $5,548,675 | $4,573,813 | MICA CORPORATION | -17.6% | 3 |
| Jan 7, 2021 | 1585-01-025STP 2021(308) | Tyler Beaumont |
SURFACING ROADWAY RESTORATIONFM 1746 · | $4,027,608 | $3,877,452 | A. L. HELMCAMP, INC. | -3.7% | 5 |
| Jan 7, 2021 | 1526-01-019BR 2021(258) | Scurry Abilene |
BRIDGE REPLACEMENTFM 1606 · | $2,904,242 | $2,902,279 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -0.1% | 7 |
| Jan 7, 2021 | 0062-05-062NH 2021(317) | Marion Atlanta |
RESURFACE EXISTING 4 LANE DIVIDED HIGHWAYUS 59 · | $4,561,816 | $2,827,414 | MADDEN CONTRACTING COMPANY, LLC. | -38.0% | 3 |
| Jan 7, 2021 | 0224-02-049NH 2021(251) | Clay Wichita Falls |
MILL AND OVERLAYUS 287 · | $3,412,649 | $2,554,473 | JAGOE-PUBLIC COMPANY | -25.1% | 5 |
| Jan 7, 2021 | 0910-00-114STP 2021(215) | Smith Tyler |
PREVENTIVE MAINTENANCEVA · | $2,585,271 | $2,322,961 | STRIPE-A-ZONE, INC. | -10.1% | 6 |
| Jan 7, 2021 | 0907-00-197STP 2021(214) | Tom Green San Angelo |
HIGHWAY IMPROVEMENTVA · | $2,375,579 | $2,137,530 | D. I. J. CONSTRUCTION, INC. | -10.0% | 9 |
| Jan 7, 2021 | 0918-47-279STP 2021(279) | Dallas Dallas |
ADA CURB RAMPS AND SIDE WALK IMPLEMENTATIONVA · | $2,231,145 | $2,125,612 | TI-ZACK CONCRETE, INC. | -4.7% | 10 |
| Jan 7, 2021 | 6367-08-001RMC - 636708001 | Harris Houston |
MAINTENANCE OF ILLUMINATIONIH 45 · | $2,084,825 | $1,752,250 | LINDSEY ELECTRIC, L.P. | -16.0% | 4 |
| Jan 7, 2021 | 1685-05-115C 1685-5-115 | Harris Houston |
SURFACING/ROADWAY RESTORATIONSH 6 · | $2,130,442 | $1,616,650 | ANGEL BROTHERS HOLDINGS CORP. | -24.1% | 5 |
| Jan 7, 2021 | 0313-07-020STP 2021(288) | Parker Fort Worth |
BRIDGE MAINTENANCEFM 51 · | $1,771,780 | $1,487,925 | TALBRAN ENTERPRISES LLC | -16.0% | 11 |
| Jan 7, 2021 | 6363-77-001RMC - 636377001 | Denton Dallas |
CLEANING AND SWEEPING HIGHWAYS AND DEBRIS REMOVALIH 35 · | $1,645,433 | $1,475,321 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -10.3% | 3 |
| Jan 7, 2021 | 0906-00-203C 906-00-203 | Ector Odessa |
BRIDGE JOINT REPAIR PROGRAM (2021)VA · | $1,830,439 | $1,267,114 | SCR CIVIL CONSTRUCTION, LLC | -30.8% | 12 |
| Jan 7, 2021 | 0573-01-040STP 2021(286) | Bastrop Austin |
REHABILITATE EXISTING ROADWAYSH 304 · | $1,213,097 | $1,022,333 | TEXAS MATERIALS GROUP, INC. | -15.7% | 7 |
| Jan 7, 2021 | 6369-37-001RMC - 636937001 | Wise Fort Worth |
THERMOPLASTIC STRIPING AND HANDWORKUS 380 · | $1,160,872 | $981,576 | D. I. J. CONSTRUCTION, INC. | -15.4% | 8 |
| Jan 7, 2021 | 6373-18-001RMC - 637318001 | Dallas Dallas |
VEGETATION MANAGEMENTIH 20 · | $701,528 | $915,815 | CEN-TEX IRRIGATION SYSTEMS, INC. | +30.5% | 2 |
| Jan 7, 2021 | 6373-17-001RMC - 637317001 | Dallas Dallas |
VEGETATION MANAGEMENTIH 35E · | $765,535 | $905,489 | JASCO | +18.3% | 2 |
| Jan 7, 2021 | 6372-80-001RMC - 637280001 | Hunt Paris |
SITE SPECIFIC TY I STRIPINGIH 30 · | $1,197,216 | $904,562 | CENTERLINE TECHNOLOGIES, LLC | -24.4% | 6 |
| Jan 7, 2021 | 6370-36-001RMC - 637036001 | Wise Fort Worth |
GUARDRAIL REPAIR & INSTALLATIONUS 380 · | $949,902 | $848,007 | MARCOM'S MOWING SERVICE, LLC | -10.7% | 8 |
| Jan 7, 2021 | 0028-07-058STP 2021(290)HES | Jefferson Beaumont |
INSTALL UPGRADE ROADWAY LIGHTINGUS 90 · | $804,208 | $753,374 | TRAF-TEX, INC. | -6.3% | 3 |
| Jan 7, 2021 | 0271-16-160NH 2021(163) | Harris Houston |
REHABILITATE BRIDGEIH 610 · | $850,626 | $645,779 | SCR CIVIL CONSTRUCTION, LLC | -24.1% | 10 |
| Jan 7, 2021 | 0642-01-021STP 2021(218)HES | Hunt Paris |
HAZARD ELIMINATION & SAFETYFM 36 · | $664,554 | $636,887 | TALBRAN ENTERPRISES LLC | -4.2% | 9 |
| Jan 7, 2021 | 6372-28-001MMC - 637228001 | Hardin Beaumont |
LIMESTONE ROCK ASPHALT MATERIAL ONLYFM 943 · | $630,060 | $635,809 | MARTIN MARIETTA MATERIALS, INC. | +0.9% | 2 |
| Jan 7, 2021 | 6373-16-001RMC - 637316001 | Dallas Dallas |
VEGETATION MANAGEMENTIH 20 · | $448,730 | $567,526 | CEN-TEX IRRIGATION SYSTEMS, INC. | +26.5% | 2 |
| Jan 7, 2021 | 6372-34-001MMC - 637234001 | Jasper Beaumont |
LIMESTONE ROCK ASPHALT MATERIAL ONLYUS 190 · | $529,206 | $549,132 | MARTIN MARIETTA MATERIALS, INC. | +3.8% | 2 |
| Jan 7, 2021 | 6350-34-001RMC - 635034001 | Victoria Yoakum |
THERMOPLASTIC PAVEMENT MARKINGS (ON CALL)US 59 · | $557,750 | $524,650 | PAVEMENT MARKINGS INC. | -5.9% | 9 |
| Jan 7, 2021 | 6374-06-001RMC - 637406001 | Wichita Wichita Falls |
LARGE SIGN REPLACEMENTIH 44 · | $511,425 | $483,286 | HJC FARMS, INC. | -5.5% | 9 |
| Jan 7, 2021 | 6373-58-001RMC - 637358001 | San Patricio Corpus Christi |
MOWING RIGHT OF WAYIH 37 · | $405,445 | $478,050 | R&M INCORPORATED | +17.9% | 1 |
1–100 of 111Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.