Bid Tab X-ray: 6510-38-001

Nov 3, 2026 · Coryell Sign up free
Set your company to personalize scores

GATESVILLE AO - FY27 BASE FAILURE REPAIR

6510-38-001 · let Nov 3, 2026 · Coryell, Waco · Routine Maintenance Project

$1,146,275Low bid: BIG CREEK CONSTRUCTION, LTD.-4.7% vs estimate $1,203,177
$160,415Left on the table14.0% gap to the second bid
4BiddersSpread 75% low to high
25Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1BIG CREEK CONSTRUCTION, LTD. $1,146,275-4.7% $160,415 0 0
2TEXAS MATERIALS GROUP, INC. $1,306,690+14.0%8.6% $51,489 1+$23,116 1-$6,754
3KNIFE RIVER CORPORATION - SOUTH $1,358,179+18.5%12.9% $647,471 4+$77,952 0
4LONE STAR PAVING COMPANY $2,005,650+75.0%66.7% 7+$757,183 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

BIG CREEK CONSTRUCTION, LTD. vs TEXAS MATERIALS GROUP, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
341-7022 D-GR HMA TY-C PG70-223,000 TON $130.00$152.00$114.77 $66,000
344-7019 SP MIXES SP-C PG70-221,000 TON $130.00$164.00$142.22 $34,000
500-7033 MOBILIZATION (EMERGENCY)3 EA $50.00$8,550.00$844.81 $25,500
341-7048 D-GR HMA TY-D PG70-221,600 TON $132.00$146.00$126.94 $22,400
351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")3,100 SY $45.00$51.00$35.01 $18,600
351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")1,800 SY $85.00$93.00$60.19 $14,400
505-7001 TMA (STATIONARY)60 DAY $250.00$105.00$217.57 -$8,700
3006-7001 UNDERSEAL COURSE3,600 GAL $5.00$4.00$3.65 -$3,600
672-7004 REFL PAV MRKR TY II-A-A2,400 EA $4.50$5.50$3.97 $2,400
341-7082 TACK COAT1,000 GAL $5.00$2.90$3.93 -$2,100
505-7002 TMA (MOBILE OPERATION)60 HR $45.00$20.00$64.00 -$1,500
666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL)2,000 LF $1.85$1.10$0.5533 -$1,500
666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL)2,000 LF $1.85$1.10$0.5714 -$1,500
666-7302 TY I HIGH PERF PM (Y)6"(BRK)(100MIL)2,000 LF $1.80$1.25$0.5735 -$1,100
666-7290 TY I HIGH PERF PM (W)6"(BRK)(100MIL)2,000 LF $1.75$1.25$0.5652 -$1,000
7010-7002 MAINTENANCE SPEED LIMIT SIGNING21 DAY $50.00$10.00$117.34 -$840
668-7091 PREFAB PM TY C (W)(ARROW)18 EA $265.00$300.00$201.69 $630
668-7103 PREFAB PM TY C (W)(WORD)18 EA $335.00$300.00$249.54 -$630
662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W300 EA $2.00$1.00$1.03 -$300
662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2300 EA $2.00$1.00$0.5715 -$300

Positive: the low bidder was cheaper on that item. These 20 items account for $160,860 of the $160,415 gap.

TEXAS MATERIALS GROUP, INC.: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
500-7033 MOBILIZATION (EMERGENCY)3 EA $8,550.00$844.8110.12x$23,116
505-7001 TMA (STATIONARY)60 DAY $105.00$217.570.48x-$6,754

KNIFE RIVER CORPORATION - SOUTH: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
354-7051 PLANE ASPH CONC PAV(2")15,000 SY $4.00$1.862.15x$32,145
505-7001 TMA (STATIONARY)60 DAY $547.85$217.572.52x$19,817
3006-7001 UNDERSEAL COURSE3,600 GAL $7.70$3.652.11x$14,595
500-7002 MOBILIZATION (CALLOUT)6 EA $2,500.00$600.854.16x$11,395

LONE STAR PAVING COMPANY: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
341-7022 D-GR HMA TY-C PG70-223,000 TON $210.00$114.771.83x$285,702
351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")1,800 SY $152.00$60.192.53x$165,256
351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")3,100 SY $87.00$35.012.48x$161,154
500-7002 MOBILIZATION (CALLOUT)6 EA $9,500.00$600.8515.81x$53,395
354-7051 PLANE ASPH CONC PAV(2")15,000 SY $5.00$1.862.69x$47,145
500-7033 MOBILIZATION (EMERGENCY)3 EA $12,000.00$844.8114.20x$33,466
341-7082 TACK COAT1,000 GAL $15.00$3.933.81x$11,065