| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$21,000.00 |
$12,700.00 |
$14,250.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,689 | CY |
$10.00 |
$18.90 |
$13.70 |
$10.70 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 975 | CY |
$11.50 |
$23.27 |
$18.66 |
$14.03 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$10,500.00 |
$8,968.53 |
$10,050.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,702 | LF |
$3.50 |
$2.36 |
$2.78 |
$2.48 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 140 | LF |
$15.00 |
$19.89 |
$23.44 |
$20.90 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 7,014 | SY |
$4.00 |
$2.61 |
$3.08 |
$3.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 2.32 | AC |
$1,350.00 |
$892.50 |
$1,051.41 |
$200.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 438 | CY |
$64.00 |
$74.08 |
$71.06 |
$87.00 |
| 100 | 325 0100 |
SEPARATOR FABRIC | 3,104 | SY |
$3.00 |
$2.71 |
$1.70 |
$4.18 |
| 110 | 407(B)7300 |
TACK COAT | 175 | GAL |
$4.00 |
$3.15 |
$5.55 |
$3.30 |
| 120 | 408 8100 |
PRIME COAT | 1,713 | GAL |
$4.00 |
$5.25 |
$6.52 |
$5.50 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 556 | TON |
$110.00 |
$110.77 |
$117.33 |
$123.00 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 263 | TON |
$120.00 |
$135.45 |
$133.91 |
$148.50 |
| 150 | 509(D)0500 |
CLASS C CONCRETE | 19 | CY |
$500.00 |
$714.22 |
$608.76 |
$510.00 |
| 160 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 182 | TON |
$55.00 |
$57.92 |
$54.51 |
$64.50 |
| 170 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 92 | TON |
$50.00 |
$46.45 |
$43.00 |
$46.00 |
| 180 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$10,500.00 |
$6,973.26 |
$7,000.00 |
| 190 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,637 | LF |
$10.00 |
$11.55 |
$13.61 |
$12.65 |
| 200 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$15.00 |
$42.00 |
$39.53 |
$17.13 |
| 210 | 501(G)1800 |
CLSM BACKFILL | 56 | CY |
$275.00 |
$283.84 |
$217.99 |
$245.00 |
| 220 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 239 | LF |
$300.00 |
$332.88 |
$373.45 |
$338.00 |
| 230 | 504(A)5200 |
APPROACH SLAB | 115 | SY |
$5.00 |
$267.56 |
$307.77 |
$328.00 |
| 240 | 504(B)5300 |
SAW-CUT GROOVING | 285.6 | SY |
$7.00 |
$12.81 |
$13.85 |
$12.32 |
| 250 | 504(D)5410 |
CONCRETE RAIL (TR3) | 216.6 | LF |
$125.00 |
$84.53 |
$110.69 |
$117.00 |
| 260 | 506(A)7200 |
STRUCTURAL STEEL | 540 | LB |
$5.00 |
$4.35 |
$4.40 |
$5.92 |
| 270 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,500.00 |
$1,088.33 |
$403.29 |
$620.00 |
| 280 | 509(A)0200 |
CLASS AA CONCRETE | 82 | CY |
$850.00 |
$1,041.76 |
$1,118.88 |
$1,055.00 |
| 290 | 509(B)0320 |
CLASS A CONCRETE | 39.2 | CY |
$800.00 |
$1,041.76 |
$1,413.30 |
$1,195.00 |
| 300 | 511(A)2210 |
REINFORCING STEEL | 20,720 | LB |
$1.50 |
$1.33 |
$1.38 |
$1.42 |
| 310 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 252 | LF |
$60.00 |
$61.49 |
$54.28 |
$72.00 |
| 320 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 252 | LF |
$20.00 |
$21.00 |
$35.90 |
$18.00 |
| 330 | 514(K)6200 |
(PL)PILOT HOLES | 168 | LF |
$300.00 |
$238.19 |
$225.55 |
$287.50 |
| 340 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 350 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 3,534 | TON |
$55.00 |
$57.92 |
$50.41 |
$62.50 |
| 360 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 331 | TON |
$50.00 |
$46.45 |
$38.88 |
$43.50 |
| 370 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$40.00 |
$49.03 |
$41.34 |
$53.00 |
| 380 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 66 | LF |
$38.00 |
$49.03 |
$41.33 |
$52.50 |
| 390 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$3,935.40 |
$15,776.56 |
$16,000.00 |
| 400 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,500.00 |
$1,993.95 |
$2,597.59 |
$2,310.00 |
| 410 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$900.00 |
$3,752.70 |
$4,205.63 |
$3,740.00 |
| 420 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 3,560 | LF |
$1.50 |
$1.78 |
$1.24 |
$1.10 |
| 430 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,900 | SD |
$1.00 |
$0.6300 |
$1.24 |
$1.10 |
| 440 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 900 | SD |
$1.50 |
$0.0500 |
$0.3100 |
$0.2400 |
| 450 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$1.75 |
$0.4700 |
$0.3100 |
$0.2400 |
| 460 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,800 | SD |
$1.00 |
$0.4200 |
$1.24 |
$1.40 |
| 470 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$8,190.00 |
$14,503.36 |
$11,500.00 |
| 480 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$3,150.00 |
$3,092.37 |
$3,250.00 |
| 490 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$66,500.00 |
$67,495.74 |
$77,900.00 |
$78,000.00 |