| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$7,000.00 |
$16,400.00 |
$34,000.00 |
$16,591.48 |
$20,000.00 |
$22,153.32 |
$50,000.00 |
$50,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 3,245 | CY |
$10.00 |
$12.00 |
$8.48 |
$13.50 |
$12.76 |
$10.00 |
$10.58 |
$13.20 |
$30.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,036 | CY |
$12.00 |
$7.00 |
$11.00 |
$18.00 |
$16.21 |
$20.00 |
$12.80 |
$18.20 |
$15.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$6,000.00 |
$8,100.00 |
$14,000.00 |
$10,417.24 |
$12,000.00 |
$11,866.85 |
$25,000.00 |
$5,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 504 | LF |
$4.50 |
$4.25 |
$4.23 |
$4.90 |
$4.73 |
$5.00 |
$4.04 |
$4.25 |
$5.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 196 | LF |
$18.00 |
$22.00 |
$21.67 |
$22.00 |
$24.27 |
$10.00 |
$20.74 |
$21.70 |
$21.00 |
| 70 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 85 | CY |
$175.00 |
$220.00 |
$191.00 |
$122.12 |
$99.92 |
$250.00 |
$100.87 |
$457.50 |
$95.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 8,434 | SY |
$5.00 |
$5.72 |
$5.44 |
$5.96 |
$6.07 |
$6.00 |
$5.19 |
$5.45 |
$6.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 5.52 | AC |
$1,500.00 |
$2,745.00 |
$500.00 |
$2,600.00 |
$3,066.14 |
$875.00 |
$2,619.75 |
$2,745.00 |
$2,600.00 |
| 100 | 307(K)4200 |
STABILIZED SUBGRADE | 2,720 | SY |
$7.00 |
$10.00 |
$16.15 |
$16.80 |
$8.08 |
$15.00 |
$10.50 |
$18.60 |
$15.00 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 500 | TON |
$40.00 |
$43.00 |
$11.65 |
$48.20 |
$60.35 |
$65.00 |
$39.63 |
$60.50 |
$40.00 |
| 120 | 408 8100 |
PRIME COAT | 1,415 | GAL |
$7.00 |
$8.95 |
$4.00 |
$6.00 |
$6.46 |
$6.18 |
$5.25 |
$5.00 |
$6.00 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 801 | TON |
$175.00 |
$153.50 |
$165.00 |
$155.45 |
$139.18 |
$180.00 |
$147.00 |
$146.50 |
$210.00 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 473 | TON |
$200.00 |
$151.50 |
$165.00 |
$168.00 |
$157.81 |
$210.00 |
$178.50 |
$156.50 |
$235.00 |
| 150 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$350.00 |
$345.00 |
$300.00 |
$464.04 |
$400.00 |
$1,047.07 |
$1,458.00 |
$600.00 |
| 160 | 613(EE)5969 |
18" CORRUGATED POLYPROPYLENE PIPE | 80 | LF |
$60.00 |
$50.00 |
$68.00 |
$63.50 |
$178.28 |
$63.00 |
$51.78 |
$66.00 |
$80.00 |
| 170 | 613(EE)5981 |
36" CORRUGATED POLYPROPYLENE PIPE | 64 | LF |
$110.00 |
$140.00 |
$112.00 |
$132.00 |
$197.67 |
$166.00 |
$109.69 |
$132.00 |
$180.00 |
| 180 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$700.00 |
$1,000.00 |
$1,520.00 |
$850.00 |
$450.90 |
$5,800.00 |
$729.35 |
$1,650.00 |
$2,500.00 |
| 190 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,750.00 |
$2,000.00 |
$2,900.00 |
$1,814.00 |
$450.90 |
$7,800.00 |
$866.33 |
$3,300.00 |
$5,000.00 |
| 200 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$6,250.00 |
$12,000.00 |
$3,468.37 |
$12,500.00 |
$8,447.46 |
$18,500.00 |
$15,000.00 |
| 210 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,879 | SY |
$10.00 |
$10.00 |
$4.85 |
$12.00 |
$7.76 |
$13.50 |
$9.03 |
$16.60 |
$18.00 |
| 220 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 412.5 | LF |
$35.00 |
$28.00 |
$24.20 |
$26.00 |
$27.04 |
$27.50 |
$23.10 |
$24.20 |
$34.00 |
| 230 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$3,000.00 |
$2,240.00 |
$2,238.50 |
$2,535.00 |
$2,500.84 |
$2,500.00 |
$2,136.75 |
$2,239.00 |
$2,600.00 |
| 240 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$3,500.00 |
$2,420.00 |
$2,420.00 |
$3,200.00 |
$2,703.61 |
$2,720.00 |
$2,310.00 |
$2,420.00 |
$3,200.00 |
| 250 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,214 | LF |
$9.00 |
$11.55 |
$11.55 |
$14.50 |
$13.52 |
$15.00 |
$11.03 |
$11.60 |
$18.00 |
| 260 | 624(H)3900 |
(PL) GATE | 3 | EA |
$3,000.00 |
$1,100.00 |
$1,100.00 |
$1,200.00 |
$2,150.60 |
$3,000.00 |
$1,050.00 |
$1,100.00 |
$1,800.00 |
| 270 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$25.00 |
$15.00 |
$32.00 |
$17.91 |
$20.00 |
$148.68 |
$34.60 |
$30.00 |
| 280 | 501(G)1800 |
CLSM BACKFILL | 70 | CY |
$250.00 |
$220.00 |
$260.00 |
$328.42 |
$270.98 |
$255.00 |
$308.69 |
$239.00 |
$300.00 |
| 290 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 284 | LF |
$350.00 |
$330.00 |
$325.00 |
$352.29 |
$379.70 |
$432.00 |
$299.04 |
$345.50 |
$400.00 |
| 300 | 504(B)5300 |
SAW-CUT GROOVING | 233.5 | SY |
$12.00 |
$9.00 |
$9.02 |
$9.80 |
$10.08 |
$10.14 |
$8.61 |
$9.00 |
$28.00 |
| 310 | 504(D)5410 |
CONCRETE RAIL (TR3) | 254.6 | LF |
$100.00 |
$100.00 |
$112.00 |
$110.00 |
$118.34 |
$155.00 |
$79.96 |
$195.50 |
$200.00 |
| 320 | 506(A)7200 |
STRUCTURAL STEEL | 100 | LB |
$5.00 |
$4.00 |
$3.70 |
$12.00 |
$3.05 |
$5.00 |
$49.56 |
$11.20 |
$7.00 |
| 330 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,300.00 |
$500.00 |
$500.00 |
$1,453.00 |
$432.25 |
$950.00 |
$1,027.91 |
$952.00 |
$500.00 |
| 340 | 509(A)0210 |
CLASS AA CONCRETE | 97.4 | CY |
$900.00 |
$900.00 |
$940.00 |
$1,001.00 |
$1,289.43 |
$1,200.00 |
$1,125.17 |
$1,168.00 |
$1,000.00 |
| 350 | 509(B)0320 |
CLASS A CONCRETE | 41.8 | CY |
$900.00 |
$1,000.00 |
$1,010.00 |
$1,100.00 |
$1,130.61 |
$1,000.00 |
$1,613.18 |
$1,473.00 |
$1,000.00 |
| 360 | 511(A)2210 |
REINFORCING STEEL | 24,480 | LB |
$1.50 |
$1.15 |
$1.27 |
$1.31 |
$1.64 |
$1.78 |
$3.40 |
$1.95 |
$1.50 |
| 370 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 882 | LF |
$45.00 |
$40.00 |
$41.60 |
$37.70 |
$38.29 |
$55.00 |
$58.85 |
$45.80 |
$45.00 |
| 380 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 882 | LF |
$20.00 |
$15.00 |
$10.40 |
$20.00 |
$33.21 |
$20.00 |
$13.98 |
$34.00 |
$40.00 |
| 390 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 400 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,570 | TON |
$65.00 |
$63.00 |
$61.20 |
$61.00 |
$81.16 |
$65.00 |
$61.03 |
$78.10 |
$60.00 |
| 410 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 410 | TON |
$45.00 |
$47.00 |
$44.70 |
$55.00 |
$56.81 |
$58.00 |
$140.89 |
$49.50 |
$45.00 |
| 420 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$40.00 |
$40.00 |
$42.50 |
$35.00 |
$35.73 |
$25.00 |
$109.87 |
$85.10 |
$25.00 |
| 430 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$40.00 |
$40.00 |
$42.50 |
$30.00 |
$40.15 |
$25.00 |
$75.20 |
$38.50 |
$25.00 |
| 440 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$18,100.00 |
$45,000.00 |
$39,172.23 |
$30,000.00 |
$147,024.96 |
$45,000.00 |
$30,000.00 |
| 450 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,380 | SD |
$0.5000 |
$0.0300 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.2000 |
$0.0200 |
$0.0200 |
$0.3500 |
| 460 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,794 | SD |
$1.00 |
$0.0300 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.2000 |
$0.0200 |
$0.0200 |
$0.7000 |
| 470 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 828 | SD |
$1.50 |
$0.0300 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.2000 |
$0.0200 |
$0.0200 |
$2.00 |
| 480 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,104 | SD |
$1.50 |
$3.30 |
$6.00 |
$3.50 |
$3.69 |
$3.50 |
$3.15 |
$3.30 |
$5.00 |
| 490 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,898 | SD |
$1.00 |
$0.2200 |
$0.2200 |
$0.2800 |
$0.2500 |
$0.2500 |
$0.2100 |
$0.2200 |
$1.25 |
| 500 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$7,600.00 |
$8,000.00 |
$9,500.00 |
$8,479.51 |
$7,800.00 |
$7,245.00 |
$25,000.00 |
$9,500.00 |
| 510 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$2,750.00 |
$3,500.00 |
$3,072.29 |
$3,900.00 |
$2,625.00 |
$3,500.00 |
$3,500.00 |
| 520 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$79,700.00 |
$55,000.00 |
$71,100.00 |
$68,000.00 |
$81,711.38 |
$98,000.00 |
$96,192.75 |
$97,260.10 |
$75,000.00 |