| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$25,300.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 750 | CY |
$16.00 |
$16.00 |
$13.80 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 2,500 | CY |
$14.00 |
$16.00 |
$16.10 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$20,000.00 |
$5,750.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 7,581 | LF |
$2.50 |
$2.83 |
$2.30 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 238 | LF |
$13.60 |
$29.50 |
$21.28 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 10,877 | SY |
$3.60 |
$2.95 |
$2.86 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 2.25 | AC |
$1,375.00 |
$100.00 |
$230.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 750 | CY |
$62.00 |
$62.25 |
$65.55 |
| 100 | 310(B)5300 |
SUBGRADE, METHOD B | 2,160 | SY |
$3.20 |
$3.85 |
$4.60 |
| 110 | 325 0100 |
SEPARATOR FABRIC | 2,200 | SY |
$2.40 |
$3.00 |
$3.16 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,110 | TON |
$33.10 |
$36.00 |
$43.70 |
| 130 | 407(B)7300 |
TACK COAT | 1,900 | GAL |
$3.50 |
$5.25 |
$4.03 |
| 140 | 408 8100 |
PRIME COAT | 1,775 | GAL |
$5.25 |
$1.00 |
$9.20 |
| 150 | 409(A)9200 |
FABRIC REINFORCEMENT | 9,865 | SY |
$3.00 |
$4.75 |
$4.60 |
| 160 | 409(B)9300 |
BITUMINOUS BINDER | 1,973 | GAL |
$4.80 |
$5.85 |
$6.73 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 400 | TON |
$113.00 |
$130.50 |
$227.13 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,950 | TON |
$99.00 |
$130.20 |
$188.60 |
| 190 | 412 3100 |
COLD MILLING PAVEMENT | 2,525 | SY |
$8.00 |
$8.25 |
$12.92 |
| 200 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 21 | CY |
$28.50 |
$35.00 |
$43.01 |
| 210 | 509(A)0200 |
CLASS AA CONCRETE | 57.5 | CY |
$610.00 |
$635.20 |
$730.66 |
| 220 | 509(D)0500 |
CLASS C CONCRETE | 20 | CY |
$393.50 |
$600.00 |
$543.95 |
| 230 | 510(A)1200 |
RETAINING WALL | 142 | SY |
$690.00 |
$726.60 |
$885.50 |
| 240 | 511(A)2200 |
REINFORCING STEEL | 4,775 | LB |
$1.40 |
$1.85 |
$1.73 |
| 250 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 29 | TON |
$64.20 |
$60.00 |
$86.25 |
| 260 | 609(B)4320 |
1'-8" COMB.CRB.& GUT.(4" MNTBLE) | 90 | LF |
$35.60 |
$36.00 |
$57.50 |
| 270 | 613(A)5216 |
24" R.C.PIPE CLASS III | 150 | LF |
$80.50 |
$129.30 |
$109.25 |
| 280 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 368 | LF |
$37.75 |
$57.10 |
$51.75 |
| 290 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,041.00 |
$1,350.00 |
$2,070.00 |
| 300 | 613(P)7400 |
18" GALV. STEEL CULVERT END SEC. RND. | 18 | EA |
$310.00 |
$420.00 |
$345.00 |
| 310 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$40,000.00 |
$18,000.00 |
$17,250.00 |
| 320 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 928 | LF |
$6.25 |
$14.88 |
$14.26 |
| 330 | 624(D)3500 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,113.00 |
$1,800.00 |
$1,725.00 |
| 340 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 3 | EA |
$216.50 |
$150.00 |
$345.00 |
| 350 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 210 | CY |
$19.00 |
$25.00 |
$57.50 |
| 360 | 501(G)1800 |
CLSM BACKFILL | 92 | CY |
$218.00 |
$197.00 |
$301.53 |
| 370 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 358.67 | LF |
$227.50 |
$405.75 |
$401.25 |
| 380 | 504(A)5200 |
APPROACH SLAB | 142.22 | SY |
$259.25 |
$281.50 |
$284.40 |
| 390 | 504(B)5300 |
SAW-CUT GROOVING | 405.02 | SY |
$7.75 |
$5.75 |
$9.89 |
| 400 | 504(D)5410 |
CONCRETE RAIL (TR3) | 241.2 | LF |
$88.00 |
$96.50 |
$102.96 |
| 410 | 506(A)7200 |
STRUCTURAL STEEL | 630 | LB |
$4.25 |
$5.75 |
$3.58 |
| 420 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,260.00 |
$1,586.00 |
$1,426.17 |
| 430 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 4 | EA |
$1,470.50 |
$1,706.00 |
$1,426.17 |
| 440 | 509(A)0210 |
CLASS AA CONCRETE | 87.8 | CY |
$842.75 |
$720.00 |
$1,017.12 |
| 450 | 509(B)0320 |
CLASS A CONCRETE | 83.86 | CY |
$816.50 |
$710.00 |
$1,017.12 |
| 460 | 511(A)2210 |
REINFORCING STEEL | 30,915 | LB |
$1.20 |
$1.85 |
$1.88 |
| 470 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 80 | LF |
$38.75 |
$60.00 |
$60.72 |
| 480 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 224 | LF |
$44.25 |
$70.00 |
$74.35 |
| 490 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 80 | LF |
$16.50 |
$45.00 |
$23.00 |
| 500 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 224 | LF |
$16.75 |
$40.00 |
$23.00 |
| 510 | 514(K)6200 |
(PL)PILOT HOLES | 144 | LF |
$215.00 |
$270.00 |
$345.33 |
| 520 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 530 | 518(B)0300 |
SEALED EXPANSION JOINTS | 35.17 | LF |
$311.00 |
$398.00 |
$382.29 |
| 540 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 520 | TON |
$50.50 |
$45.00 |
$68.41 |
| 550 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 111 | TON |
$40.20 |
$42.00 |
$53.22 |
| 560 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$31.50 |
$18.00 |
$46.00 |
| 570 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$27.50 |
$15.00 |
$46.00 |
| 580 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$38,000.00 |
$55,223.00 |
| 590 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 20 | DAY |
$650.00 |
$650.00 |
$650.00 |
| 600 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 5 | EA |
$1,670.10 |
$3,300.00 |
$3,162.50 |
| 610 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 5 | EA |
$2,665.10 |
$3,960.00 |
$3,795.00 |
| 620 | 623(J)2100 |
CURVED APPROACH GUARDRAIL | 1 | EA |
$1,816.75 |
$905.00 |
$862.50 |
| 630 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,500.00 |
$450.00 |
$460.00 |
| 640 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 75.04 | SF |
$25.15 |
$59.00 |
$57.50 |
| 650 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 110 | LF |
$10.25 |
$24.00 |
$23.00 |
| 660 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 18,000 | LF |
$0.7500 |
$0.7000 |
$0.6900 |
| 670 | 856(B)8300 |
TRAF.STR.(MULTI-POLY.)(SYM,WRD,ETC) | 4 | EA |
$425.10 |
$1,040.00 |
$1,092.50 |
| 680 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,960 | SD |
$0.3000 |
$1.75 |
$1.73 |
| 690 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,320 | SD |
$0.5000 |
$1.20 |
$1.15 |
| 700 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$0.7500 |
$3.00 |
$2.88 |
| 710 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,500 | SD |
$0.3000 |
$0.3000 |
$0.2900 |
| 720 | 880(F)6700 |
DRUMS | 9,000 | SD |
$0.2000 |
$0.1800 |
$0.1700 |
| 730 | 880(G)6800 |
TUBE CHANNELIZERS | 9,000 | SD |
$0.3000 |
$0.1800 |
$0.1700 |
| 740 | 880(I)7000 |
FLAGGER | 360 | SD |
$32.85 |
$20.00 |
$34.50 |
| 750 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$27,000.00 |
$36,032.95 |
| 760 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$2,875.00 |
| 770 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$155,000.00 |
$225,566.62 |