| 10 | 202(H)2900 |
EARTHWORK | 1 | LSUM |
$15,000.00 |
$35,000.00 |
$12,000.00 |
$37,380.00 |
$35,500.00 |
$25,000.00 |
$54,809.00 |
| 20 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,920 | LF |
$4.00 |
$2.25 |
$3.15 |
$3.03 |
$3.89 |
$4.00 |
$3.08 |
| 30 | 221(E)2600 |
TEMPORARY SILT DIKE | 84 | LF |
$23.00 |
$17.00 |
$17.50 |
$16.64 |
$18.50 |
$30.00 |
$16.88 |
| 40 | 230(A)7200 |
SOLID SLAB SODDING | 3,600 | SY |
$10.00 |
$4.25 |
$3.70 |
$3.56 |
$4.72 |
$7.50 |
$3.61 |
| 50 | 303(A)1200 |
AGGREGATE BASE TYPE A | 240 | CY |
$80.00 |
$112.00 |
$105.00 |
$180.82 |
$148.52 |
$75.00 |
$105.00 |
| 60 | 310(B)5300 |
SUBGRADE, METHOD B | 1,661 | SY |
$10.00 |
$3.53 |
$9.00 |
$4.20 |
$14.00 |
$15.00 |
$12.50 |
| 70 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 40 | TON |
$80.00 |
$60.50 |
$55.00 |
$88.40 |
$65.00 |
$60.00 |
$90.00 |
| 80 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 267 | TON |
$200.00 |
$143.00 |
$150.00 |
$136.50 |
$232.20 |
$200.00 |
$230.00 |
| 90 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 845 | TON |
$220.00 |
$159.50 |
$162.00 |
$152.25 |
$245.12 |
$200.00 |
$210.00 |
| 100 | 412 3100 |
COLD MILLING PAVEMENT | 4,410 | SY |
$10.00 |
$6.99 |
$9.35 |
$8.93 |
$12.25 |
$5.00 |
$10.00 |
| 110 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 563 | LF |
$6.00 |
$4.25 |
$7.00 |
$8.14 |
$8.00 |
$10.00 |
$10.00 |
| 120 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 164 | LF |
$50.00 |
$10.75 |
$45.00 |
$12.81 |
$25.00 |
$12.45 |
$35.00 |
| 130 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,250 | LF |
$30.00 |
$25.30 |
$25.00 |
$24.15 |
$8.85 |
$30.00 |
$25.00 |
| 140 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,500.00 |
$3,630.00 |
$3,600.00 |
$3,465.00 |
$4,850.00 |
$3,600.00 |
$3,600.00 |
| 150 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,000.00 |
$3,300.00 |
$3,300.00 |
$3,150.00 |
$4,500.00 |
$3,600.00 |
$3,200.00 |
| 160 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 32 | EA |
$30.00 |
$14.00 |
$15.00 |
$14.70 |
$18.00 |
$25.00 |
$15.00 |
| 170 | 501(G)1800 |
CLSM BACKFILL | 140 | CY |
$300.00 |
$246.00 |
$235.00 |
$310.32 |
$311.91 |
$300.00 |
$350.00 |
| 180 | 502(B)3310 |
FALSEWORK AND JACKING | 1 | LSUM |
$50,000.00 |
$53,000.00 |
$40,000.00 |
$29,043.76 |
$65,000.00 |
$100,000.00 |
$70,000.00 |
| 190 | 504(A)5200 |
APPROACH SLAB | 214.44 | SY |
$300.00 |
$319.00 |
$300.00 |
$419.86 |
$359.07 |
$285.00 |
$500.00 |
| 200 | 504(B)5300 |
SAW-CUT GROOVING | 1,708.89 | SY |
$10.00 |
$5.00 |
$5.35 |
$5.09 |
$5.30 |
$8.00 |
$5.20 |
| 210 | 504(D)5420 |
CONCRETE RAIL (TR4) | 1,037.33 | LF |
$120.00 |
$108.00 |
$135.00 |
$129.45 |
$120.00 |
$150.00 |
$200.00 |
| 220 | 506(A)7200 |
STRUCTURAL STEEL | 15,600 | LB |
$10.00 |
$6.30 |
$12.00 |
$7.73 |
$9.61 |
$8.00 |
$12.00 |
| 230 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$2,500.00 |
$4,000.00 |
$3,500.00 |
$4,762.21 |
$4,552.00 |
$5,000.00 |
$4,000.00 |
| 240 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 25 | EA |
$2,500.00 |
$3,100.00 |
$2,600.00 |
$3,691.53 |
$3,250.00 |
$3,500.00 |
$4,000.00 |
| 250 | 509 0120 |
ELASTOMERIC COATING | 1,283 | SF |
$20.00 |
$22.00 |
$25.00 |
$22.83 |
$29.51 |
$25.00 |
$23.00 |
| 260 | 509(A)0210 |
CLASS AA CONCRETE | 392.3 | CY |
$1,200.00 |
$965.00 |
$1,300.00 |
$1,241.76 |
$848.67 |
$750.00 |
$2,200.00 |
| 270 | 509(D)0510 |
CLASS C CONCRETE | 40 | CY |
$600.00 |
$565.00 |
$700.00 |
$1,027.39 |
$495.00 |
$600.00 |
$2,700.00 |
| 280 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 104,420 | LB |
$1.75 |
$1.68 |
$2.00 |
$1.99 |
$1.53 |
$1.60 |
$3.00 |
| 290 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$60,000.00 |
$80,000.00 |
$100,000.00 |
$75,783.75 |
$116,610.00 |
$550,000.00 |
$75,000.00 |
| 300 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$10,000.00 |
$1,100.00 |
$25,000.00 |
$10,626.00 |
$12,500.00 |
$25,000.00 |
$10,650.00 |
| 310 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 839.22 | SY |
$7.00 |
$5.00 |
$7.00 |
$4.83 |
$5.60 |
$6.00 |
$5.00 |
| 320 | 518(B)0300 |
SEALED EXPANSION JOINTS | 64.92 | LF |
$400.00 |
$345.00 |
$320.00 |
$451.86 |
$343.31 |
$450.00 |
$350.00 |
| 330 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$50.00 |
$48.00 |
$50.00 |
$46.20 |
$46.00 |
$46.00 |
$48.00 |
| 340 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$200.00 |
$121.00 |
$165.00 |
$115.50 |
$280.00 |
$150.00 |
$118.00 |
| 350 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 110 | SY |
$900.00 |
$993.50 |
$1,150.00 |
$939.75 |
$1,346.00 |
$1,000.00 |
$960.00 |
| 360 | 523(A)3200 |
SEALER CRACK PREPARATION | 184.5 | LF |
$10.00 |
$5.00 |
$12.00 |
$5.25 |
$6.75 |
$6.00 |
$5.50 |
| 370 | 523(B)3300 |
SEALER RESIN | 3 | GAL |
$200.00 |
$240.00 |
$200.00 |
$252.00 |
$175.00 |
$150.00 |
$260.00 |
| 380 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 50 | TON |
$70.00 |
$86.00 |
$72.00 |
$126.15 |
$120.00 |
$90.00 |
$50.00 |
| 390 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 20 | TON |
$60.00 |
$74.50 |
$75.00 |
$139.76 |
$115.00 |
$65.00 |
$50.00 |
| 400 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$270,000.00 |
$100,000.00 |
$209,927.56 |
$167,500.00 |
$40,000.00 |
$638,505.24 |
| 410 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 12 | SF |
$50.00 |
$143.00 |
$135.00 |
$136.50 |
$145.00 |
$200.00 |
$140.00 |
| 420 | 855(A)7200 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,621 | LF |
$2.50 |
$1.82 |
$1.80 |
$1.73 |
$1.80 |
$3.00 |
$1.80 |
| 430 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,616 | SD |
$1.00 |
$0.1000 |
$0.2500 |
$0.2100 |
$0.2400 |
$0.2000 |
$0.2500 |
| 440 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,560 | SD |
$1.50 |
$0.1000 |
$0.2500 |
$0.2100 |
$0.2400 |
$0.2000 |
$0.2500 |
| 450 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 312 | SD |
$2.00 |
$20.00 |
$15.00 |
$14.70 |
$15.40 |
$14.00 |
$15.00 |
| 460 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 624 | SD |
$2.00 |
$20.00 |
$15.00 |
$14.70 |
$15.00 |
$14.00 |
$15.00 |
| 470 | 880(C)6420 |
WING BARRICADES | 1,248 | SD |
$1.50 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.0400 |
$0.0200 |
$0.0200 |
| 480 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,248 | SD |
$2.00 |
$0.6000 |
$0.6500 |
$0.6300 |
$0.6800 |
$0.6000 |
$0.7000 |
| 490 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,046 | SD |
$15.00 |
$12.00 |
$15.00 |
$10.50 |
$11.00 |
$10.00 |
$11.00 |
| 500 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$8,800.00 |
$8,500.00 |
$8,085.00 |
$16,700.00 |
$10,000.00 |
$57,000.00 |
| 510 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$135,000.00 |
$130,000.00 |
$120,000.00 |
$139,552.29 |
$187,000.00 |
$275,000.00 |
$209,000.00 |