| 1 | 407(B) 0250 |
TACK COAT | 2,700 | GAL |
$4.00 |
$1.00 |
$1.48 |
| 2 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 5,900 | TON |
$83.00 |
$60.00 |
$64.43 |
| 3 | 412 5267 |
COLD MILLING PAVEMENT | 35,100 | SY |
$2.50 |
$1.75 |
$2.19 |
| 4 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 44,100 | LF |
$0.5000 |
$0.6700 |
$0.5100 |
| 5 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 800 | LF |
$3.00 |
$2.33 |
$2.10 |
| 6 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 920 | LF |
$10.00 |
$1.00 |
$2.65 |
| 7 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 52 | LF |
$20.00 |
$20.00 |
$24.00 |
| 8 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 12 | EA |
$310.00 |
$100.00 |
$220.00 |
| 9 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 60 | SD |
$16.00 |
$0.5500 |
$1.00 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$13,500.00 |
$11,000.00 |
| 11 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$20,000.00 |
$20,000.00 |