| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$200,000.00 |
$220,090.50 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.00 |
$1.87 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,500 | LF |
$9.00 |
$7.73 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 19,235 | SY |
$2.50 |
$1.51 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.97 | AC |
$750.00 |
$436.18 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,622 | CY |
$75.00 |
$74.97 |
| 7 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 5,235 | LF |
$8.50 |
$3.73 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 620 | TON |
$40.00 |
$36.72 |
| 9 | 407(B) 0250 |
TACK COAT | 4,043 | GAL |
$5.00 |
$5.03 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,020 | TON |
$100.00 |
$118.06 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,170 | TON |
$100.00 |
$100.39 |
| 12 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 208 | LF |
$45.00 |
$43.35 |
| 13 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$1,200.00 |
$1,428.00 |
| 14 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 56.08 | SF |
$25.00 |
$33.72 |
| 15 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 120 | LF |
$25.00 |
$7.87 |
| 16 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$14,130.94 |
| 17 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$24,990.00 |
| 18 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$6,282.18 |
| 19 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$83,284.35 |