| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$28,000.00 |
| 2 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 13,728 | LF |
$7.00 |
$3.75 |
| 3 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 25,080 | TON |
$22.00 |
$31.65 |
| 4 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 9,150 | GAL |
$3.00 |
$3.55 |
| 5 | 408 5774 |
PRIME COAT | 3,930 | GAL |
$4.80 |
$5.30 |
| 6 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,090 | TON |
$75.00 |
$97.30 |
| 7 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 13,810 | TON |
$74.00 |
$102.65 |
| 8 | 509(A) 0319 |
CLASS AA CONCRETE | 21.8 | CY |
$370.00 |
$952.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 16 | CY |
$337.00 |
$1,345.00 |
| 10 | 511(A) 0332 |
REINFORCING STEEL | 4,690.7 | LB |
$1.25 |
$1.70 |
| 11 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 300 | TON |
$39.00 |
$61.60 |
| 12 | 613(C) 5221 |
35" X 24" PRECOATED CORR. STL. PIPE ARCH | 168 | LF |
$75.00 |
$196.00 |
| 13 | 613(C) 5285 |
57" X 38" PRECOATED CORR. STL. PIPE ARCH | 24 | LF |
$85.00 |
$241.00 |
| 14 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$20.00 |
$19.60 |
| 15 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,000.00 |
$2,464.00 |
| 16 | 509(A) 1326 |
CLASS AA CONCRETE | 38.7 | CY |
$700.00 |
$952.00 |
| 17 | 511(A) 1332 |
REINFORCING STEEL | 6,672 | LB |
$1.00 |
$1.25 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 51.8 | CY |
$700.00 |
$952.00 |
| 19 | 511(A) 1332 |
REINFORCING STEEL | 8,899.5 | LB |
$1.00 |
$1.25 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 51.8 | CY |
$700.00 |
$952.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 8,899.5 | LB |
$1.00 |
$1.25 |
| 22 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$3,920.00 |
| 23 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 256.72 | SF |
$15.00 |
$20.20 |
| 24 | 851(C) 8324 |
2" SQUARE TUBE POST | 337.58 | LF |
$8.00 |
$9.00 |
| 25 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 168,960 | LF |
$0.0800 |
$0.1600 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$11,760.00 |
| 27 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$5,600.00 |
| 28 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$118,000.00 |