| 1 | 407(B) 0250 |
TACK COAT | 6,500 | GAL |
$4.00 |
$1.27 |
| 2 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 12,000 | TON |
$75.00 |
$76.35 |
| 3 | 412 5267 |
COLD MILLING PAVEMENT | 85,400 | SY |
$2.00 |
$1.61 |
| 4 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 17,461 | LF |
$0.2000 |
$0.2800 |
| 5 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 34,922 | LF |
$0.2000 |
$0.2600 |
| 6 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 72,634 | LF |
$0.5000 |
$0.4300 |
| 7 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 600 | LF |
$1.25 |
$0.6000 |
| 8 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,050 | LF |
$2.00 |
$2.50 |
| 9 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 80 | LF |
$3.25 |
$20.00 |
| 10 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$200.00 |
$110.00 |
| 11 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$30,000.00 |
$7,500.00 |
| 12 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$59,000.00 |