| 1 | 407(B) 0250 |
TACK COAT | 4,350 | GAL |
$5.00 |
$1.34 |
$1.25 |
| 2 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 6,800 | TON |
$85.00 |
$76.33 |
$71.00 |
| 3 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,400 | TON |
$83.00 |
$72.19 |
$74.45 |
| 4 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 500 | TON |
$180.00 |
$149.31 |
$158.00 |
| 5 | 412 5267 |
COLD MILLING PAVEMENT | 40,100 | SY |
$2.00 |
$1.81 |
$1.71 |
| 6 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 12,140 | LF |
$0.5000 |
$0.3000 |
$0.6000 |
| 7 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 49,700 | LF |
$0.6000 |
$0.3000 |
$0.9000 |
| 8 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,820 | LF |
$0.9000 |
$3.00 |
$1.20 |
| 9 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 12 | EA |
$125.00 |
$310.00 |
$250.00 |
| 10 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 6 | EA |
$125.00 |
$345.00 |
$250.00 |
| 11 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 75 | SD |
$16.00 |
$3.00 |
$30.00 |
| 12 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$14,000.00 |
$32,700.00 |
| 13 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$10,000.00 |
$42,500.00 |
$30,000.00 |