| 1 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 223 | CY |
$25.00 |
$63.47 |
$60.00 |
| 2 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,746 | TON |
$22.00 |
$18.55 |
$20.00 |
| 3 | 407(B) 0250 |
TACK COAT | 11,432 | GAL |
$2.75 |
$2.58 |
$3.00 |
| 4 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 21,369 | TON |
$70.00 |
$81.93 |
$85.00 |
| 5 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 504 | TON |
$150.00 |
$171.96 |
$75.00 |
| 6 | 412 5267 |
COLD MILLING PAVEMENT | 146,814 | SY |
$2.00 |
$0.8100 |
$2.00 |
| 7 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 2 | EAGP |
$700.00 |
$807.00 |
$2,200.00 |
| 8 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 73,198 | LF |
$0.1000 |
$0.1900 |
$0.2000 |
| 9 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 6,064 | LF |
$3.00 |
$2.57 |
$3.00 |
| 10 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 6,000 | LF |
$19.00 |
$14.67 |
$19.00 |
| 11 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,200.00 |
$2,418.93 |
$2,400.00 |
| 12 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$1,400.00 |
$1,904.26 |
$1,800.00 |
| 13 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 271 | EA |
$10.00 |
$10.29 |
$13.00 |
| 14 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 125,700 | LF |
$0.3200 |
$0.3600 |
$0.4000 |
| 15 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 189 | LF |
$6.00 |
$8.15 |
$8.50 |
| 16 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$33,424.27 |
$35,000.00 |
| 17 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$50,454.65 |
$237,001.90 |
| 18 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 112 | CY |
$50.00 |
$63.41 |
$60.00 |
| 19 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,847 | TON |
$22.00 |
$18.36 |
$20.00 |
| 20 | 407(B) 0250 |
TACK COAT | 9,039 | GAL |
$3.00 |
$2.58 |
$3.00 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 16,127 | TON |
$70.00 |
$82.98 |
$85.00 |
| 22 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 336 | TON |
$150.00 |
$170.74 |
$75.00 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 112,899 | SY |
$3.00 |
$0.8300 |
$2.00 |
| 24 | 828(A) 8142 |
VEHICLE LOOP DETECTOR | 3 | EA |
$250.00 |
$1,528.40 |
$1,650.00 |
| 25 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 134,300 | LF |
$0.3500 |
$0.3600 |
$0.4000 |
| 26 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 180 | LF |
$3.00 |
$5.09 |
$5.40 |
| 27 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 336 | LF |
$10.80 |
$8.15 |
$8.50 |
| 28 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 4 | EA |
$150.00 |
$254.73 |
$300.00 |
| 29 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 7 | EA |
$90.00 |
$254.73 |
$300.00 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$24,316.41 |
$35,000.00 |