| 1 | 410(A) 6530 |
(SP)HOT-IN-PLACE RECYCLED ASPHALT CONCRETE | 65,814 | SY |
$6.00 |
$4.50 |
$4.25 |
$5.20 |
$4.50 |
| 2 | 410(B) 6540 |
(SP)HOT-IN PLACE ASPHALT EMULSION | 145 | TON |
$750.00 |
$800.00 |
$760.61 |
$835.00 |
$800.00 |
| 3 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 25,540 | TON |
$77.00 |
$85.00 |
$88.55 |
$88.50 |
$93.45 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 15,483 | SY |
$5.50 |
$1.40 |
$1.30 |
$2.25 |
$1.95 |
| 5 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 101,288 | LF |
$0.1000 |
$0.1300 |
$0.1300 |
$0.1200 |
$0.0600 |
| 6 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 121,700 | LF |
$0.6500 |
$0.3300 |
$0.3100 |
$0.3400 |
$0.3300 |
| 7 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 800 | LF |
$2.50 |
$1.05 |
$3.00 |
$1.10 |
$1.05 |
| 8 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 24 | EA |
$275.00 |
$190.00 |
$75.00 |
$200.00 |
$190.00 |
| 9 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 513 | LF |
$1.10 |
$0.2700 |
$1.00 |
$0.2800 |
$0.2600 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$6,000.00 |
$7,000.00 |
$6,741.28 |
$14,500.00 |
$6,500.00 |