| 1 | 202(B) 0105 |
MUCK EXCAVATION | 1,200 | CY |
$8.00 |
$1.00 |
$3.00 |
$14.62 |
$5.00 |
$31.75 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 280 | LF |
$3.00 |
$0.1500 |
$1.00 |
$4.50 |
$1.00 |
$2.10 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 400 | SY |
$3.00 |
$1.00 |
$1.00 |
$9.00 |
$3.00 |
$4.55 |
| 4 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,150 | TON |
$35.00 |
$7.00 |
$23.00 |
$20.90 |
$24.00 |
$31.50 |
| 5 | 409(A) 4242 |
FABRIC REINFORCEMENT | 34,000 | SY |
$1.50 |
$1.00 |
$0.9000 |
$0.9500 |
$0.6500 |
$0.8800 |
| 6 | 409(B) 4268 |
BITUMINOUS BINDER | 6,657 | GAL |
$2.50 |
$2.00 |
$3.25 |
$3.60 |
$2.00 |
$3.30 |
| 7 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,850 | TON |
$75.00 |
$75.00 |
$81.00 |
$87.00 |
$87.40 |
$77.35 |
| 8 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 2,550 | TON |
$85.00 |
$80.00 |
$92.00 |
$75.00 |
$84.00 |
$95.15 |
| 9 | 412 5267 |
COLD MILLING PAVEMENT | 34,000 | SY |
$3.00 |
$0.8000 |
$1.25 |
$0.9000 |
$1.00 |
$1.22 |
| 10 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 57 | LF |
$20.00 |
$28.00 |
$20.00 |
$29.50 |
$20.00 |
$60.70 |
| 11 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 198 | LF |
$20.00 |
$28.00 |
$20.00 |
$25.50 |
$20.00 |
$37.55 |
| 12 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 71 | SY |
$55.00 |
$125.00 |
$250.00 |
$98.00 |
$55.00 |
$133.00 |
| 13 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 100 | SF |
$50.00 |
$15.00 |
$20.00 |
$34.00 |
$25.00 |
$14.40 |
| 14 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 2 | EA |
$500.00 |
$1,500.00 |
$250.00 |
$900.00 |
$500.00 |
$785.00 |
| 15 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 2 | EA |
$400.00 |
$1,500.00 |
$250.00 |
$950.00 |
$350.00 |
$645.00 |
| 16 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 400 | LF |
$10.00 |
$1.50 |
$4.00 |
$10.00 |
$6.00 |
$20.80 |
| 17 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 200 | LF |
$20.00 |
$1.50 |
$4.00 |
$10.00 |
$6.00 |
$20.80 |
| 18 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 177 | CY |
$30.00 |
$1.00 |
$42.00 |
$34.00 |
$30.00 |
$15.60 |
| 19 | 613(V) 1180 |
TRENCH EXCAVATION | 88 | CY |
$20.00 |
$1.00 |
$25.00 |
$17.00 |
$10.00 |
$41.60 |
| 20 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 280 | LF |
$4.00 |
$10.00 |
$10.00 |
$9.00 |
$10.00 |
$10.15 |
| 21 | 619(C) 0924 |
SAWING PAVEMENT | 1,069 | LF |
$2.50 |
$6.00 |
$1.00 |
$1.40 |
$4.00 |
$4.55 |
| 22 | 806(B) 8896 |
12' MTG.HT.TS PED.POLE(G.STL.) | 8 | EA |
$700.00 |
$1,100.00 |
$1,040.00 |
$1,860.00 |
$1,144.00 |
$1,080.00 |
| 23 | 828(B) 8136 |
LOOP DETECTOR WIRE | 2,613 | LF |
$5.00 |
$1.30 |
$2.55 |
$4.30 |
$1.50 |
$1.30 |
| 24 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 8 | EA |
$800.00 |
$1,400.00 |
$1,297.00 |
$1,022.00 |
$1,425.00 |
$1,350.00 |
| 25 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 8 | EA |
$500.00 |
$650.00 |
$638.00 |
$533.00 |
$702.00 |
$665.00 |
| 26 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,421 | LF |
$0.7500 |
$1.15 |
$1.00 |
$1.15 |
$1.10 |
$1.15 |
| 27 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 96 | LF |
$1.50 |
$3.15 |
$1.75 |
$2.00 |
$1.93 |
$3.10 |
| 28 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 540 | LF |
$4.00 |
$3.20 |
$5.50 |
$6.25 |
$6.00 |
$3.15 |
| 29 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 13 | EA |
$125.00 |
$27.00 |
$100.00 |
$113.00 |
$110.00 |
$26.00 |
| 30 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 55 | EA |
$130.00 |
$32.00 |
$10.00 |
$11.30 |
$11.00 |
$31.20 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$3,600.00 |
$7,500.00 |
$6,000.00 |
$605.00 |
$7,910.00 |
| 32 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$8,000.00 |
$100.00 |
$100.00 |
$6,500.00 |
$2,500.00 |
$2,600.00 |
| 33 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$18,000.00 |
$10,000.00 |
$25,000.00 |
$64,100.00 |
$58,985.00 |