| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$12.00 |
$6.00 |
$15.00 |
$20.00 |
| 2 | 230(A) 2806 |
SOLID SLAB SODDING | 125 | SY |
$10.00 |
$7.00 |
$2.40 |
$7.00 |
| 3 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 109 | CY |
$55.00 |
$55.00 |
$65.00 |
$80.00 |
| 4 | 307(K) 4300 |
STABILIZED SUBGRADE | 649 | SY |
$10.00 |
$13.00 |
$15.00 |
$35.00 |
| 5 | 317 4270 |
CEMENT TREATED BASE | 543 | SY |
$20.00 |
$20.00 |
$25.00 |
$25.00 |
| 6 | 408 5774 |
PRIME COAT | 212 | GAL |
$8.00 |
$15.00 |
$10.00 |
$10.00 |
| 7 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 543 | SY |
$30.00 |
$25.00 |
$40.00 |
$65.00 |
| 8 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 143.1 | CY |
$150.00 |
$200.00 |
$160.00 |
$160.00 |
| 9 | 609(A) 0287 |
CONCRETE CURB (4" MNTBLE-INTEGRAL) | 240 | LF |
$12.00 |
$25.00 |
$15.00 |
$20.00 |
| 10 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 240 | LF |
$15.00 |
$25.00 |
$20.00 |
$25.00 |
| 11 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 543 | SY |
$10.00 |
$75.00 |
$15.00 |
$30.00 |
| 12 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 640 | LF |
$5.00 |
$2.00 |
$2.05 |
$4.00 |
| 13 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 450 | LF |
$25.00 |
$20.00 |
$15.00 |
$17.00 |
| 14 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$1,400.00 |
$1,200.00 |
$1,800.00 |
| 15 | 504(A) 1304 |
APPROACH SLAB | 162.3 | SY |
$230.00 |
$225.00 |
$240.00 |
$200.00 |
| 16 | 504(B) 1305 |
SAW-CUT GROOVING | 350 | SY |
$5.00 |
$4.50 |
$4.05 |
$10.00 |
| 17 | 504(C) 6250 |
SEALED EXPANSION JOINT | 63.59 | LF |
$270.00 |
$350.00 |
$350.00 |
$250.00 |
| 18 | 504(E) 6190 |
42" F-SHAPED PARAPET | 404.5 | LF |
$85.00 |
$100.00 |
$125.00 |
$130.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 81.9 | CY |
$700.00 |
$950.00 |
$900.00 |
$990.00 |
| 20 | 509(D) 1331 |
CLASS C CONCRETE | 15 | CY |
$500.00 |
$1,000.00 |
$700.00 |
$700.00 |
| 21 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 28,680 | LB |
$1.10 |
$1.30 |
$1.25 |
$2.00 |
| 22 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$35,000.00 |
$25,000.00 |
$20,000.00 |
$15,000.00 |
| 23 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$3,500.00 |
$1,000.00 |
$2,000.00 |
$2,000.00 |
| 24 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 264.4 | SY |
$4.50 |
$4.00 |
$4.00 |
$6.00 |
| 25 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$30.00 |
$40.00 |
$40.00 |
| 26 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$75.00 |
$80.00 |
$50.00 |
$50.00 |
| 27 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$350.00 |
$625.00 |
$1,142.00 |
$350.00 |
| 28 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$40,000.00 |
$100,000.00 |
$120,000.00 |
| 29 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 900 | LF |
$1.00 |
$2.00 |
$5.50 |
$2.00 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$5,000.00 |
$5,115.00 |
$16,000.00 |
| 31 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 150 | HOUR |
$75.00 |
$60.00 |
$80.00 |
$65.00 |
| 32 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 90 | SD |
$25.00 |
$10.00 |
$5.00 |
$10.00 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$3,000.00 |
$10,000.00 |
$5,000.00 |
| 34 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$42,500.00 |
$47,380.00 |
$60,000.00 |
$55,000.00 |