| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,312 | CY |
$10.00 |
$12.50 |
$17.01 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$1.50 |
$1.50 |
$2.03 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,526 | LF |
$8.00 |
$4.00 |
$7.11 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 16,530.47 | SY |
$1.75 |
$1.44 |
$1.57 |
| 5 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 406 | TON |
$45.00 |
$50.00 |
$47.68 |
| 6 | 407(B) 0250 |
TACK COAT | 4,013 | GAL |
$2.50 |
$2.30 |
$3.12 |
| 7 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 9,849 | TON |
$80.00 |
$80.00 |
$89.10 |
| 8 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 400 | TON |
$80.00 |
$82.00 |
$97.65 |
| 9 | 613(A) 0497 |
54" R.C.PIPE CLASS III | 72 | LF |
$135.00 |
$135.00 |
$268.98 |
| 10 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 86 | LF |
$135.00 |
$160.00 |
$289.98 |
| 11 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$2,500.00 |
$2,200.00 |
$3,019.63 |
| 12 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$2,500.00 |
$2,892.75 |
| 13 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 54,763 | LF |
$0.7500 |
$0.4300 |
$0.5600 |
| 14 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$2,050.00 |
$8,120.00 |
| 15 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,416 | CY |
$10.00 |
$12.50 |
$17.01 |
| 16 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$1.50 |
$1.50 |
$3.05 |
| 17 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$8.00 |
$4.00 |
$10.15 |
| 18 | 230(A) 2806 |
SOLID SLAB SODDING | 21,729.26 | SY |
$1.75 |
$1.44 |
$1.57 |
| 19 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 408 | TON |
$45.00 |
$50.00 |
$66.20 |
| 20 | 407(B) 0250 |
TACK COAT | 5,213 | GAL |
$2.50 |
$2.30 |
$3.09 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12,486 | TON |
$80.00 |
$76.40 |
$89.65 |
| 22 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 500 | TON |
$80.00 |
$82.00 |
$94.55 |
| 23 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 115.14 | SF |
$12.00 |
$31.00 |
$20.30 |
| 24 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 72,685 | LF |
$0.7500 |
$0.3300 |
$0.5600 |
| 25 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$1,800.00 |
$8,120.00 |
| 26 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$5,582.50 |
| 27 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$135,000.00 |
$75,500.00 |
| 28 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$11,000.00 |
$16,500.00 |
$11,500.00 |