| 1 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 337.5 | LF |
$20.00 |
$14.12 |
$15.27 |
$15.50 |
$15.00 |
$17.28 |
| 2 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$1,245.00 |
$2,220.00 |
$2,300.00 |
$2,100.00 |
$2,514.00 |
| 3 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$1,880.00 |
$1,375.00 |
$1,425.00 |
$1,400.00 |
$1,554.00 |
| 4 | 501(G) 6309 |
CLSM BACKFILL | 38 | CY |
$190.00 |
$210.00 |
$165.00 |
$120.00 |
$375.00 |
$284.28 |
| 5 | 504(A) 1304 |
APPROACH SLAB | 136.4 | SY |
$210.00 |
$211.00 |
$198.00 |
$220.00 |
$225.00 |
$232.32 |
| 6 | 504(B) 1305 |
SAW-CUT GROOVING | 640 | SY |
$4.00 |
$4.50 |
$4.50 |
$4.00 |
$5.00 |
$5.40 |
| 7 | 504(C) 6250 |
SEALED EXPANSION JOINT | 63.34 | LF |
$250.00 |
$293.00 |
$260.00 |
$275.00 |
$350.00 |
$461.34 |
| 8 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 402.3 | LF |
$90.00 |
$90.00 |
$69.00 |
$70.00 |
$85.00 |
$77.75 |
| 9 | 506(A) 1322 |
STRUCTURAL STEEL | 6,660 | LB |
$6.00 |
$4.00 |
$8.60 |
$9.00 |
$6.50 |
$9.60 |
| 10 | 509(A) 1326 |
CLASS AA CONCRETE | 126.5 | CY |
$700.00 |
$661.00 |
$715.00 |
$650.00 |
$650.00 |
$934.83 |
| 11 | 509(D) 1331 |
CLASS C CONCRETE | 8 | CY |
$500.00 |
$404.00 |
$545.00 |
$400.00 |
$850.00 |
$622.35 |
| 12 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 26,780 | LB |
$1.25 |
$1.00 |
$0.9500 |
$1.10 |
$1.10 |
$1.60 |
| 13 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$67,000.00 |
$62,400.00 |
$62,000.00 |
$25,000.00 |
$68,011.20 |
| 14 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,080.00 |
$3,000.00 |
$7,000.00 |
$3,360.00 |
| 15 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 328 | SY |
$5.00 |
$4.00 |
$4.00 |
$4.00 |
$4.50 |
$4.80 |
| 16 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 150 | LF |
$50.00 |
$25.00 |
$25.00 |
$30.00 |
$50.00 |
$30.00 |
| 17 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 15 | GAL |
$100.00 |
$50.00 |
$50.00 |
$55.00 |
$100.00 |
$60.00 |
| 18 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 100 | SY |
$500.00 |
$277.00 |
$252.00 |
$250.00 |
$450.00 |
$276.00 |
| 19 | 523(A) 6550 |
SEALER CRACK PREPARATION | 30.67 | LF |
$5.00 |
$4.00 |
$4.00 |
$5.00 |
$4.50 |
$4.80 |
| 20 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$300.00 |
$100.00 |
$100.00 |
$400.00 |
$100.00 |
$120.00 |
| 21 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 10 | EA |
$1,200.00 |
$1,200.00 |
$880.00 |
$900.00 |
$1,000.00 |
$960.00 |
| 22 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$20,499.00 |
$45,000.00 |
$50,000.00 |
$60,000.00 |
$120,000.00 |
| 23 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$3,100.00 |
$3,410.00 |
$3,400.00 |
$4,000.00 |
$3,720.00 |
| 24 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$30.00 |
$25.00 |
$25.00 |
$27.00 |
$25.00 |
$30.00 |
| 25 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,000.00 |
$6,750.00 |
$8,100.00 |
$8,000.00 |
$8,000.00 |
$8,640.00 |
| 26 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$102,000.00 |
$66,400.00 |
$50,000.00 |
$80,000.00 |
$82,000.00 |
$78,399.49 |
| 27 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 850 | LF |
$20.00 |
$13.56 |
$15.27 |
$15.50 |
$15.00 |
$17.28 |
| 28 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$1,245.00 |
$2,220.00 |
$2,300.00 |
$2,100.00 |
$2,514.00 |
| 29 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,800.00 |
$1,880.00 |
$1,375.00 |
$1,425.00 |
$1,400.00 |
$1,554.00 |
| 30 | 501(G) 6309 |
CLSM BACKFILL | 39 | CY |
$200.00 |
$210.00 |
$165.00 |
$120.00 |
$375.00 |
$284.28 |
| 31 | 504(A) 1304 |
APPROACH SLAB | 136.4 | SY |
$210.00 |
$211.00 |
$198.00 |
$220.00 |
$225.00 |
$232.32 |
| 32 | 504(B) 1305 |
SAW-CUT GROOVING | 513 | SY |
$4.00 |
$4.50 |
$4.50 |
$4.00 |
$5.00 |
$5.40 |
| 33 | 504(C) 6250 |
SEALED EXPANSION JOINT | 63.34 | LF |
$250.00 |
$293.00 |
$260.00 |
$275.00 |
$350.00 |
$461.34 |
| 34 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 322.4 | LF |
$85.00 |
$90.00 |
$69.00 |
$70.00 |
$85.00 |
$77.75 |
| 35 | 506(A) 1322 |
STRUCTURAL STEEL | 4,690 | LB |
$5.00 |
$4.00 |
$8.60 |
$9.00 |
$6.50 |
$9.60 |
| 36 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 1 | EA |
$3,000.00 |
$1,800.00 |
$1,650.00 |
$1,650.00 |
$2,500.00 |
$1,800.00 |
| 37 | 509(A) 1326 |
CLASS AA CONCRETE | 95.7 | CY |
$750.00 |
$661.00 |
$730.00 |
$650.00 |
$650.00 |
$934.83 |
| 38 | 509(D) 1331 |
CLASS C CONCRETE | 8 | CY |
$550.00 |
$404.00 |
$575.00 |
$400.00 |
$850.00 |
$658.94 |
| 39 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 20,180 | LB |
$1.10 |
$1.00 |
$0.9800 |
$1.10 |
$1.10 |
$1.91 |
| 40 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$47,800.00 |
$45,500.00 |
$45,000.00 |
$25,000.00 |
$49,291.20 |
| 41 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$2,625.00 |
$2,600.00 |
$7,000.00 |
$2,863.20 |
| 42 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 258 | SY |
$5.00 |
$4.00 |
$4.00 |
$4.00 |
$4.50 |
$4.80 |
| 43 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$60.00 |
$25.00 |
$25.00 |
$30.00 |
$50.00 |
$30.00 |
| 44 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 5 | GAL |
$150.00 |
$50.00 |
$50.00 |
$55.00 |
$100.00 |
$60.00 |
| 45 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$600.00 |
$353.00 |
$330.00 |
$330.00 |
$450.00 |
$360.00 |
| 46 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$15,980.00 |
$35,750.00 |
$50,000.00 |
$60,000.00 |
$120,000.00 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$3,100.00 |
$3,410.00 |
$3,400.00 |
$4,000.00 |
$3,720.00 |
| 48 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$20.00 |
$25.00 |
$25.00 |
$27.00 |
$25.00 |
$30.00 |
| 49 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 675 | LF |
$20.00 |
$13.75 |
$15.27 |
$15.50 |
$15.00 |
$17.28 |
| 50 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 1 | EA |
$2,200.00 |
$325.00 |
$1,431.00 |
$1,425.00 |
$1,400.00 |
$1,620.00 |
| 51 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 1 | EA |
$2,200.00 |
$2,175.00 |
$1,325.00 |
$1,400.00 |
$1,300.00 |
$1,500.00 |
| 52 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,200.00 |
$1,892.00 |
$2,220.00 |
$2,300.00 |
$2,100.00 |
$2,514.00 |
| 53 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 3 | EA |
$1,900.00 |
$1,255.00 |
$1,375.00 |
$1,500.00 |
$1,300.00 |
$1,554.00 |
| 54 | 501(G) 6309 |
CLSM BACKFILL | 39 | CY |
$200.00 |
$210.00 |
$165.00 |
$120.00 |
$375.00 |
$284.28 |
| 55 | 504(A) 1304 |
APPROACH SLAB | 117.5 | SY |
$210.00 |
$212.00 |
$198.00 |
$220.00 |
$225.00 |
$231.09 |
| 56 | 504(B) 1305 |
SAW-CUT GROOVING | 496 | SY |
$4.00 |
$4.50 |
$4.50 |
$4.00 |
$5.00 |
$5.40 |
| 57 | 504(C) 6250 |
SEALED EXPANSION JOINT | 63.34 | LF |
$250.00 |
$293.00 |
$260.00 |
$275.00 |
$375.00 |
$461.34 |
| 58 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 297.4 | LF |
$85.00 |
$90.00 |
$72.00 |
$70.00 |
$85.00 |
$77.75 |
| 59 | 506(A) 1322 |
STRUCTURAL STEEL | 4,520 | LB |
$5.00 |
$4.00 |
$8.60 |
$9.00 |
$6.50 |
$9.60 |
| 60 | 509(A) 1326 |
CLASS AA CONCRETE | 95.7 | CY |
$750.00 |
$661.00 |
$730.00 |
$650.00 |
$650.00 |
$934.83 |
| 61 | 509(D) 1331 |
CLASS C CONCRETE | 6 | CY |
$550.00 |
$404.00 |
$600.00 |
$400.00 |
$850.00 |
$652.17 |
| 62 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 20,180 | LB |
$1.10 |
$1.00 |
$0.9800 |
$1.10 |
$1.10 |
$1.91 |
| 63 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$46,100.00 |
$43,500.00 |
$50,000.00 |
$25,000.00 |
$47,505.60 |
| 64 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$2,400.00 |
$2,275.00 |
$7,000.00 |
$2,478.00 |
| 65 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 245.3 | SY |
$5.00 |
$4.00 |
$4.00 |
$4.00 |
$4.50 |
$4.80 |
| 66 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$60.00 |
$25.00 |
$25.00 |
$30.00 |
$50.00 |
$30.00 |
| 67 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$50.00 |
$50.00 |
$55.00 |
$100.00 |
$60.00 |
| 68 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$600.00 |
$353.00 |
$330.00 |
$330.00 |
$450.00 |
$360.00 |
| 69 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$15,980.00 |
$35,750.00 |
$50,000.00 |
$60,000.00 |
$120,000.00 |
| 70 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$3,100.00 |
$3,410.00 |
$3,400.00 |
$4,000.00 |
$3,720.00 |
| 71 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$25.00 |
$25.00 |
$25.00 |
$27.00 |
$25.00 |
$30.00 |