| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$55,000.00 |
$38,310.00 |
$25,000.00 |
$85,455.97 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,600 | LF |
$2.20 |
$2.20 |
$2.00 |
$3.70 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 120 | LF |
$7.00 |
$5.00 |
$6.00 |
$15.84 |
| 4 | 409(A) 4242 |
FABRIC REINFORCEMENT | 69,423 | SY |
$0.7000 |
$1.00 |
$1.25 |
$0.9500 |
| 5 | 409(B) 4268 |
BITUMINOUS BINDER | 17,356 | GAL |
$2.45 |
$2.75 |
$2.50 |
$3.94 |
| 6 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 630 | TON |
$67.00 |
$67.00 |
$90.00 |
$77.47 |
| 7 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 10,630 | TON |
$67.00 |
$65.20 |
$71.00 |
$78.75 |
| 8 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,084 | TON |
$63.00 |
$56.45 |
$58.00 |
$67.88 |
| 9 | 412 5267 |
COLD MILLING PAVEMENT | 6,296 | SY |
$2.75 |
$2.00 |
$2.00 |
$3.26 |
| 10 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 47,520 | LF |
$0.1800 |
$0.1500 |
$0.0800 |
$0.1000 |
| 11 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,600 | LF |
$25.00 |
$21.35 |
$20.75 |
$15.84 |
| 12 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,700.00 |
$2,345.00 |
$2,250.00 |
$2,244.41 |
| 13 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$4,600.00 |
$5,000.00 |
$5,050.00 |
$1,610.70 |
| 14 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 11 | EA |
$80.00 |
$75.00 |
$74.25 |
$73.93 |
| 15 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$140.00 |
$110.00 |
$175.00 |
$174.27 |
| 16 | 629(C) 4960 |
MAILBOX | 14 | EA |
$40.00 |
$25.00 |
$26.50 |
$26.41 |
| 17 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 12 | EA |
$15.00 |
$10.00 |
$11.00 |
$10.56 |
| 18 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$4,675.00 |
$6,000.00 |
$2,930.94 |
| 19 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 69,200 | LF |
$0.3200 |
$0.3600 |
$0.3800 |
$0.3800 |