BRIDGE AND APPROACHES COUNTY ROAD (EW-67): OVER BUCKEYE CREEK, 4.7 MILES EAST OF THE SH-99 JUNCTION. PROJECT LENGTH = 0.207 MILES

Let date
Thursday, January 20, 2011
Contract
110008
J/P numbers
18168(04)
District
Division 8
County
Creek
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-67): OVER BUCKEYE CREEK, 4.7 MILES EAST OF THE SH-99 JUNCTION. PROJECT LENGTH = 0.207 MILES
Project number
BRO-119D(044)CO

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$742,530
1 BRIDGECO CONTRACTORS, INC. Low bidder $736,532 -0.8%
2 BELK BRIDGE, INC. $743,628 +0.1% +1.0%
3 K & R BUILDERS, INC. $746,758 +0.6% +1.4%
4 PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) $757,539 +2.0% +2.9%
5 Cimarron Construction Company, LLC $797,067 +7.3% +8.2%
6 Reece Construction Co, Inc. $818,831 +10.3% +11.2%

Bid tab: unit prices 38 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIDGECO CONTRA…#2 BELK BRIDGE, IN…#3 K & R BUILDERS,…#4 PLAINS BRIDGE C…#5 Cimarron Constr…#6 Reece Construct…
1201 0102 CLEARING AND GRUBBING1LSUM $8,000.00 $5,000.00 $7,000.00 $7,750.00 $6,600.00 $23,345.00 $2,000.00
2202(G) 0185 EARTHWORK1LSUM $10,000.00 $67,000.00 $62,000.00 $73,000.00 $63,382.00 $91,025.00 $85,000.00
3205 4229 TYPE A-SALVAGED TOPSOIL1LSUM $20,000.00 $3,000.00 $3,000.00 $4,500.00 $6,050.00 $4,005.00 $3,500.00
4223 2801 TEMPORARY SILT FENCE500LF $3.00 $2.00 $1.20 $1.85 $1.87 $1.80 $1.20
5227 0100 TEMPORARY SILT DIKE500LF $7.00 $7.00 $1.00 $7.00 $6.60 $6.40 $5.50
6230(A) 2806 SOLID SLAB SODDING12,406SY $2.50 $2.00 $1.60 $1.43 $1.43 $1.40 $1.60
7233(A) 2817 VEGETATIVE MULCHING2.56AC $500.00 $400.00 $360.00 $120.00 $704.00 $250.00 $360.00
8327(A) 4200 (SP)FLY ASH112TON $50.00 $73.00 $66.00 $66.00 $66.00 $59.00 $55.22
9327(E) 4240 (SP)CEMENTITIOUS STABILIZED SUBGRADE2,524SY $3.00 $3.00 $2.25 $4.40 $4.35 $3.35 $3.16
10407 0250 TACK COAT282GAL $2.00 $5.00 $4.00 $4.40 $3.30 $2.45 $2.28
11408 5774 PRIME COAT439GAL $5.00 $9.00 $8.00 $7.40 $7.70 $5.80 $5.47
12411(S3) 5945 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK)672TON $70.00 $79.00 $71.65 $70.00 $66.55 $67.50 $62.87
13411(S4) 5960 (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK)326TON $80.00 $85.50 $77.70 $85.00 $73.70 $82.00 $76.44
14509(D) 0325 CLASS C CONCRETE10CY $290.00 $250.00 $100.00 $237.50 $347.60 $300.00 $267.00
15601(A) 0297 TYPE I PLAIN RIPRAP631TON $40.00 $31.50 $29.25 $33.50 $38.07 $35.00 $35.00
16613(CC) 7187 TYPE B4 CULVERT END TREATMENT4EA $1,000.00 $700.00 $900.00 $875.00 $880.00 $860.00 $800.00
17613(D) 0690 24" CORR. GALV. STEEL PIPE114LF $30.00 $26.00 $33.00 $23.00 $28.44 $29.00 $28.15
18854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)2,269LF $0.3000 $0.7500 $0.3500 $0.3000 $0.2800 $0.2700 $0.2500
19880(C) 8845 BARRICADES(TYPE III)2EA $300.00 $300.00 $250.00 $935.00 $242.00 $235.00 $220.00
20501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON68CY $15.00 $12.00 $15.00 $9.00 $13.20 $13.00 $46.00
21501(D) 6353 UNCLASSIFIED BACKFILL50CY $20.00 $12.00 $40.00 $12.50 $13.20 $13.00 $46.00
22503(B) 6144 PRESTRESSED CONCRETE DOUBLE TEE817.5LF $225.00 $210.00 $230.00 $213.50 $237.01 $231.00 $256.00
23504(E) 1380 CONCRETE RAIL (TR1)387LF $70.00 $48.00 $85.00 $62.50 $64.11 $57.00 $74.00
24509(A) 1326 CLASS AA CONCRETE112CY $430.00 $400.00 $425.00 $485.00 $385.81 $547.00 $340.00
25509(B) 1328 CLASS A CONCRETE81.7CY $430.00 $400.00 $425.00 $520.00 $378.84 $576.00 $719.00
26511(A) 1332 REINFORCING STEEL32,025LB $0.8000 $1.00 $1.22 $0.8700 $0.8900 $0.7400 $0.7000
27514 6260 (PL)PILOT HOLES69.5LF $150.00 $94.00 $75.00 $110.00 $113.30 $105.00 $103.00
28514(A) 6010 PILES, FURNISHED (HP 10X42)305LF $30.00 $32.00 $18.00 $35.00 $31.76 $45.35 $38.00
29514(B) 6292 PILES, DRIVEN (HP 10X42)305LF $15.00 $15.00 $9.00 $10.00 $18.04 $20.35 $10.00
30516(A) 6093 DRILLED SHAFTS 42" DIAMETER122.4LF $525.00 $618.00 $550.00 $517.00 $687.02 $564.50 $570.00
31601(A-1)1353 TYPE I-A PLAIN RIPRAP1,287TON $55.00 $31.50 $29.25 $33.50 $33.89 $34.10 $35.00
32601(A-2)1355 TYPE I-A FILTER BLANKET382TON $45.00 $30.00 $21.75 $30.00 $38.07 $27.05 $23.44
33619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $5,000.00 $8,000.00 $5,250.00 $4,400.00 $5,380.00 $7,514.00
34623(F) 6033 GUARD RAIL ANCHOR UNIT (TYPE II)4EA $2,500.00 $2,000.00 $1,900.00 $2,165.00 $2,194.50 $2,500.00 $1,900.00
35880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $4,000.00 $4,500.00 $4,250.00 $2,850.00 $2,420.00 $2,365.00 $2,200.00
36642 0098 STAKING1LSUM $5,000.00 $6,000.00 $4,550.00 $5,000.00 $5,390.00 $6,710.00 $4,000.00
37220 2800 (SP)SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,500.00 $2,500.00 $3,000.00 $2,750.00 $6,050.00 $2,000.00
38641 1399 MOBILIZATION1LSUM $15,000.00 $23,000.00 $31,500.00 $20,500.00 $19,079.75 $7,665.00 $56,200.00